Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 19 permits filed
180 permits since 2000: 134 completed, 12 in progress, 28 never finaled, 6 expired or cancelled.
Of the 28 never-finaled permits, 13 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 180.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 250 Dore St | minor interior remodel with guardrail upgrades and window limiters throught for windows less than 36" a.f.f. exterior guardrails added to roof parapet walls and one window.Details
minor interior remodel with guardrail upgrades and window limiters throught for windows less than 36" a.f.f. exterior guardrails added to roof parapet walls and one window. | $20,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 2829 Pacific Av | int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel.Details
int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel. | $1,804,290 |
| Aug 13, 2026 | In progress issued Aug 2026 | 3777 22nd St | revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paintDetails
revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paint | $50,000 |
| Jun 30, 2026 | In progress issued Jun 2026 | 2829 Pacific Av | remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft.Details
remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft. | $250,000 |
| Jan 21, 2026 | Completed final sign-off Feb 2026 | 357 Cumberland St | to obtain final inspection for work approved under pa# 202306200402. all work is complete.Details
to obtain final inspection for work approved under pa# 202306200402. all work is complete. | |
| Jan 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout.Details
interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout. | $100,000 |
| Oct 8, 2025 | Completed final sign-off Oct 2025 | 824 Vallejo St | reinstall 3x fire rated unit entry doors in kind. repair interior wall, patch holes on top floor.Details
reinstall 3x fire rated unit entry doors in kind. repair interior wall, patch holes on top floor. | $2,000 |
| Oct 6, 2025 | Completed final sign-off Oct 2025 | 824 Vallejo St | to obtain final inspection for work approved under pa # 2007-0912-2431. all work is complete.Details
to obtain final inspection for work approved under pa # 2007-0912-2431. all work is complete. | |
| Jul 30, 2025 | In progress issued Aug 2025 | 3777 22nd St | rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run withDetails
rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run with | $25,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 200 Cervantes Bl | remodel powder room "in-kind) no structural alterations, new tile, new plumbing and electrical fixtures. no removal wallsDetails
remodel powder room "in-kind) no structural alterations, new tile, new plumbing and electrical fixtures. no removal walls | $30,000 |
| Jun 11, 2025 | In progress issued Aug 2025 | 4024 25th St | revision to pa# 2023-1213-2404-s2 (e) rear yard retaining wallsDetails
revision to pa# 2023-1213-2404-s2 (e) rear yard retaining walls | $30,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923.Details
remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923. | |
| May 13, 2025 | Completed final sign-off Nov 2025 | 3782 21st St | revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrationsDetails
revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrations | $5,000 |
| Apr 21, 2025 | In progress issued Apr 2025 | 3777 22nd St | repair ~20 ft of dry rot on grid line 2 from a.5 to f on ground floor and 2nd floor. notice for building permit #202105070016.Details
repair ~20 ft of dry rot on grid line 2 from a.5 to f on ground floor and 2nd floor. notice for building permit #202105070016. | $3,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Mar 11, 2025 | Completed final sign-off Jan 2026 | 357 Cumberland St | (n) windscreen on roof. visable from street. revision to pa# 2020.0311.6723Details
(n) windscreen on roof. visable from street. revision to pa# 2020.0311.6723 | $15,000 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 3782 21st St | kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace.Details
kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace. | $70,000 |
| Jan 22, 2025 | Completed final sign-off Feb 2026 | 2830 Filbert St | revision to 201905140541 for rear yard retaining walls in response to inspector requestDetails
revision to 201905140541 for rear yard retaining walls in response to inspector request | |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations)Details
remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations) | $60,000 |
| Sep 4, 2024 | Completed final sign-off Nov 2025 | 2212 Lake St | revision to pa #202405242908. foundation replacement. lower 12 inches interior slab; remove (e) wall at the ground level in billards room, add new steel beam and back-to-back strong wall at same wall lineDetails
revision to pa #202405242908. foundation replacement. lower 12 inches interior slab; remove (e) wall at the ground level in billards room, add new steel beam and back-to-back strong wall at same wall line | $150,000 |
| Jul 23, 2024 | Completed final sign-off Jan 2025 | 228 30th St | 1 kitchen remodel in-kind no structural changesDetails
1 kitchen remodel in-kind no structural changes | $100,000 |
| May 24, 2024 | Completed final sign-off Oct 2025 | 2212 Lake St | interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath.Details
interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath. | $30,000 |
| Apr 4, 2024 | Completed final sign-off Nov 2024 | 3010 Pacific Av | replacement of (7) front exterior doors in kind. no change to transom.Details
