Block 7527, lot 023
488 Gold Mine Dr
- City’s use
- Single Family Residential
- Built
- 1968
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,080 sq ft
- Lot
- 4,159 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 488 Gold Mine Dr | Duggan Development | bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes.Details
bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes. | $35,000 |
| Nov 19, 2021 | Expired or cancelled withdrawn Dec 2021 | 488 Gold Mine Dr | Cal Summit Builders | upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millworkDetails
upgrade 1 existing bathroom. replace fixtures and add 1 more sink. replace lights and 1 window in the bathroom. add a partition wall in the existing bedroom and in the foyer to add storage cabinet millwork | $25,000 |
| Jan 22, 2014 | Never finaled issued Jan 2014, no final | 488 Gold Mine Dr | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| May 20, 2013 | Completed final sign-off Oct 2013 | 488 Gold Mine Dr | C G Adams Construction | remodel bathroom on 1st floor. remove non load bearing partitions, fixtures and finishes. new partitions, fixutres and finishes. reuse extg lighting, electrical and mechanical as is.Details
remodel bathroom on 1st floor. remove non load bearing partitions, fixtures and finishes. new partitions, fixutres and finishes. reuse extg lighting, electrical and mechanical as is. | $5,000 |
| May 13, 2013 | Completed final sign-off Oct 2013 | 488 Gold Mine Dr | C G Adams Construction | remodel kitchen and bath in kind, replace hood in kinds , kitchen ligghts to comply with 50% high efficacy. bath lighting high efficacyDetails
remodel kitchen and bath in kind, replace hood in kinds , kitchen ligghts to comply with 50% high efficacy. bath lighting high efficacy | $20,000 |
| Apr 16, 2013 | Completed final sign-off Apr 2013 | 488 Gold Mine Dr | Schmitt Heating Co Inc | install new ducting in crawlspace.Details
install new ducting in crawlspace. | $5,760 |
| Apr 12, 2013 | Completed final sign-off Oct 2013 | 488 Gold Mine Dr | C G Adams Construction | replace 5 sliding doors windows from alum. to marvin wood clad, same size, same location, not visible from the street. repair upper deck by 30ft in kind less than 50% & repair in kind remaining 30ft of deck only per deck repair in kindDetails
replace 5 sliding doors windows from alum. to marvin wood clad, same size, same location, not visible from the street. repair upper deck by 30ft in kind less than 50% & repair in kind remaining 30ft of deck only per deck repair in kind | $35,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.