Cal Summit Builders
- Based in
- San Rafael
- On San Francisco permits
- Apr 2011 to Jan 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 21 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | Completed final sign-off May 2026 | 2655 Steiner St | one bathroom remodel in-kind. plumbing in same location. run two electrical circuits to ac condensors.Details
one bathroom remodel in-kind. plumbing in same location. run two electrical circuits to ac condensors. | $20,000 |
| Nov 18, 2025 | Completed final sign-off May 2026 | 2655 Steiner St | same size and same location: broken single glass upgrading in kind. 8 existing street facing aluminum thermally broken tile turn windows on the 1st floor of a non-historic residence with new stc 49 sound proofing tile turn windows within existing wood casing & upgrade existing.Details
same size and same location: broken single glass upgrading in kind. 8 existing street facing aluminum thermally broken tile turn windows on the 1st floor of a non-historic residence with new stc 49 sound proofing tile turn windows within existing wood casing & upgrade existing. | $4,000 |
| Oct 14, 2025 | Completed final sign-off May 2026 | 2655 Steiner St | three bathroom remodels and in kind. one bathroom to convert tub to shower. one steam shower.Details
three bathroom remodels and in kind. one bathroom to convert tub to shower. one steam shower. | $150,000 |
| Sep 16, 2025 | Completed final sign-off May 2026 | 15 Rico Wy | unit 2-remodel kitchen no structural or wall removal. frame second entry on non structrual wall. to include electrical work for (n) plugs outlets and appliances. frame a refrigertor nook on non structural wall. sink and stove to remain on same level.Details
unit 2-remodel kitchen no structural or wall removal. frame second entry on non structrual wall. to include electrical work for (n) plugs outlets and appliances. frame a refrigertor nook on non structural wall. sink and stove to remain on same level. | $60,000 |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 22 Rico Wy | water leak around windows repair. replace front facade windows with in kind at the existing openings. repair stucco,match stucco finishes to the existing stucco.Details
water leak around windows repair. replace front facade windows with in kind at the existing openings. repair stucco,match stucco finishes to the existing stucco. | $10,000 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 67 Sunview Dr | hall bathroom remodel: replace floor and wall tiles. new rough in shower valve, new vanity and faucet, new toilet. no structural changes of wall relocation.Details
hall bathroom remodel: replace floor and wall tiles. new rough in shower valve, new vanity and faucet, new toilet. no structural changes of wall relocation. | $28,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2024 | 580 12th Av | remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home.Details
remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home. | $150,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Nov 21, 2023 | Completed final sign-off Apr 2024 | 2717 20th St | 1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider.Details
1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider. | $15,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2022 | 15 Rico Wy | bathroom remodel in-kind. replace tile, tub, water valve, sink, and new lighting.Details
bathroom remodel in-kind. replace tile, tub, water valve, sink, and new lighting. | $35,000 |
| Feb 3, 2022 | Never finaled issued Feb 2022, no final | 1515 Union St | administrative permit to correct address pa#202107305508 - ref number. change address from 2465 van ness #506 to 1515 union st #4gDetails
administrative permit to correct address pa#202107305508 - ref number. change address from 2465 van ness #506 to 1515 union st #4g | |
| Nov 19, 2021 | Expired or cancelled withdrawn Dec 2021 | 488 Gold Mine Dr | upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millworkDetails
upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millwork | $25,000 |
| Jul 30, 2021 | Completed final sign-off Feb 2022 | 2465 Van Ness Av | apt 506: remodel kitchen. add peninsula to (e) kitchen with appliances including microwave, refridgerator, wine chiller.Details
apt 506: remodel kitchen. add peninsula to (e) kitchen with appliances including microwave, refridgerator, wine chiller. | $17,500 |
| Jun 22, 2020 | Completed final sign-off Nov 2020 | 22 Rico Wy | bath remodel: bathroom is 5.5' wide x 11' long on 3rd fl no wall changes. replacing in kind. plumbing: we are replacing the shower valve, toilet sink and faucet. electrical: replacing and relocating wall sconces, and adding an outlet for a toilet.Details
bath remodel: bathroom is 5.5' wide x 11' long on 3rd fl no wall changes. replacing in kind. plumbing: we are replacing the shower valve, toilet sink and faucet. electrical: replacing and relocating wall sconces, and adding an outlet for a toilet. | $20,000 |
| Nov 19, 2019 | Completed final sign-off Dec 2020 | 373 Justin Dr | revision to pa# 2019-0625-4366: reduce scope of work, no new deck. add a bathroom. add structural footings on 2nd floor.Details
revision to pa# 2019-0625-4366: reduce scope of work, no new deck. add a bathroom. add structural footings on 2nd floor. | $25,000 |
| Apr 30, 2019 | Completed final sign-off Mar 2020 | 1330 22nd Av | revision to pa #201808076622, relocate g/f bathroom. new front windows, replace plaster front of property. alum clad wood windowsDetails
revision to pa #201808076622, relocate g/f bathroom. new front windows, replace plaster front of property. alum clad wood windows | $20,000 |
| Aug 7, 2018 | Completed final sign-off Mar 2020 | 1330 22nd Av | interior renovation alteration: reconfigure 1st floor extg garage and storage space to include garage, 1 master bedroom, 1 guest bedroom, 1.5 bath with family room. the new conditioned space will be heated with radiant floor heating which will replace extg heating on 2nd floor.Details
interior renovation alteration: reconfigure 1st floor extg garage and storage space to include garage, 1 master bedroom, 1 guest bedroom, 1.5 bath with family room. the new conditioned space will be heated with radiant floor heating which will replace extg heating on 2nd floor. | $160,000 |
| Mar 29, 2018 | Completed final sign-off Feb 2019 | 320 Alabama St | unit #3: kitchen renovation on 1st flr. maher naDetails
unit #3: kitchen renovation on 1st flr. maher na | $25,000 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 355 01st St | #809s - kitchen remodel - same floor plan but new cabinets, countertops, apliances, assoicated mep, and new flooring throughoutDetails
#809s - kitchen remodel - same floor plan but new cabinets, countertops, apliances, assoicated mep, and new flooring throughout | $45,000 |
| Aug 9, 2016 | Completed final sign-off Mar 2018 | 101 Lombard St | unit #108e: kitchen & bathroom remodel.Details
unit #108e: kitchen & bathroom remodel. | $30,000 |
| Apr 19, 2013 | Completed final sign-off Oct 2013 | 211 09th Av | bathroom remodel, replace bathtub, shower valve and tile. replace sink and vanity. replace exhaust fan. replace vanity light, re-finish hardwood floor. prime and paint.Details
bathroom remodel, replace bathtub, shower valve and tile. replace sink and vanity. replace exhaust fan. replace vanity light, re-finish hardwood floor. prime and paint. | $10,000 |
| Aug 10, 2011 | Completed final sign-off Mar 2012 | 737 Kansas St | install outdoor - gas barbaque & fire pit in rear yard. (center of rear yard) no closer than 3' to pl.Details
install outdoor - gas barbaque & fire pit in rear yard. (center of rear yard) no closer than 3' to pl. | $6,000 |
| Apr 25, 2011 | Completed final sign-off Oct 2011 | 188 Marietta Dr | fire damage repair, no plans required by insp. simasDetails
fire damage repair, no plans required by insp. simas | $40,000 |