Back to kitchen remodel contractors
Cal Summit Builders
- Based in
- San Rafael
- On San Francisco permits
- Apr 2011 to Jan 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 21 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 1 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2025 | Completed final sign-off May 2026 | 15 Rico Wy | unit 2-remodel kitchen no structural or wall removal. frame second entry on non structrual wall. to include electrical work for (n) plugs outlets and appliances. frame a refrigertor nook on non structural wall. sink and stove to remain on same level.Details
unit 2-remodel kitchen no structural or wall removal. frame second entry on non structrual wall. to include electrical work for (n) plugs outlets and appliances. frame a refrigertor nook on non structural wall. sink and stove to remain on same level. | $60,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2024 | 580 12th Av | remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home.Details
remodel (2) bathrooms located at upper level by converting (e) office into bathroom and convert tub into toilet room. remodel of kitchen on lower level to include new island and expanding kitchen by removing partition wall. replacing (e) windows/doors in the same opening throughout home. | $150,000 |
| Nov 21, 2023 | Completed final sign-off Apr 2024 | 2717 20th St | 1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider.Details
1st fl e bath remodel. replace fixtures and finishes throughout, locat ion stay as is. make shower curbless. replace clerestory winndow w energy saving operable window. width in kind,height adjusted. 2nd fl wall opening. make e opening between kitchen and dining rm wider. | $15,000 |
| Jul 30, 2021 | Completed final sign-off Feb 2022 | 2465 Van Ness Av | apt 506: remodel kitchen. add peninsula to (e) kitchen with appliances including microwave, refridgerator, wine chiller.Details
apt 506: remodel kitchen. add peninsula to (e) kitchen with appliances including microwave, refridgerator, wine chiller. | $17,500 |
| Mar 29, 2018 | Completed final sign-off Feb 2019 | 320 Alabama St | unit #3: kitchen renovation on 1st flr. maher naDetails
unit #3: kitchen renovation on 1st flr. maher na | $25,000 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 355 01st St | #809s - kitchen remodel - same floor plan but new cabinets, countertops, apliances, assoicated mep, and new flooring throughoutDetails
#809s - kitchen remodel - same floor plan but new cabinets, countertops, apliances, assoicated mep, and new flooring throughout | $45,000 |
| Aug 9, 2016 | Completed final sign-off Mar 2018 | 101 Lombard St | unit #108e: kitchen & bathroom remodel.Details
unit #108e: kitchen & bathroom remodel. | $30,000 |