Block 0958, lot 009
2898 Broadway
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 9,110 sq ft
- Lot
- 5,776 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | Cal Summit Builders | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | Cook Construction | remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind.Details
remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind. | $100,000 |
| May 24, 2007 | Completed final sign-off Jan 2008 | 2898 Broadway | S J L Construction*** Pls See 959755**** | 2/fl bath - remove and replace tile. remove and cap plumbing vanity #1. remove and replace vanity #2. remove tub and tile replace with shower. provide fluorescent lights or occupancy sensor in bathroom.Details
2/fl bath - remove and replace tile. remove and cap plumbing vanity #1. remove and replace vanity #2. remove tub and tile replace with shower. provide fluorescent lights or occupancy sensor in bathroom. | $23,000 |
| Aug 2, 2006 | Completed final sign-off Dec 2006 | 2898 Broadway | revision to pa# 2005/11/01/7019 due to changes to respond to field conditions, the shortening of the length of the deck & increase in perimeter is (10 x 4 x 1/4) to (ts x 4 x 1/4) to allow for overflow weep holes as detailed.Details
revision to pa# 2005/11/01/7019 due to changes to respond to field conditions, the shortening of the length of the deck & increase in perimeter is (10 x 4 x 1/4) to (ts x 4 x 1/4) to allow for overflow weep holes as detailed. | ||
| Nov 1, 2005 | Completed final sign-off Dec 2006 | 2898 Broadway | add rear deck off top floor - add doors in (e) full ht. window openings - nochange to brick facade except structural beam penetrations as noted on s.e. drawings -Details
add rear deck off top floor - add doors in (e) full ht. window openings - nochange to brick facade except structural beam penetrations as noted on s.e. drawings - | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cal Summit Builders, Cook Construction, S J L Construction*** Pls See 959755****
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.