Back to kitchen remodel contractors
Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 19 permits filed
180 permits since 2000: 134 completed, 12 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 13 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
67 kitchen remodel permits: 52 completed, 6 in progress, 8 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 2829 Pacific Av | int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel.Details
int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel. | $1,804,290 |
| Jun 30, 2026 | In progress issued Jun 2026 | 2829 Pacific Av | remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft.Details
remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft. | $250,000 |
| Jan 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout.Details
interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout. | $100,000 |
| Jul 30, 2025 | In progress issued Aug 2025 | 3777 22nd St | rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run withDetails
rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run with | $25,000 |
| May 13, 2025 | Completed final sign-off Nov 2025 | 3782 21st St | revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrationsDetails
revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrations | $5,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 3782 21st St | kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace.Details
kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace. | $70,000 |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations)Details
remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations) | $60,000 |
| Jul 23, 2024 | Completed final sign-off Jan 2025 | 228 30th St | 1 kitchen remodel in-kind no structural changesDetails
1 kitchen remodel in-kind no structural changes | $100,000 |
| May 24, 2024 | Completed final sign-off Oct 2025 | 2212 Lake St | interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath.Details
interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath. | $30,000 |
| Mar 14, 2024 | Completed final sign-off Dec 2025 | 2212 Lake St | 1 kitchen, 3 bathrooms - replacement in kindDetails
1 kitchen, 3 bathrooms - replacement in kind | $350,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind.Details
remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind. | $100,000 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3544 Baker St | remodel of kitchen and 3 bathss, light electrical, light plumbingDetails
remodel of kitchen and 3 bathss, light electrical, light plumbing | $75,000 |
| Jan 10, 2023 | Completed final sign-off May 2024 | 625 El Camino Del Mar | basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled.Details
basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled. | $20,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2024 | 625 El Camino Del Mar | (1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work.Details
(1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work. | $100,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall.Details
rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall. | $40,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Sep 3, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition.Details
kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition. | $55,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2022 | 2737 Clay St | the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck.Details
the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck. | $65,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear.Details
rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear. | $125,000 |
| Sep 25, 2019 | Completed final sign-off Jan 2021 | 135 Avila St | installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5Details
installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5 | $20,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall.Details
horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall. | $120,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind.Details
renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind. | $250,000 |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 3800 Washington St | interior renovation to ground floor kitchen, pantry, wet bar, study room and powder roomDetails
interior renovation to ground floor kitchen, pantry, wet bar, study room and powder room | $55,000 |
| Aug 27, 2018 | Completed final sign-off Feb 2019 | 1080 Chestnut St | replace fixtures and finishes at kitchen and (1) bathroom. no structural workDetails
replace fixtures and finishes at kitchen and (1) bathroom. no structural work | $20,000 |
