Roof deck contractors in San Francisco
1,520 contractors have filed roof deck permits in San Francisco since 2000. By permit record, the leaders are: R & D Construction Co Inc (21 of 22 completed), Reliable Construction Inc (8 of 9 completed) and Gil Construction & Assoc Inc. (13 of 14 completed).
Ranked across every roof deck permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the roof deck contractors, the 400 that lead on this sort were read; the rest are not in this list. Showing contractors with a roof deck permit in the last 5 years. Include inactive contractors
- 1R & D Construction Co IncLicense 825438 22 permits: 21 completed, 1 expired or cancelled. Last filed Oct 2022. Typically 322 days from permit to final inspection.
- 2Reliable Construction IncLicense 983658 9 permits: 8 completed, 1 in progress. Last filed Oct 2025. Typically 266 days from permit to final inspection.
- 3Gil Construction & Assoc Inc.License 703705 14 permits: 13 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 84 days from permit to final inspection.
- 4Andrew Chekene Enterprises/ Dba Ac EnterLicense 844979 7 permits: 7 completed. Last filed Aug 2025. Typically 251 days from permit to final inspection.
- 5Dawson - Clinton Gen Contr CorpLicense 791724 7 permits: 6 completed, 1 in progress. Last filed Oct 2026. Typically 758 days from permit to final inspection.
- 6Bbc Construction Inc.License 800744 6 permits: 6 completed. Last filed Dec 2024. Typically 299 days from permit to final inspection.
- 7Cej Construction LlcLicense 1031309 6 permits: 6 completed. Last filed Aug 2022. Typically 405 days from permit to final inspection.
- 8Wei Dang Builders Inc.License 1048344 6 permits: 6 completed. Last filed May 2025. Typically 360 days from permit to final inspection.
- 9Cook ConstructionLicense 903971 12 permits: 10 completed, 1 in progress, 1 never finaled. Last filed Nov 2026. Typically 707 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 10Level 8 Construction IncLicense 851171 15 permits: 13 completed, 1 never finaled, 1 expired or cancelled. Last filed Mar 2024. Typically 165 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 11Yefa Construction IncLicense 1047719 7 permits: 5 completed, 2 in progress. Last filed Jun 2026. Typically 336 days from permit to final inspection.
- 12Fontana Construction, Inc.License 487928 6 permits: 5 completed, 1 in progress. Last filed Jul 2026. Typically 366 days from permit to final inspection.
- 13Arcon Construction CorpLicense 774398 5 permits: 5 completed. Last filed Apr 2026. Typically 286 days from permit to final inspection.
- 14The Great Ocean General ContractorLicense 971920 5 permits: 5 completed. Last filed Jun 2022. Typically 342 days from permit to final inspection.
- 15Traube Construction CompanyLicense 974146 5 permits: 5 completed. Last filed Aug 2022. Typically 277 days from permit to final inspection.
- 16Eastwood Development IncorporatedLicense 959948 11 permits: 8 completed, 2 in progress, 1 expired or cancelled. Last filed Sep 2026. Typically 236 days from permit to final inspection.
- 17Truebeck ConstructionLicense 903798 9 permits: 8 completed, 1 never finaled. Last filed May 2026. Typically 238 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 18S F Garage Company Inc.License 684863 41 permits: 30 completed, 3 never finaled, 8 expired or cancelled. Last filed Sep 2023. Typically 367 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
- 19Bc United Construction IncLicense 995115 5 permits: 4 completed, 1 in progress. Last filed May 2024. Typically 391 days from permit to final inspection.
- 20San Francisco Design BuildLicense 950725 5 permits: 4 completed, 1 in progress. Last filed Mar 2026. Typically 362 days from permit to final inspection.
- 21Cardea Bldg Dba Dimension Design GroupLicense 860686 4 permits: 4 completed. Last filed Aug 2023. Typically 374 days from permit to final inspection.
- 22Custom Construction EnterprisesLicense 830244 4 permits: 4 completed. Last filed Aug 2022. Typically 426 days from permit to final inspection.
