Back to bathroom remodel contractors
Cal Summit Builders
- Based in
- San Rafael
- On San Francisco permits
- Apr 2011 to Jan 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 21 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | Completed final sign-off May 2026 | 2655 Steiner St | one bathroom remodel in-kind. plumbing in same location. run two electrical circuits to ac condensors.Details
one bathroom remodel in-kind. plumbing in same location. run two electrical circuits to ac condensors. | $20,000 |
| Oct 14, 2025 | Completed final sign-off May 2026 | 2655 Steiner St | three bathroom remodels and in kind. one bathroom to convert tub to shower. one steam shower.Details
three bathroom remodels and in kind. one bathroom to convert tub to shower. one steam shower. | $150,000 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 67 Sunview Dr | hall bathroom remodel: replace floor and wall tiles. new rough in shower valve, new vanity and faucet, new toilet. no structural changes of wall relocation.Details
hall bathroom remodel: replace floor and wall tiles. new rough in shower valve, new vanity and faucet, new toilet. no structural changes of wall relocation. | $28,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2024 | 580 12th Av | remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home.Details
remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home. | $150,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Nov 21, 2023 | Completed final sign-off Apr 2024 | 2717 20th St | 1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider.Details
1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider. | $15,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2022 | 15 Rico Wy | bathroom remodel in-kind. replace tile, tub, water valve, sink, and new lighting.Details
bathroom remodel in-kind. replace tile, tub, water valve, sink, and new lighting. | $35,000 |
| Nov 19, 2021 | Expired or cancelled withdrawn Dec 2021 | 488 Gold Mine Dr | upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millworkDetails
upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millwork | $25,000 |
| Jun 22, 2020 | Completed final sign-off Nov 2020 | 22 Rico Wy | bath remodel: bathroom is 5.5' wide x 11' long on 3rd fl no wall changes. replacing in kind. plumbing: we are replacing the shower valve, toilet sink and faucet. electrical: replacing and relocating wall sconces, and adding an outlet for a toilet.Details
bath remodel: bathroom is 5.5' wide x 11' long on 3rd fl no wall changes. replacing in kind. plumbing: we are replacing the shower valve, toilet sink and faucet. electrical: replacing and relocating wall sconces, and adding an outlet for a toilet. | $20,000 |
| Nov 19, 2019 | Completed final sign-off Dec 2020 | 373 Justin Dr | revision to pa# 2019-0625-4366: reduce scope of work, no new deck. add a bathroom. add structural footings on 2nd floor.Details
revision to pa# 2019-0625-4366: reduce scope of work, no new deck. add a bathroom. add structural footings on 2nd floor. | $25,000 |
| Apr 30, 2019 | Completed final sign-off Mar 2020 | 1330 22nd Av | revision to pa #201808076622, relocate g/f bathroom. new front windows, replace plaster front of property. alum clad wood windowsDetails
revision to pa #201808076622, relocate g/f bathroom. new front windows, replace plaster front of property. alum clad wood windows | $20,000 |
| Aug 7, 2018 | Completed final sign-off Mar 2020 | 1330 22nd Av | interior renovation alteration: reconfigure 1st floor extg garage and storage space to include garage, 1 master bedroom, 1 guest bedroom, 1.5 bath with family room. the new conditioned space will be heated with radiant floor heating which will replace extg heating on 2nd floor.Details
interior renovation alteration: reconfigure 1st floor extg garage and storage space to include garage, 1 master bedroom, 1 guest bedroom, 1.5 bath with family room. the new conditioned space will be heated with radiant floor heating which will replace extg heating on 2nd floor. | $160,000 |
| Aug 9, 2016 | Completed final sign-off Mar 2018 | 101 Lombard St | unit #108e: kitchen & bathroom remodel.Details
unit #108e: kitchen & bathroom remodel. | $30,000 |
| Apr 19, 2013 | Completed final sign-off Oct 2013 | 211 09th Av | bathroom remodel, replace bathtub, shower valve and tile. replace sink and vanity. replace exhaust fan. replace vanity light, re-finish hardwood floor. prime and paint.Details
bathroom remodel, replace bathtub, shower valve and tile. replace sink and vanity. replace exhaust fan. replace vanity light, re-finish hardwood floor. prime and paint. | $10,000 |