| Jun 12, 2018 | Completed final sign-off May 2019 | 2831 Baker St | remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and doorDetails
remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and door | $200,000 |
| May 18, 2018 | Never finaled issued Jun 2018, no final | 325 Cornwall St | replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit.Details
replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit. | $200,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2020 | 101 Terrace Dr | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roofDetails
the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | #5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher naDetails
#5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher na | $20,000 |
| Jun 26, 2017 | Completed final sign-off Nov 2017 | 2908 Pacific Av | kitchen remodel, replacing cabinets in-kindDetails
kitchen remodel, replacing cabinets in-kind | $25,000 |
| Apr 5, 2017 | Completed final sign-off Dec 2017 | 2211 Broderick St | remodel of kitchen in existing locationDetails
remodel of kitchen in existing location | $10,000 |
| Dec 23, 2016 | Completed final sign-off Sep 2017 | 601 04th St | unit #223: interior remodel of (e) entry , (e) kitchen and (e) master bedroom of 2nd floor loft. area of remodel is 365 sf tital. no new sf to be added maher naDetails
unit #223: interior remodel of (e) entry , (e) kitchen and (e) master bedroom of 2nd floor loft. area of remodel is 365 sf tital. no new sf to be added maher na | $50,000 |
| Nov 29, 2016 | Completed final sign-off Apr 2021 | 10 Normandie Tr | kitchen and 3 bath remodel.Details
kitchen and 3 bath remodel. | $10,000 |
| Oct 18, 2016 | Completed final sign-off Apr 2017 | 1571 Sacramento St | replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors.Details
replace tile, flooring, patch drywall, cabinets, counters in kitchens and baths at units 1,3 and 5 on first and second floors. | $120,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 1575 Sacramento St | reconfigure unit 8 on 3rd fl. demolition of interior kitchen walls. new plumbing fixtures, new lighting and electrical. no exterior work. no fire alarm or sprinkler work. convert living room to new bedroomDetails
reconfigure unit 8 on 3rd fl. demolition of interior kitchen walls. new plumbing fixtures, new lighting and electrical. no exterior work. no fire alarm or sprinkler work. convert living room to new bedroom | $10,000 |
| Jul 26, 2016 | Never finaled issued Aug 2016, no final | 78 Buchanan St | remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13Details
remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13 | $30,000 |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1340 Lombard St | unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher naDetails
unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher na | $40,000 |
| Jul 14, 2016 | Completed final sign-off Mar 2017 | 1320 Lombard St | remodel unit 605, 7th floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen to bedroom. add washer & dryer. maher naDetails
remodel unit 605, 7th floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen to bedroom. add washer & dryer. maher na | $40,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2017 | 1547 Clay St | 2nd floor unit #101: remodel- (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13Details
2nd floor unit #101: remodel- (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13 | $25,000 |
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 835 Pine St | remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required.Details
remodel unit 10 at 3rd fl. remodel e bath. remodel e kitchen. add washer/dryer; compliance with maher ordinance no 155-13 not required. | $25,000 |
| Jun 17, 2016 | Completed final sign-off Feb 2017 | 1760 Golden Gate Av | unit 6, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen into bedroom. add washer & dryer.Details
unit 6, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) kitchen into bedroom. add washer & dryer. | $35,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 78 Buchanan St | unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13Details
unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13 | $40,000 |
| Jun 14, 2016 | Completed final sign-off Jan 2017 | 691 Ofarrell St | 5th floor, unit # 410: remodel (e) kitchen (gas range & hood) & bathroom, add washer & dryer (ventless condensate dryer).Details
5th floor, unit # 410: remodel (e) kitchen (gas range & hood) & bathroom, add washer & dryer (ventless condensate dryer). | $25,000 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 2975 Van Ness Av | 4th flr, unit #22: remodel bathroom. relocating kitchen. add washer & dryerDetails
