Back to bathroom remodel contractors
Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 19 permits filed
180 permits since 2000: 134 completed, 12 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 13 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
71 bathroom remodel permits: 57 completed, 4 in progress, 9 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Jun 2026 | 2829 Pacific Av | remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft.Details
remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft. | $250,000 |
| Jan 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout.Details
interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout. | $100,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923.Details
remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923. | |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations)Details
remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations) | $60,000 |
| May 24, 2024 | Completed final sign-off Oct 2025 | 2212 Lake St | interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath.Details
interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath. | $30,000 |
| Mar 14, 2024 | Completed final sign-off Dec 2025 | 2212 Lake St | 1 kitchen, 3 bathrooms - replacement in kindDetails
1 kitchen, 3 bathrooms - replacement in kind | $350,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind.Details
remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind. | $100,000 |
| Jan 10, 2023 | Completed final sign-off May 2024 | 625 El Camino Del Mar | basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled.Details
basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled. | $20,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2024 | 625 El Camino Del Mar | (1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work.Details
(1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work. | $100,000 |
| Oct 4, 2022 | Completed final sign-off Apr 2025 | 12 Rossi Av | interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairsDetails
interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairs | $500,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Aug 14, 2020 | Completed final sign-off Aug 2022 | 50 Surrey St | revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st flDetails
revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st fl | $185,000 |
| Jan 9, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | 1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stairDetails
1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stair | $200,000 |
| Sep 25, 2019 | Completed final sign-off Jan 2021 | 135 Avila St | installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5Details
installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5 | $20,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind.Details
renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind. | $250,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall.Details
horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall. | $120,000 |
| May 14, 2019 | Completed final sign-off Feb 2026 | 2830 Filbert St | rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit.Details
rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit. | $780,600 |
| Aug 27, 2018 | Completed final sign-off Feb 2019 | 1080 Chestnut St | replace fixtures and finishes at kitchen and (1) bathroom. no structural workDetails
replace fixtures and finishes at kitchen and (1) bathroom. no structural work | $20,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 150 Glenbrook Av | revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor.Details
revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor. | |
| May 18, 2018 | Never finaled issued Jun 2018, no final | 325 Cornwall St | replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit.Details
replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit. | $200,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2020 | 101 Terrace Dr | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roofDetails
the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Oct 4, 2017 | Completed final sign-off Sep 2019 | 431 Avila St | interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street).Details
interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street). | $170,000 |
| Mar 23, 2017 | Completed final sign-off Nov 2017 | 1020 Union St | unit 23 - add bathroom and washer & dryer closetDetails
unit 23 - add bathroom and washer & dryer closet | $20,000 |
| Nov 29, 2016 | Completed final sign-off Apr 2021 | 10 Normandie Tr | kitchen and 3 bath remodel.Details
kitchen and 3 bath remodel. | $10,000 |
| Oct 18, 2016 | Completed final sign-off Apr 2017 | 1571 Sacramento St | replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors.Details
replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors. | $120,000 |
| Jul 26, 2016 | Never finaled issued Aug 2016, no final | 78 Buchanan St | remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13Details
remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13 | $30,000 |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1340 Lombard St | unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher naDetails
unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher na | $40,000 |