- 23Nelson ContractingLicense 894609 4 permits: 4 completed. Last filed Feb 2023. Typically 22 days from permit to final inspection.
- 24Pacific Edge Construction IncLicense 984783 4 permits: 4 completed. Last filed Sep 2023. Typically 503 days from permit to final inspection.
- 25Rossi Builders Inc.License 229568 4 permits: 4 completed. Last filed Oct 2022. Typically 709 days from permit to final inspection.
- 26Urbnbuild IncLicense 1047320 4 permits: 4 completed. Last filed Feb 2024. Typically 668 days from permit to final inspection.
- 27Matarozzi/Pelsinger Builders Inc.License 747611 15 permits: 12 completed, 2 never finaled, 1 expired or cancelled. Last filed Nov 2023. Typically 412 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old.
- 28Ggd Inc.License 913596 10 permits: 7 completed, 2 in progress, 1 never finaled. Last filed Aug 2025. Typically 448 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 29Achill Beg Construction IncLicense 709622 9 permits: 7 completed, 1 in progress, 1 never finaled. Last filed Nov 2023. Typically 429 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 30C H Burnham IncLicense 965331 9 permits: 7 completed, 1 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 410 days from permit to final inspection.
- 31Terence Mcmahon ConstructionLicense 797580 9 permits: 7 completed, 1 in progress, 1 expired or cancelled. Last filed May 2026. Typically 175 days from permit to final inspection.
- 32Christopher Wells Construction Inc.License 442455 8 permits: 7 completed, 1 expired or cancelled. Last filed Jul 2023. Typically 92 days from permit to final inspection.
- 33Damar Construction And Remodeling IncLicense 946514 8 permits: 7 completed, 1 never finaled. Last filed Jun 2026. Typically 534 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 34K 2 Builders IncLicense 877856 8 permits: 7 completed, 1 never finaled. Last filed Jul 2025. Typically 447 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 35Sasso Construction Inc.License 911044 8 permits: 7 completed, 1 expired or cancelled. Last filed Dec 2022. Typically 184 days from permit to final inspection.
- 36Green City Construction IncLicense 951276 15 permits: 11 completed, 1 in progress, 3 never finaled. Last filed Jul 2026. Typically 472 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
- 37Devlin/Mcnally ConstructionLicense 896044 9 permits: 6 completed, 2 in progress, 1 expired or cancelled. Last filed Feb 2026. Typically 298 days from permit to final inspection.
- 38Bay Build Design IncLicense 919931 7 permits: 6 completed, 1 never finaled. Last filed Jul 2024. Typically 342 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old. 1 was filed but never issued.
- 39Bay C T Construction Inc.License 922224 7 permits: 6 completed, 1 never finaled. Last filed Jul 2025. Typically 629 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 40Crown Construction San FranciscoLicense 991598 7 permits: 6 completed, 1 expired or cancelled. Last filed Oct 2024. Typically 586 days from permit to final inspection.