replacement of (7) front exterior doors in kind. no change to transom. | $100,000 |
| Mar 19, 2024 | Completed final sign-off Feb 2026 | 2830 Filbert St | revision to 201905140541. framing at front facade to be replaced in kind to provide shear walls. e framing sub-standard. structural design unchangedDetails
revision to 201905140541. framing at front facade to be replaced in kind to provide shear walls. e framing sub-standard. structural design unchanged | $50,000 |
| Mar 14, 2024 | Completed final sign-off Dec 2025 | 2212 Lake St | 1 kitchen, 3 bathrooms - replacement in kindDetails
1 kitchen, 3 bathrooms - replacement in kind | $350,000 |
| Jan 26, 2024 | Completed final sign-off Feb 2026 | 2830 Filbert St | construction of new occupied roof deck and deck accessDetails
construction of new occupied roof deck and deck access | $45,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind.Details
remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind. | $100,000 |
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | to demolish a 2-story, 1 residential unit, r-3 building. (new construction under a separate permit)Details
to demolish a 2-story, 1 residential unit, r-3 building. (new construction under a separate permit) | $20,000 |
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | to erect a 4-story, 2 residential units, r-3, type vb building.Details
to erect a 4-story, 2 residential units, r-3, type vb building. | $1,600,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | 3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027Details
3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027 | $48,950 |
| Sep 6, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features.Details
structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features. | $80,000 |
| Jul 3, 2023 | Completed final sign-off Mar 2024 | 1900 Green St | revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub.Details
revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub. | $200,000 |
| Jun 20, 2023 | Expired or cancelled expired Jan 2026 | 357 Cumberland St | revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation.Details
revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation. | $55,735 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3544 Baker St | remodel of kitchen and 3 bathss, light electrical, light plumbingDetails
remodel of kitchen and 3 bathss, light electrical, light plumbing | $75,000 |
| Jan 10, 2023 | Completed final sign-off May 2024 | 625 El Camino Del Mar | basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled.Details
basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled. | $20,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2024 | 625 El Camino Del Mar | (1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work.Details
(1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work. | $100,000 |
| Oct 4, 2022 | Completed final sign-off Apr 2025 | 12 Rossi Av | interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairsDetails
interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairs | $500,000 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 118 09th Av | to obtain final inspection of work approved under permit application #201210292988.100% complete.Details
to obtain final inspection of work approved under permit application #201210292988.100% complete. | |
| Jun 7, 2022 | Completed final sign-off May 2023 | 3829 Clay St | redo floors, cabinetry, and baseboards for cosemetic purposes. restore back to original- water damage repair.Details
redo floors, cabinetry, and baseboards for cosemetic purposes. restore back to original- water damage repair. | $48,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2025 | 1279 Sanchez St | - new dwelling unit on first floor. - horizontal addition at rear first floor. - vertical addition to add third floor. - facade restoration & new exterior staircase to replace existing.Details
- new dwelling unit on first floor. - horizontal addition at rear first floor. - vertical addition to add third floor. - facade restoration & new exterior staircase to replace existing. | $147,225 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall.Details
rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall. | $40,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Sep 3, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition.Details
kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition. | $55,000 |
| Jul 21, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | revision to app#202008141750: consists of relocation of garage door 3'-5" back from approved location, elimination of concrete landing at front stair, expanding portion of roof deck to adj. propertylineDetails
revision to app#202008141750: consists of relocation of garage door 3'-5" back from approved location, elimination of concrete landing at front stair, expanding portion of roof deck to adj. propertyline | $10,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | replace (11) (e) windows in-kind, some in front/some in rearDetails
replace (11) (e) windows in-kind, some in front/some in rear | $20,000 |
| Jun 25, 2021 | Completed final sign-off May 2023 | 1973 Broadway | replace 4 (e) windows in-kind at east elevation, not street visible. remove additional 287.25 sq ft of siding from east elevation. wall framing remains. install (n) siding over (e) siding on east & west elevation.Details
replace 4 (e) windows in-kind at east elevation, not street visible. remove additional 287.25 sq ft of siding from east elevation. wall framing remains. install (n) siding over (e) siding on east & west elevation. | $5,000 |