| Jul 14, 2016 | Completed final sign-off Mar 2017 | 1320 Lombard St | remodel unit 605, 7th floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen to bedroom. add washer & dryer. maher naDetails
remodel unit 605, 7th floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen to bedroom. add washer & dryer. maher na | $40,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2017 | 1547 Clay St | 2nd floor unit #101: remodel- (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13Details
2nd floor unit #101: remodel- (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13 | $25,000 |
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 835 Pine St | remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required.Details
remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required. | $25,000 |
| Jun 17, 2016 | Completed final sign-off Feb 2017 | 1760 Golden Gate Av | unit 6, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen into bedroom. add washer & dryer.Details
unit 6, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen into bedroom. add washer & dryer. | $35,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 78 Buchanan St | unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13Details
unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13 | $40,000 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 691 Ofarrell St | 1st floor, unit # 101: remodel (e) kitchen (electric range & hood) & bathroom, add washer & gas dryer.Details
1st floor, unit # 101: remodel (e) kitchen (electric range & hood) & bathroom, add washer & gas dryer. | $25,000 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 2975 Van Ness Av | 4th flr, unit #22: remodel bathroom. relocating kitchen. add washer & dryerDetails
4th flr, unit #22: remodel bathroom. relocating kitchen. add washer & dryer | $30,000 |
| Jun 14, 2016 | Completed final sign-off Jan 2017 | 691 Ofarrell St | 5th floor, unit # 410: remodel (e) kitchen (gas range & hood) & bathroom, add washer & dryer (ventless condensate dryer).Details
5th floor, unit # 410: remodel (e) kitchen (gas range & hood) & bathroom, add washer & dryer (ventless condensate dryer). | $25,000 |
| May 11, 2016 | Completed final sign-off Mar 2017 | 145 Mallorca Wy | demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maherDetails
demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maher | $100,000 |
| Apr 6, 2016 | Completed final sign-off Aug 2016 | 3783 20th St | unit #12 - remodel existing bathroom & existing kitchen, convert existing living room to bedroom. add washer/dryer. n/a maher ordinanceDetails
unit #12 - remodel existing bathroom & existing kitchen, convert existing living room to bedroom. add washer/dryer. n/a maher ordinance | $30,000 |
| Feb 19, 2016 | Never finaled issued Oct 2016, no final | 145 Mallorca Wy | replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155Details
replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155 | $30,000 |
| Feb 3, 2016 | Completed final sign-off Sep 2016 | 60 Santa Marina St | add bathroom to existing structure, add dormer to allow (n) bathroom on 2nd flr window added for ventilation.Details
add bathroom to existing structure, add dormer to allow (n) bathroom on 2nd flr window added for ventilation. | $8,000 |
| Jun 9, 2015 | Completed final sign-off Sep 2016 | 20 25th North Av | 1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher.Details
1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher. | $130,000 |
| Apr 15, 2015 | Completed final sign-off May 2023 | 1973 Broadway | vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovationDetails
vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovation | $500,000 |
| Apr 1, 2015 | Completed final sign-off Feb 2016 | 2106 Jackson St | unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'dDetails
unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'd | $150,000 |
| Feb 11, 2015 | Expired or cancelled expired Mar 2023 | 3630 Jackson St | refurbish and replacement of select interior finishes throughout including kitchen, master bath, 2nd and 3rd floor baths. no relocation of interior walls or structural work to be performedDetails
refurbish and replacement of select interior finishes throughout including kitchen, master bath, 2nd and 3rd floor baths. no relocation of interior walls or structural work to be performed | $40,000 |
| Sep 9, 2014 | Completed final sign-off Feb 2016 | 2106 Jackson St | (e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k.Details
(e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k. | $36,000 |
| Jul 28, 2014 | Never finaled issued Aug 2014, no final | 69 San Anselmo Av | revision to app#201312053447 to increase construction valuation to 150 k and add scope of work of new exterior deck and stairs. remodel upper bathroom as built.Details
revision to app#201312053447 to increase construction valuation to 150 k and add scope of work of new exterior deck and stairs. remodel upper bathroom as built. | $100,000 |
| Jul 25, 2014 | Completed final sign-off Mar 2016 | 2240 Broderick St | interior re-configuratiion of walls, demo slab @ rear, new concrete slab @ 1st flr. new posts+footings @ rear patio. lightwell infill @ 1st & 2nd flrs. enlarge of garage,struct upgrades, new bath & new exercise/ bedroom @ 1st flr.remove int. stair, kitchen remodel,new fxtures, new nfpa 13r sprinkleDetails