How long roof deck permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent roof deck permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 121 Yukon St | Mission Home Remodeling Inc | convert garage to studio (unit 3) w/ new kitch & bath. 2nd/f remodel #1 create new bedrm & laundry. new interior stair to 3rd flr, remodel #2 into a studio. 3rd flr: convert unit 3 into part of unit 1, (n) master bedroom w/ bath, (n) addition with bed & bath & stair. (n) roof deck.Details
convert garage to studio (unit 3) w/ new kitch & bath. 2nd/f remodel #1 create new bedrm & laundry. new interior stair to 3rd flr, remodel #2 into a studio. 3rd flr: convert unit 3 into part of unit 1, (n) master bedroom w/ bath, (n) addition with bed & bath & stair. (n) roof deck. | |
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 2829 Pacific Av | Cook Construction | repair & rebuild in-kind (e) non-conforming deck structure & garage roof deck within (e) footprint to address water damage; waterproofing & drainage.Details
repair & rebuild in-kind (e) non-conforming deck structure & garage roof deck within (e) footprint to address water damage; waterproofing & drainage. | $45,900 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 2459 Francisco St | Ams Construction | revision to pa#202304266535: add stairs from (e) 3/f up to rooftop deck. add decking and railing, no penthouse.Details
revision to pa#202304266535: add stairs from (e) 3/f up to rooftop deck. add decking and railing, no penthouse. | $16,400 |
| Nov 19, 2026 | In progress filed Nov 2026, not yet issued | 4168 26th St | basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet.Details
basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet. | $330,000 | |
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 176 Corona St | Mizen Construction Inc | 182 s.f. of (n) rear addition to 1st flr w/ (n) 263 s.f. flat roof above (e) 56 s.f. rear roof deck above 1st flr reframed & enlarged to (n) 165 s.f. roof deck.interior renovations @ 1st flr & 2nd flr.(n) rear wd. framed decks & rear yard modifications.replace stucco & upgrade all (e) windows to (n)Details
182 s.f. of (n) rear addition to 1st flr w/ (n) 263 s.f. flat roof above (e) 56 s.f. rear roof deck above 1st flr reframed & enlarged to (n) 165 s.f. roof deck.interior renovations @ 1st flr & 2nd flr.(n) rear wd. framed decks & rear yard modifications.replace stucco & upgrade all (e) windows to (n) | $367,000 |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 543 Jersey St | horizontal & vertical addition. new roof deck. new adu.Details
horizontal & vertical addition. new roof deck. new adu. | $200,000 | |
| Nov 13, 2026 | In progress filed Nov 2026, not yet issued | 201 Capra Wy | 1st floor horizontal addition at rear. expand e 1 story roof deck in the rear yard. remodel e kitchen, baths, laundry room. convert e family room at gr fl into bedrooms and bath. replace exterior windows and doors.Details
1st floor horizontal addition at rear. expand e 1 story roof deck in the rear yard. remodel e kitchen, baths, laundry room. convert e family room at gr fl into bedrooms and bath. replace exterior windows and doors. | $380,000 | |
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 2545 Greenwich St | rev 201309177050:remove below-grd storage area.revert garage plate ht to unchanged.revert 1/f plate ht to unchanged.2/f plate ht to be 1ft higher than approved from 30-8 to 31-8. revise 3/f plan on e/s & move roof deck staircase from interior to exterior.Details
rev 201309177050:remove below-grd storage area.revert garage plate ht to unchanged.revert 1/f plate ht to unchanged.2/f plate ht to be 1ft higher than approved from 30-8 to 31-8. revise 3/f plan on e/s & move roof deck staircase from interior to exterior. | $20,000 | |
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 340 27th St | Sierra Builders & Design Inc | add elevator and interior stair. add roof deck on addition. at street facade replace existing guardrails, expand stair landing at 2nd floor, add deck at first floor.Details
add elevator and interior stair. add roof deck on addition. at street facade replace existing guardrails, expand stair landing at 2nd floor, add deck at first floor. | $568,000 |
| Nov 6, 2026 | In progress filed Nov 2026, not yet issued | 1990 Lombard St | Upscale Construction Inc. | conversion of office suite on 3/f into 4 residental dwelling units. new roof decks; new windows at 3/f.Details
conversion of office suite on 3/f into 4 residental dwelling units. new roof decks; new windows at 3/f. | $750,000 |