| May 17, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | repair of (e) exterior stair in kind , less than 50% . no full replacement. repair only. front facing.Details
repair of (e) exterior stair in kind , less than 50% . no full replacement. repair only. front facing. | $1,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2022 | 2737 Clay St | the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck.Details
the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck. | $65,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 64 Santa Rita Av | erect (n) 3-story single family dwellingDetails
erect (n) 3-story single family dwelling | $705,500 |
| Nov 14, 2020 | Expired or cancelled expired Apr 2026 | 35 Belgrave Av | demolish 1 story type 5 construction single family dwellingDetails
demolish 1 story type 5 construction single family dwelling | $65,000 |
| Nov 14, 2020 | Expired or cancelled expired Apr 2026 | 35 Belgrave Av | erect a three story type 5 construction 1 basement single family dwellingDetails
erect a three story type 5 construction 1 basement single family dwelling | $1,700,000 |
| Oct 30, 2020 | Completed final sign-off Mar 2022 | 1330 Masonic Av | revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2.Details
revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2. | |
| Aug 14, 2020 | Completed final sign-off Aug 2022 | 50 Surrey St | revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st flDetails
revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st fl | $185,000 |
| Jul 14, 2020 | Completed final sign-off Mar 2021 | 112 Mallorca Wy | replace 6 front windows. front windows to be replaced "in-kind" windows will be marvin ultimate casement with arches to match existing, aluminum-clad, multi-lite casement windows. all windows within existing openingsDetails
replace 6 front windows. front windows to be replaced "in-kind" windows will be marvin ultimate casement with arches to match existing, aluminum-clad, multi-lite casement windows. all windows within existing openings | $75,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2026 | 357 Cumberland St | to erect 3 stories, 1 basement, type v-b, single family dwelling.Details
to erect 3 stories, 1 basement, type v-b, single family dwelling. | $1,750,000 |
| Mar 5, 2020 | Completed final sign-off Apr 2022 | 3010 Pacific Av | temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes.Details
temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes. | $50,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear.Details
rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear. | $125,000 |
| Jan 9, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | 1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stairDetails
1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stair | $200,000 |
| Nov 26, 2019 | Completed final sign-off Feb 2023 | 1973 Broadway | temporary tarp building in preparation for rain onlyDetails
temporary tarp building in preparation for rain only | $2,000 |
| Nov 5, 2019 | Completed final sign-off May 2023 | 1973 Broadway | revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792Details
revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792 | $1,000 |
| Sep 25, 2019 | Completed final sign-off Jan 2021 | 135 Avila St | installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5Details
installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5 | $20,000 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 22 Normandie Tr | revision to pa 2019-0621-4133 replace (e) retaining wall, change wood posts to steel postsDetails
revision to pa 2019-0621-4133 replace (e) retaining wall, change wood posts to steel posts | |
| Sep 13, 2019 | Completed final sign-off Apr 2021 | 10 Normandie Tr | revision to pa 2019-0621-4130 replace (e) retaining wallDetails
revision to pa 2019-0621-4130 replace (e) retaining wall | $200 |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 10 Normandie Tr | street spaceDetails
street space | |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind.Details
renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind. | $250,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall.Details
horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall. | $120,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 22 Normandie Tr | replace existing retaining wall.Details
replace existing retaining wall. | |
| Jun 21, 2019 | Completed final sign-off Apr 2021 | 10 Normandie Tr | replace existing retaining wall.Details
replace existing retaining wall. | $5,000 |
| May 14, 2019 | Completed final sign-off Feb 2026 | 2830 Filbert St | rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit.Details
rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit. | $780,600 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 3800 Washington St | street spaceDetails
street space | |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 3800 Washington St | interior renovation to ground floor kitchen, pantry, wet bar, study room and powder roomDetails
interior renovation to ground floor kitchen, pantry, wet bar, study room and powder room | $55,000 |
| Oct 1, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | revision to 201710040350 and pa # 201805219677 revised ele & hvac plan changes. n/a for maherDetails
revision to 201710040350 and pa # 201805219677 revised ele & hvac plan changes. n/a for maher | |
| Aug 27, 2018 | Completed final sign-off Feb 2019 | 1080 Chestnut St | replace fixtures and finishes at kitchen and (1) bathroom. no structural workDetails