4th flr, unit #22: remodel bathroom. relocating kitchen. add washer & dryer | $30,000 |
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 691 Ofarrell St | 1st floor, unit # 101: remodel (e) kitchen (electric range & hood) & bathroom, add washer & gas dryer.Details
1st floor, unit # 101: remodel (e) kitchen (electric range & hood) & bathroom, add washer & gas dryer. | $25,000 |
| May 11, 2016 | Completed final sign-off Mar 2017 | 145 Mallorca Wy | demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maherDetails
demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maher | $100,000 |
| Apr 6, 2016 | Completed final sign-off Aug 2016 | 3783 20th St | unit #12 - remodel existing bathroom & existing kitchen, convert existing living room to bedroom. add washer/dryer. n/a maher ordinanceDetails
unit #12 - remodel existing bathroom & existing kitchen, convert existing living room to bedroom. add washer/dryer. n/a maher ordinance | $30,000 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 825 Pine St | unit #6: kitchen and bathrom remodel, replace flooring, appliances cabinetry and tile. all fixtures to remain and re-installed in existing locationsDetails
unit #6: kitchen and bathrom remodel, replace flooring, appliances cabinetry and tile. all fixtures to remain and re-installed in existing locations | $15,000 |
| Mar 21, 2016 | Completed final sign-off Jul 2016 | 825 Pine St | #6- remodel unit #6 at 2/f, remodel existing kitchen, add washer and dryer.Details
#6- remodel unit #6 at 2/f, remodel existing kitchen, add washer and dryer. | $20,000 |
| Jun 9, 2015 | Completed final sign-off Sep 2016 | 20 25th North Av | 1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher.Details
1st floor: new deck and stairs out to grade, new windows & drs, reconfigure closet and bathrooms, relocate bathrm from 1 1/2 floor, reconfigure interior stair. 1 1/2 floor: reconfigure bathrooms and bdrms,relocate bthrm, add 5th bdr reconfigure kitchen, nw steel beam, vault cielings. n/a for maher. | $130,000 |
| Apr 1, 2015 | Completed final sign-off Feb 2016 | 2106 Jackson St | unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'dDetails
unit #2: revision to pa 2014 0909 5887: remodel to master bath,closet & bedroom with (n) partitions. remodel to kitchen & remaining bathrooms to include (n) plumbing fixtures & elect outlets. radiators to be replaced & (n) finishes throughout. glazing to be replace in 1 lightwell. maher - not req'd | $150,000 |
| Feb 11, 2015 | Expired or cancelled expired Mar 2023 | 3630 Jackson St | refurbish and replacement of select interior finishes throughout including kitchen, master bath, 2nd and 3rd floor baths. no relocation of interior walls or structural work to be performedDetails
refurbish and replacement of select interior finishes throughout including kitchen, master bath, 2nd and 3rd floor baths. no relocation of interior walls or structural work to be performed | $40,000 |
| Sep 9, 2014 | Completed final sign-off Feb 2016 | 2106 Jackson St | (e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k.Details
(e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k. | $36,000 |
| Jul 25, 2014 | Completed final sign-off Mar 2016 | 2240 Broderick St | interior re-configuratiion of walls, demo slab @ rear, new concrete slab @ 1st flr. new posts+footings @ rear patio. lightwell infill @ 1st & 2nd flrs. enlarge of garage,struct upgrades, new bath & new exercise/ bedroom @ 1st flr.remove int. stair, kitchen remodel,new fxtures, new nfpa 13r sprinkleDetails
interior re-configuratiion of walls, demo slab @ rear, new concrete slab @ 1st flr. new posts+footings @ rear patio. lightwell infill @ 1st & 2nd flrs. enlarge of garage,struct upgrades, new bath & new exercise/ bedroom @ 1st flr.remove int. stair, kitchen remodel,new fxtures, new nfpa 13r sprinkle | $125,000 |
| Dec 5, 2013 | Completed final sign-off Dec 2014 | 69 San Anselmo Av | kitchen remodel and ceiling/roof replacement with wall strengthening. window replacement to match style on all windows and add laundry room next to existing bath on main floorDetails
kitchen remodel and ceiling/roof replacement with wall strengthening. window replacement to match style on all windows and add laundry room next to existing bath on main floor | $25,000 |
| Oct 28, 2013 | Completed final sign-off Jul 2015 | 869 Clayton St | remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units.Details
remodel extg unit, including kitchen, 2 baths and the addition of a master suite with bath at ground level, rebuild extg deck at rear yard at a smaller size, less than 3' above grade. replace rear windows witih wood units. | $90,000 |