interior re-configuratiion of walls, demo slab @ rear, new concrete slab @ 1st flr. new posts+footings @ rear patio. lightwell infill @ 1st & 2nd flrs. enlarge of garage,struct upgrades, new bath & new exercise/ bedroom @ 1st flr.remove int. stair, kitchen remodel,new fxtures, new nfpa 13r sprinkle | $125,000 |
| May 21, 2014 | Never finaled issued Aug 2014, no final | 1763 Stockton St | revision to 20120704121. 3rd fl: add 1 powder room and 1 full bath. 2nd fl: add 1 full bath. relocation of interior walls upper 3 floorsDetails
revision to 20120704121. 3rd fl: add 1 powder room and 1 full bath. 2nd fl: add 1 full bath. relocation of interior walls upper 3 floors | $15,000 |
| Mar 21, 2014 | Completed final sign-off Apr 2016 | 2005 Buchanan St | add new (third) floor w/ flat roof to existing two-story, two-unit building, new floor to consist of two bedrooms, two bathrooms & roof deck.Details
add new (third) floor w/ flat roof to existing two-story, two-unit building, new floor to consist of two bedrooms, two bathrooms & roof deck. | $300,000 |
| Jan 13, 2014 | Completed final sign-off Sep 2014 | 1810 Jackson St | unit #2 - remodel existing bathroom, all plumbing & elec locations to remain the same. finishes & fixtures will be new, lighting to comply cec 150 (k).Details
unit #2 - remodel existing bathroom, all plumbing & elec locations to remain the same. finishes & fixtures will be new, lighting to comply cec 150 (k). | $50,000 |
| Dec 19, 2013 | Completed final sign-off Jun 2014 | 228 30th St | 1)convert 772 sq ft of ground fl utility space to a game rm, family room, & bath. 2) rebuild an extg stair from ground floor to 2nd floor with a new skylight. 3)remodel the extg 2nd flr bath. 4)add a new 2nd floor bath with a nw skylight & reconfigure adjacent closets. 5)minor alteration to 2nd flDetails
1)convert 772 sq ft of ground fl utility space to a game rm, family room, & bath. 2) rebuild an extg stair from ground floor to 2nd floor with a new skylight. 3)remodel the extg 2nd flr bath. 4)add a new 2nd floor bath with a nw skylight & reconfigure adjacent closets. 5)minor alteration to 2nd fl | $80,000 |
| Dec 5, 2013 | Completed final sign-off Dec 2014 | 69 San Anselmo Av | kitchen remodel and ceiling/roof replacement with wall strengthening. window replacement to match style on all windows and add laundry room next to existing bath on main floorDetails
kitchen remodel and ceiling/roof replacement with wall strengthening. window replacement to match style on all windows and add laundry room next to existing bath on main floor | $25,000 |
| Oct 28, 2013 | Completed final sign-off Jul 2015 | 869 Clayton St | remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units.Details
remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units. | $90,000 |
| Aug 13, 2013 | Completed final sign-off Feb 2015 | 3631 23rd St | renovation and reconfiguration of the extg bath area into one space to include new fixtures and finishes. replacement of rear and side windows with same as indicated on plans. 7 double hung wood windows total.Details
renovation and reconfiguration of the extg bath area into one space to include new fixtures and finishes. replacement of rear and side windows with same as indicated on plans. 7 double hung wood windows total. | $12,000 |
| May 14, 2013 | Completed final sign-off Aug 2014 | 959 Ashbury St | 2 story horiz. addition at rear with roof decks at 2nd & 3rd floor. 2 story horiz. addition at south side with ext. stair to grade. enlarge (e) 4th floor dormer. interior remodel kitchen & (4) baths. (n) patio at rear yard.Details
2 story horiz. addition at rear with roof decks at 2nd & 3rd floor. 2 story horiz. addition at south side with ext. stair to grade. enlarge (e) 4th floor dormer. interior remodel kitchen & (4) baths. (n) patio at rear yard. | $400,000 |
| Dec 20, 2012 | Completed final sign-off May 2014 | 2258 Jackson St | condition ext basement storage. new habitable spaces include new bathroom, laundry room, living space at basement. new powder room at 1st floor. new window well at basement. new french doors and permeable patio at front (remove landscaping)Details
condition ext basement storage. new habitable spaces include new bathroom, laundry room, living space at basement. new powder room at 1st floor. new window well at basement. new french doors and permeable patio at front (remove landscaping) | $30,000 |
| Sep 12, 2012 | Completed final sign-off Jan 2016 | 118 09th Av | remove 30 lf wall, (n) kitchen cab., siesmic upgrade, (n) slab on grade, 2-(n) 1/2 bathrooms, (n) lighting, (n) windows @ rear of bldg., co & smoke detectors.Details
remove 30 lf wall, (n) kitchen cab., siesmic upgrade, (n) slab on grade, 2-(n) 1/2 bathrooms, (n) lighting, (n) windows @ rear of bldg., co & smoke detectors. | $180,000 |
| Jul 5, 2012 | Completed final sign-off Apr 2016 | 1763 Stockton St | replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000Details
replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000 | $340,000 |