| Nov 4, 2026 | In progress filed Nov 2026, not yet issued | 1736 Larkin St | vertical addition:add 3 bedrooms,1 gym, 3 bathrooms,1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access ab112Details
vertical addition:add 3 bedrooms,1 gym, 3 bathrooms,1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access ab112 | $500,000 | |
| Nov 3, 2026 | In progress issued Nov 2026 | 280 Roosevelt Wy | to comply with boa's decision 26-053 and 26-056 revision to pa 202608176686 clarify propert line locations, relocate parapet @ 2nd fl roof deck; delete parapet @ (e) skylight; provide 5' setback from roof deck to south property lineDetails
to comply with boa's decision 26-053 and 26-056 revision to pa 202608176686 clarify propert line locations, relocate parapet @ 2nd fl roof deck; delete parapet @ (e) skylight; provide 5' setback from roof deck to south property line | ||
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 856 Clayton St | a horizontal rear addition at all floors of structure, and rear deck infill at 2nd floor, a (n) roof deck will be built above (n) conditioned floor space at 2nd floor-accessed from 9e) third floor. a (n) shed roof dormer has been added ar the north side of the 9e) gable roof for an (e) 3rd floor b..Details
a horizontal rear addition at all floors of structure, and rear deck infill at 2nd floor, a (n) roof deck will be built above (n) conditioned floor space at 2nd floor-accessed from 9e) third floor. a (n) shed roof dormer has been added ar the north side of the 9e) gable roof for an (e) 3rd floor b.. | $500,000 | |
| Nov 2, 2026 | In progress filed Nov 2026, not yet issued | 763 Kansas St | alteration of the roof deck gaurdrail. revision to bpa #202311030086, the approved plans called for cable rail detail, whereas the proposed plan calls for a glass gaurdrail. no change to the structure/ steel stanchions.Details
alteration of the roof deck gaurdrail. revision to bpa #202311030086, the approved plans called for cable rail detail, whereas the proposed plan calls for a glass gaurdrail. no change to the structure/ steel stanchions. | ||
| Nov 2, 2026 | In progress filed Nov 2026, not yet issued | 8231 Geary Bl | Golden Hammer | new horizontal addition (430 sf) new bathoom on the 1st fl. new roof deck above horizontal addition (220 sf roof deckDetails
new horizontal addition (430 sf) new bathoom on the 1st fl. new roof deck above horizontal addition (220 sf roof deck | $100,000 |
| Oct 30, 2026 | In progress issued Nov 2026 | 1271 Fitzgerald Av | Cluster Construction Inc | to comply with nov #202183558 & 202286998: 1) demolish the deck work without permit being built at rear of p/l. 2) demolish the horizontal addition (work without permit) around 14' long x 25' wide over the rear roof deck. 3) build new stairs lead from the roof deck to the back yard.Details
to comply with nov #202183558 & 202286998: 1) demolish the deck work without permit being built at rear of p/l. 2) demolish the horizontal addition (work without permit) around 14' long x 25' wide over the rear roof deck. 3) build new stairs lead from the roof deck to the back yard. | $18,000 |
| Oct 29, 2026 | In progress issued Oct 2026 | 259 17th Av | Sunset Remodeling And Design Inc | revision to pa #202610028997. 3rd floor roof deck approved under this permit. 3rd floor: remove 3rd floor roof deck per neighbor's request.Details
revision to pa #202610028997. 3rd floor roof deck approved under this permit. 3rd floor: remove 3rd floor roof deck per neighbor's request. | |
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 148 Duncan St | 1st floor: replace existing window with new door and 2 deck columns with new wall. 3rd floor 148 duncan st.: convert existing rear addition roof deck into new bedroom with bay window. add new hallway & 2 skylights.Details
1st floor: replace existing window with new door and 2 deck columns with new wall. 3rd floor 148 duncan st.: convert existing rear addition roof deck into new bedroom with bay window. add new hallway & 2 skylights. | $100,000 | |
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 2037 Scott St | residential remodel, new stair and lading work, structural/mep modifications, and a new roof deck with retractable skylight & guardrails.Details
residential remodel, new stair and lading work, structural/mep modifications, and a new roof deck with retractable skylight & guardrails. | $150,000 | |
| Oct 20, 2026 | In progress filed Oct 2026, not yet issued | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.Details