| May 14, 2013 | Completed final sign-off Aug 2014 | 959 Ashbury St | 2 story horiz. addition at rear with roof decks at 2nd & 3rd floor. 2 story horiz. addition at south side with ext. stair to grade. enlarge (e) 4th floor dormer. interior remodel kitchen & (4) baths. (n) patio at rear yard.Details
2 story horiz. addition at rear with roof decks at 2nd & 3rd floor. 2 story horiz. addition at south side with ext. stair to grade. enlarge (e) 4th floor dormer. interior remodel kitchen & (4) baths. (n) patio at rear yard. | $400,000 |
| Sep 12, 2012 | Completed final sign-off Jan 2016 | 118 09th Av | remove 30 lf wall, (n) kitchen cab., siesmic upgrade, (n) slab on grade, 2-(n) 1/2 bathrooms, (n) lighting, (n) windows @ rear of bldg., co & smoke detectors.Details
remove 30 lf wall, (n) kitchen cab., siesmic upgrade, (n) slab on grade, 2-(n) 1/2 bathrooms, (n) lighting, (n) windows @ rear of bldg., co & smoke detectors. | $180,000 |
| Jul 5, 2012 | Completed final sign-off Apr 2016 | 1763 Stockton St | replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000Details
replace all (e) windows with wood frame in kind, reconfigure interior walls and stair, replace (e) roof joists with tji's reroof, and windows at west elevation, add private roof deck, add skylights, remodel bathrooms and kitchen, comply with complaint no 200994000 | $340,000 |
| May 25, 2012 | Never finaled issued May 2012, no final | 655 Corbett Av | alteration and remodel of extg kitchen, bathroom, living rooms, and bedroom. installation of new drywall, tile, cabinetry, & paint. demolition of wood burning fireplace to update with non operable opening.Details
alteration and remodel of extg kitchen, bathroom, living rooms, and bedroom. installation of new drywall, tile, cabinetry, & paint. demolition of wood burning fireplace to update with non operable opening. | $50,000 |
| Jul 18, 2011 | Never finaled issued Jul 2011, no final | 178 Laidley St | demolition of kitchen, installation of new electrical, plumbing. convert (e) closet into half bathroom. new cabinetry & countertops. two new windows in (e) openings, re-tile of (e) bathroom on 2nd floor. installation of 8'-0" lf new footing at garage level. not adding habitable space on garage levelDetails
demolition of kitchen, installation of new electrical, plumbing. convert (e) closet into half bathroom. new cabinetry & countertops. two new windows in (e) openings, re-tile of (e) bathroom on 2nd floor. installation of 8'-0" lf new footing at garage level. not adding habitable space on garage level | $35,000 |
| May 2, 2011 | Completed final sign-off Aug 2011 | 3747 Scott St | demo of kitchen and closet area. installation of new electrical and plbg in kitchen. installation of (n) bathroom plbg to create new full bath, new kitchen cabs, tile, counter tops.replace kchn wndw in current r.o.installs 3 doors into (e) openings on 2nd floor.Details
demo of kitchen and closet area. installation of new electrical and plbg in kitchen. installation of (n) bathroom plbg to create new full bath, new kitchen cabs, tile, counter tops.replace kchn wndw in current r.o.installs 3 doors into (e) openings on 2nd floor. | $25,000 |
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 3001 Turk St | demo of e kitchen cabinets, drywall and flooring. remove non-load bearing wall between kitcen and dining room. new cabinets, appliances, countertopsDetails
demo of e kitchen cabinets, drywall and flooring. remove non-load bearing wall between kitcen and dining room. new cabinets, appliances, countertops | $50,000 |
| Jun 25, 2010 | Completed final sign-off Dec 2010 | 3631 23rd St | remove interior wall at living room, new gas fireplace inserts, replace heating & electrical systems, reconfigure existing kitchen w/same fixtures & cabinets, repair interior wall finishes as req'dDetails
remove interior wall at living room, new gas fireplace inserts, replace heating & electrical systems, reconfigure existing kitchen w/same fixtures & cabinets, repair interior wall finishes as req'd | $35,000 |
| Jun 2, 2010 | Completed final sign-off Aug 2010 | 819 38th Av | demolition of kitchen & closet area. reframe of (e) porch floor (enclose), new load bearing walls from dining room to kitchen. installation of new kitchen cabinets, drywall & electrical; new plumbing for master bathroom & tile master bathroomDetails
demolition of kitchen & closet area. reframe of (e) porch floor (enclose), new load bearing walls from dining room to kitchen. installation of new kitchen cabinets, drywall & electrical; new plumbing for master bathroom & tile master bathroom | $55,000 |