O Donoghue Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Jun 2026
- Last 24 months
- 14 permits filed
113 permits since 2000: 95 completed, 4 in progress, 13 never finaled, 1 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 in progress. Typically 172 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 755 Duncan St | revision to 202303103512. add new roof deck at e roof. provide new operable skylight for roof access. provide new interior from 3rd fl to roof deck. provide new 30' high 1 hr rated parapet adjacent to skylight opening for fire protection.Details
revision to 202303103512. add new roof deck at e roof. provide new operable skylight for roof access. provide new interior from 3rd fl to roof deck. provide new 30' high 1 hr rated parapet adjacent to skylight opening for fire protection. | $12,500 |
| May 1, 2025 | In progress issued May 2026 | 1057 Pacific Av | vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit.Details
vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit. | $915,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2017 | 2845 Noriega St | interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg.Details
interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg. | $180,000 |
| May 8, 2014 | Completed final sign-off Jan 2017 | 1501 Folsom St | proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required.Details
proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required. | $500,000 |