replace fixtures and finishes at kitchen and (1) bathroom. no structural work | $20,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 150 Glenbrook Av | revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor.Details
revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor. | |
| Jun 25, 2018 | Completed final sign-off Jun 2019 | 325 Cornwall St | revisionto 201805189603 submittal of structural drawings onlyDetails
revisionto 201805189603 submittal of structural drawings only | |
| Jun 12, 2018 | Completed final sign-off May 2019 | 2831 Baker St | remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and doorDetails
remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and door | $200,000 |
| Jun 6, 2018 | Completed final sign-off May 2023 | 1973 Broadway | demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floorDetails
demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floor | $30,000 |
| May 21, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher naDetails
revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher na | |
| May 18, 2018 | Never finaled issued Jun 2018, no final | 325 Cornwall St | replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit.Details
replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit. | $200,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 145 Mallorca Wy | supplemental structural work. revision to pa 2018-0327-4759Details
supplemental structural work. revision to pa 2018-0327-4759 | $3,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 10 Normandie Tr | street spaceDetails
street space | |
| May 8, 2018 | Never finaled issued May 2018, no final | 150 Glenbrook Av | street spaceDetails
street space | |
| Mar 27, 2018 | Never finaled issued May 2018, no final | 145 Mallorca Wy | replace (e) front balconies in kind original corbels & metal railings to be removed & reused. repair surrounding stucco as needed. no construction or other work. maher naDetails
replace (e) front balconies in kind original corbels & metal railings to be removed & reused. repair surrounding stucco as needed. no construction or other work. maher na | $10,000 |
| Mar 19, 2018 | Completed final sign-off May 2023 | 1973 Broadway | revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions.Details
revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions. | $5,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | to obtain final inspection for work approved under pa # 201605117167Details
to obtain final inspection for work approved under pa # 201605117167 | |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | to obtain final inspection for work approved under pa # 201605117166Details
to obtain final inspection for work approved under pa # 201605117166 | |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | recommencement and completion of work approved under pa # 201107019377Details
recommencement and completion of work approved under pa # 201107019377 | $30,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | recommencement and completion of work approved under pa # 201503272067Details
recommencement and completion of work approved under pa # 201503272067 | $10,000 |
| Jan 8, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | revision to app#201710040350 to add moment frame to rear wall ground floor. n/a for maherDetails
revision to app#201710040350 to add moment frame to rear wall ground floor. n/a for maher | |
| Dec 14, 2017 | Completed final sign-off Aug 2018 | 240 Cervantes Bl | repair of water damage and install waterproofing for existing front entry stair. no demo of stairs. remove existing terra cotta, install waterproofing, and re-install terra cotta. repair in-kind. n/a for maher.Details
repair of water damage and install waterproofing for existing front entry stair. no demo of stairs. remove existing terra cotta, install waterproofing, and re-install terra cotta. repair in-kind. n/a for maher. | $20,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2020 | 101 Terrace Dr | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roofDetails
the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | #5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher naDetails
#5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher na | $20,000 |
| Oct 6, 2017 | Completed final sign-off Dec 2017 | 2211 Broderick St | patch/repair building common area, plaster walls in hallway, appx 4 sq ftDetails
patch/repair building common area, plaster walls in hallway, appx 4 sq ft | $250 |
| Oct 6, 2017 | Completed final sign-off Oct 2017 | 2211 Broderick St | repair/replace two existing water damaged double hung windows in light well with new awning and double hung window.Details
repair/replace two existing water damaged double hung windows in light well with new awning and double hung window. | $500 |
| Oct 4, 2017 | Completed final sign-off Sep 2019 | 431 Avila St | interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street).Details
interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street). | $170,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2019 | 138 23rd Av | residential alteration & addition including voluntary seismic upgradesDetails
residential alteration & addition including voluntary seismic upgrades | $100,000 |
| Jun 26, 2017 | Completed final sign-off Nov 2017 | 2908 Pacific Av | kitchen remodel, replacing cabinets in-kindDetails
kitchen remodel, replacing cabinets in-kind | $25,000 |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 1973 Broadway | exploritory demo permit to locate structure and services ahead of renovation, max 500 sq ft drywall removalDetails
exploritory demo permit to locate structure and services ahead of renovation, max 500 sq ft drywall removal | $1,000 |