Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 19 permits filed
180 permits since 2000: 134 completed, 12 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 13 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
10 deck permits: 4 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 55 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2025 | In progress issued Aug 2025 | 3777 22nd St | rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run withDetails
rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run with | $25,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2022 | 2737 Clay St | the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck.Details
the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck. | $65,000 |
| Feb 19, 2016 | Never finaled issued Oct 2016, no final | 145 Mallorca Wy | replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155Details
replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155 | $30,000 |
| Jun 9, 2015 | Completed final sign-off Sep 2016 | 20 25th North Av | 1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher.Details
1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher. | $130,000 |
| Jul 28, 2014 | Never finaled issued Aug 2014, no final | 69 San Anselmo Av | revision to app#201312053447 to increase construction valuation to 150 k and add scope of work of new exterior deck and stairs. remodel upper bathroom as built.Details
revision to app#201312053447 to increase construction valuation to 150 k and add scope of work of new exterior deck and stairs. remodel upper bathroom as built. | $100,000 |
| Oct 28, 2013 | Completed final sign-off Jul 2015 | 869 Clayton St | remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units.Details
remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units. | $90,000 |
| May 24, 2011 | Expired or cancelled withdrawn May 2015 | 2550 Greenwich St | installation of new fence on property line at rear of h ouse less than 6 ft tall. landscape rear yard. new security gate. new staircase at rear yard to connect 2 existing decks less than 3ft off groundDetails
installation of new fence on property line at rear of h ouse less than 6 ft tall. landscape rear yard. new security gate. new staircase at rear yard to connect 2 existing decks less than 3ft off ground | $30,000 |
| Feb 8, 2010 | Completed final sign-off Sep 2011 | 3321 Octavia St | demolition of (e) concrete slab at rear of house. install (n) footing to support fire barrier wall on proprety line. erection of (n) ep deck on 2nd. floor with spiral stairs. per case no. 2010.0547v.Details
demolition of (e) concrete slab at rear of house. install (n) footing to support fire barrier wall on proprety line. erection of (n) ep deck on 2nd. floor with spiral stairs. per case no. 2010.0547v. | $20,000 |