Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 19 permits filed
180 permits since 2000: 134 completed, 13 in progress, 27 never finaled, 6 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Roof deck permits
11 roof deck permits: 10 completed, 1 never finaled. Typically 190 days from filing to permit and 707 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2024 | Completed | 2830 Filbert St | construction of new occupied roof deck and deck access | $45,000 |
| Oct 4, 2022 | Completed | 12 Rossi Av | interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairs | $500,000 |
| Jul 21, 2021 | Completed | 50 Surrey St | revision to app#202008141750: consists of relocation of garage door 3'-5" back from approved location, elimination of concrete landing at front stair, expanding portion of roof deck to adj. propertyline | $10,000 |
| Jan 9, 2020 | Completed | 3010 Pacific Av | 1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stair | $200,000 |
| May 14, 2019 | Completed | 2830 Filbert St | rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit. | $780,600 |
| Dec 8, 2017 | Completed | 101 Terrace Dr | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Oct 4, 2017 | Completed | 431 Avila St | interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street). | $170,000 |
| Mar 27, 2015 | Never finaled | 2717 Pacific Av | new roof deck per plan. new windows at propery line per plan. new 6 windows per plan. all work sare on the top floor. | $30,000 |
| Mar 21, 2014 | Completed | 2005 Buchanan St | add new (third) floor w/ flat roof to existing two-story, two-unit building, new floor to consist of two bedrooms, two bathrooms & roof deck. | $300,000 |
| May 14, 2013 | Completed | 959 Ashbury St | 2 story horiz. addition at rear with roof decks at 2nd & 3rd floor. 2 story horiz. addition at south side with ext. stair to grade. enlarge (e) 4th floor dormer. interior remodel kitchen & (4) baths. (n) patio at rear yard. | $400,000 |
| Jul 5, 2012 | Completed | 1763 Stockton St | replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000 | $340,000 |