Block 4028, lot 001
2211 18th St
- City’s use
- Multi-Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 9,958 sq ft
- Lot
- 4,996 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 2211 18th St | unit 12-legalize gas fireplace ref. #202212299364. gas fireplace must direct-vent & seal combustion typeDetails
unit 12-legalize gas fireplace ref. #202212299364. gas fireplace must direct-vent & seal combustion type | $3,000 | |
| Sep 5, 2023 | Completed final sign-off Aug 2024 | 600 Vermont St | Project Contractor Inc | revise 202308214851. utilize (e) fire protection system pipling in new system per nfpa 2022Details
revise 202308214851. utilize (e) fire protection system pipling in new system per nfpa 2022 | |
| Aug 21, 2023 | Completed final sign-off Aug 2024 | 600 Vermont St | Project Contractor Inc | installation of 35 fire sprinklers head system at gr fl new dwelling units according to 202212067735, 202305308851, and 202212299364 per nfpa 13 2022 and dedicated underground piping per nfpa 24 (trench, backfill, and sidewalk repair separate permit)Details
installation of 35 fire sprinklers head system at gr fl new dwelling units according to 202212067735, 202305308851, and 202212299364 per nfpa 13 2022 and dedicated underground piping per nfpa 24 (trench, backfill, and sidewalk repair separate permit) | $24,500 |
| May 30, 2023 | Completed final sign-off Jun 2024 | 600 Vermont St | proposed seismic strengthening to comply w/ san francisco soft story ordinance & sfbc ch. 34b for commercial. all work within (e) boundary of bldg.Details
proposed seismic strengthening to comply w/ san francisco soft story ordinance & sfbc ch. 34b for commercial. all work within (e) boundary of bldg. | $30,000 | |
| Mar 6, 2023 | Completed final sign-off Oct 2023 | 600 Vermont St | O Donoghue Construction Inc. | ada access barrier removal, new ada bathroom, new ada counterDetails
ada access barrier removal, new ada bathroom, new ada counter | $50,000 |
| Feb 17, 2023 | Completed final sign-off Oct 2025 | 600 Vermont St | Security Engineers Inc | upgrade fire alarm system to comply with sffc sec 1103.7.6.1. install 31 low freq sounders in all sleeping areas, facu, wireless comm, power booster, 9 pulls, 7 smokes, 3 horn/strobes.Details
upgrade fire alarm system to comply with sffc sec 1103.7.6.1. install 31 low freq sounders in all sleeping areas, facu, wireless comm, power booster, 9 pulls, 7 smokes, 3 horn/strobes. | $30,000 |
| Dec 29, 2022 | Completed final sign-off Aug 2024 | 600 Vermont St | to legalize three illegal units @ basement (unit#12, 13 & 14). all work within (e) boundary of bldg. adu per ord 162-16Details
to legalize three illegal units @ basement (unit#12, 13 & 14). all work within (e) boundary of bldg. adu per ord 162-16 | $500,000 | |
| Dec 6, 2022 | Completed final sign-off Jun 2024 | 600 Vermont St | seismic strengtening to comply with san francisco soft story ordinance & sfbc ch.34b-all work within (e) boundary of bldg.Details
seismic strengtening to comply with san francisco soft story ordinance & sfbc ch.34b-all work within (e) boundary of bldg. | $120,000 | |
| Aug 31, 2017 | Expired or cancelled cancelled Feb 2020 | 600 Vermont St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $175,000 | |
| Oct 1, 2009 | Never finaled issued Dec 2009, no final | 600 Vermont St | convert (e) storage into new exercise room & lounge area at 1st floor, add new windows for new exercise room, lounge area at 1st floor, add grade stairs access to 1st floor from rear drivewayDetails
convert (e) storage into new exercise room & lounge area at 1st floor, add new windows for new exercise room, lounge area at 1st floor, add grade stairs access to 1st floor from rear driveway | $20,000 | |
| Dec 10, 2004 | Completed final sign-off Dec 2004 | 600 Vermont St | reinforce ceiling joist by adding new beams. all work to be performed within (e) boundry of bldg.Details
reinforce ceiling joist by adding new beams. all work to be performed within (e) boundry of bldg. | $20,000 | |
| Nov 9, 2004 | Completed final sign-off Dec 2004 | 604 Vermont St | remodel kitchen & baths. no structural.Details
remodel kitchen & baths. no structural. | $11,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.