| Jun 29, 2012 | Completed final sign-off Nov 2012 | 482 Liberty St | removal of tile & tub in master bathroom. relocation of plumbing drain for (n) shower. installation of shower pan & new tile in master bathroom. removal of guest bathroom tub. installation of new tub in guest bathroom. installation of (n) fixts in master shower.Details
removal of tile & tub in master bathroom. relocation of plumbing drain for (n) shower. installation of shower pan & new tile in master bathroom. removal of guest bathroom tub. installation of new tub in guest bathroom. installation of (n) fixts in master shower. | $5,000 |
| Jun 20, 2012 | Completed final sign-off Nov 2012 | 2295 Vallejo St | re-tile of (2) existing bathroom shower areas.Details
re-tile of (2) existing bathroom shower areas. | $5,000 |
| May 25, 2012 | Never finaled issued May 2012, no final | 655 Corbett Av | alteration and remodel of extg kitchen, bathroom, living rooms, and bedroom. installation of new drywall, tile, cabinetry, & paint. demolition of wood burning fireplace to update with non operable opening.Details
alteration and remodel of extg kitchen, bathroom, living rooms, and bedroom. installation of new drywall, tile, cabinetry, & paint. demolition of wood burning fireplace to update with non operable opening. | $50,000 |
| Apr 5, 2012 | Completed final sign-off May 2014 | 2258 Jackson St | enclose first floor lightwell to create unconditional cold storage 15 sq ft. remodel and enlarge extg 2nd story bathroom. relocate childrens closet area to make room for larger bath. installation of new tile and fixtures. bathroom area is 68 sq ft.Details
enclose first floor lightwell to create unconditional cold storage 15 sq ft. remodel and enlarge extg 2nd story bathroom. relocate childrens closet area to make room for larger bath. installation of new tile and fixtures. bathroom area is 68 sq ft. | $10,000 |
| Feb 21, 2012 | Completed final sign-off Jun 2012 | 2152 Larkin St | demolition & remodel of (2) 2nd floor bathrooms - new framing, drywall, plumbing, electrical & fixtures. all work in bathrooms.Details
demolition & remodel of (2) 2nd floor bathrooms - new framing, drywall, plumbing, electrical & fixtures. all work in bathrooms. | $10,000 |
| Jul 18, 2011 | Never finaled issued Jul 2011, no final | 178 Laidley St | demolition of kitchen, installation of new electrical, plumbing. convert (e) closet into half bathroom. new cabinetry & countertops. two new windows in (e) openings, re-tile of (e) bathroom on 2nd floor. installation of 8'-0" lf new footing at garage level. not adding habitable space on garage levelDetails
demolition of kitchen, installation of new electrical, plumbing. convert (e) closet into half bathroom. new cabinetry & countertops. two new windows in (e) openings, re-tile of (e) bathroom on 2nd floor. installation of 8'-0" lf new footing at garage level. not adding habitable space on garage level | $35,000 |
| Jul 1, 2011 | Never finaled issued Jan 2013, no final | 2717 Pacific Av | new vaulted roof at rear (with dormer windows) to replace existing pitched roof. relocate (e) bath.Details
new vaulted roof at rear (with dormer windows) to replace existing pitched roof. relocate (e) bath. | $60,000 |
| May 2, 2011 | Completed final sign-off Aug 2011 | 3747 Scott St | demo of kitchen and closet area. installation of new electrical and plbg in kitchen. installation of (n) bathroom plbg to create new full bath, new kitchen cabs, tile, counter tops.replace kchn wndw in current r.o.installs 3 doors into (e) openings on 2nd floor.Details
demo of kitchen and closet area. installation of new electrical and plbg in kitchen. installation of (n) bathroom plbg to create new full bath, new kitchen cabs, tile, counter tops.replace kchn wndw in current r.o.installs 3 doors into (e) openings on 2nd floor. | $25,000 |
| Aug 4, 2010 | Completed final sign-off Dec 2010 | 3634 20th St | demolition of bathroom tile & drywall. reframe of non-loading bearing wall and new shower location and tile to be installed upgrade of electrical & plumbing, 3rd floor unit#3.Details
demolition of bathroom tile & drywall. reframe of non-loading bearing wall and new shower location and tile to be installed upgrade of electrical & plumbing, 3rd floor unit#3. | $20,000 |
| Jun 2, 2010 | Completed final sign-off Aug 2010 | 819 38th Av | demolition of kitchen & closet area. reframe of (e) porch floor (enclose), new load bearing walls from dining room to kitchen. installation of new kitchen cabinets, drywall & electrical; new plumbing for master bathroom & tile master bathroomDetails
demolition of kitchen & closet area. reframe of (e) porch floor (enclose), new load bearing walls from dining room to kitchen. installation of new kitchen cabinets, drywall & electrical; new plumbing for master bathroom & tile master bathroom | $55,000 |
| Mar 9, 2010 | Completed final sign-off Jun 2010 | 3001 Turk Bl | demolition of tile in 2 bathrooms incl. new shower pans, new electrical, re instalation of fixtures. all work on 2nd anf 3dr floors only.Details
demolition of tile in 2 bathrooms incl. new shower pans, new electrical, re instalation of fixtures. all work on 2nd anf 3dr floors only. | $35,000 |
| Apr 20, 2009 | Completed final sign-off Aug 2009 | 322 06th St | new vanity, tile,tub and shower for main floor bathroom in unit #4Details
new vanity, tile,tub and shower for main floor bathroom in unit #4 | $16,000 |