1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 16, 2026 | In progress issued Oct 2026 | 28 Hartford St | Olcan Construction Inc | repair dry rot on rear roof deck and replace rotten guard rail. all work at rear of house not visible from the street. less than 50%. in-kindDetails
repair dry rot on rear roof deck and replace rotten guard rail. all work at rear of house not visible from the street. less than 50%. in-kind | $19,000 |
| Oct 16, 2026 | In progress issued Oct 2026 | 3647 Noriega St | revision to pa # 202609117969 & 202609218416. change ceiling joist to lvl at 2nd floor, remove storage closet at ground floor. add new deck and roof deck per plan and add storage at yard of <120 sqft.Details
revision to pa # 202609117969 & 202609218416. change ceiling joist to lvl at 2nd floor, remove storage closet at ground floor. add new deck and roof deck per plan and add storage at yard of <120 sqft. | $30,000 | |
| Oct 15, 2026 | In progress issued Nov 2026 | 1391 Vallejo St | Brennan Strong Hold Construction Inc | revision to bpa: 202609117958 - addition of new condition space for 1391 and remodel (e) kitchen and stair. install new stair to roof deck for 1393 and remodel kitchen.Details
revision to bpa: 202609117958 - addition of new condition space for 1391 and remodel (e) kitchen and stair. install new stair to roof deck for 1393 and remodel kitchen. | $125,000 |
| Oct 13, 2026 | In progress filed Oct 2026, not yet issued | 2111 Greenwich St | addition & remodel of (e) roof decks, dwekkubgl extend (e) lower roof deck, add (n) safety rails to (n) area of deck to match (e); add (n) bar area with fridge (n) benches,(n) benches & (n) planting boxes; remodel (e) roof decks - total (e) & (n) decks not to exceed 500 sq ft per level. 1st fl -Details
addition & remodel of (e) roof decks, dwekkubgl extend (e) lower roof deck, add (n) safety rails to (n) area of deck to match (e); add (n) bar area with fridge (n) benches,(n) benches & (n) planting boxes; remodel (e) roof decks - total (e) & (n) decks not to exceed 500 sq ft per level. 1st fl - | $25,000 | |
| Oct 13, 2026 | In progress issued Nov 2026 | 21 05th Av | Saturn Construction Co | revision to issued pa# 202604229887 to reflect founation and soil shoring, changes and assocated layout changes to 1/f , roof deck scope removed.Details
revision to issued pa# 202604229887 to reflect founation and soil shoring, changes and assocated layout changes to 1/f , roof deck scope removed. | |
| Oct 13, 2026 | In progress filed Oct 2026, not yet issued | 648 18th Av | rear horizontal addition at levels 2 and 3, and new roof deck at level 3 rear. reconfigure existing kitchen and toilet room at level 2.Details
rear horizontal addition at levels 2 and 3, and new roof deck at level 3 rear. reconfigure existing kitchen and toilet room at level 2. | $100,000 | |
| Oct 13, 2026 | In progress filed Oct 2026, not yet issued | 1852 10th Av | expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n)Details
expansin on 1st floor to match upper floor footprint to add 3 bedrooms and 2 bathrooms interior remodeling of 2nd floor including relocating 2 stairs and bath and addition of 1/2 bath. proposed (n) stair to back yard from (e) deck proposed roof deck. complete structrual upgrade including (n) | $300,000 | |
| Oct 8, 2026 | In progress filed Oct 2026, not yet issued | 768 Bay St | front building: new 400 sq.ft roof deck with 50 sq.ft planting area, including associated structural work, and outdoor kitchen.Details
front building: new 400 sq.ft roof deck with 50 sq.ft planting area, including associated structural work, and outdoor kitchen. | $50,000 | |
| Oct 8, 2026 | In progress filed Oct 2026, not yet issued | 1272 California St | Dawson - Clinton Gen Contr Corp | revision to pa #202607084677 & 202608287342: new dormers, new full bath, & new roof deck.Details
revision to pa #202607084677 & 202608287342: new dormers, new full bath, & new roof deck. | $45,000 |
| Oct 7, 2026 | In progress filed Oct 2026, not yet issued | 51 Wood St | Manzyuk Enterprises Inc | interior remodel of both residential units: relocation of kitchens, remodel of one bathroom in each unit, addition of one bathroom in each unit; construction of roof deck; installation of clothes washer and dryer in each unit, partial voluntary seismic upgrade.Details
interior remodel of both residential units: relocation of kitchens, remodel of one bathroom in each unit, addition of one bathroom in each unit; construction of roof deck; installation of clothes washer and dryer in each unit, partial voluntary seismic upgrade. | $74,500 |