Block 0499, lot 002D
1360 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 6
- Units
- 77
- Rooms
- 75 bedrooms, 79 bathrooms
- Building
- 64,980 sq ft
- Lot
- 27,363 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
119 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2023 | Never finaled filed May 2023, never issued | 1360 Lombard St | add (8) adu's at existing ground floor storage and basement.Details
add (8) adu's at existing ground floor storage and basement. | $500,000 | |
| May 15, 2023 | Never finaled filed May 2023, never issued | 1360 Lombard St | add (12) adu's at existing ground floor parking per ord# 162-16.(aka 1380 lombard st)Details
add (12) adu's at existing ground floor parking per ord# 162-16.(aka 1380 lombard st) | $500,000 | |
| Oct 13, 2022 | Completed final sign-off Oct 2023 | 1340 Lombard St | Axa Construction | unit 105: convert e dining to study, relocate kitchen, rehab e bath, install 2nd bath. install washer and dryerDetails
unit 105: convert e dining to study, relocate kitchen, rehab e bath, install 2nd bath. install washer and dryer | $45,000 |
| Jul 19, 2022 | Expired or cancelled cancelled Jan 2026 | 1340 Lombard St | #302: install 1 new clothes washer/dryer. no wall demoDetails
#302: install 1 new clothes washer/dryer. no wall demo | $4,000 | |
| Jul 19, 2022 | Completed final sign-off Feb 2023 | 1360 Lombard St | Axa Construction | #303: convert (e) kitchen & dining to bedroom. relocate kitchen, rehab (e) bath. install washer/dryer.Details
#303: convert (e) kitchen & dining to bedroom. relocate kitchen, rehab (e) bath. install washer/dryer. | $32,000 |
| Dec 22, 2021 | Completed final sign-off May 2022 | 1360 Lombard St | Axa Construction | unit #601: convert(e)kitchen to bedroom, relocate kitchen, rehabilitate(e)bathroom,install washer & dryer.Details
unit #601: convert(e)kitchen to bedroom, relocate kitchen, rehabilitate(e)bathroom,install washer & dryer. | $30,000 |
| Dec 15, 2021 | Completed final sign-off May 2022 | 1360 Lombard St | Axa Construction | unit 402: convert (e) kitchen to bedroom, relocate kitchen, install washer & dryerDetails
unit 402: convert (e) kitchen to bedroom, relocate kitchen, install washer & dryer | $40,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 1340 Lombard St | Axa Construction | unit #505: convert existing dining to study. install washer/dryer,relocate kitchen, rehab(e) bathroom,install new 2nd bath.Details
unit #505: convert existing dining to study. install washer/dryer,relocate kitchen, rehab(e) bathroom,install new 2nd bath. | $45,000 |
| Nov 1, 2021 | Never finaled filed Nov 2021, never issued | 1340 Lombard St | add 4 adu's per ordinance 162-16 at existing ground floor storage level.Details
add 4 adu's per ordinance 162-16 at existing ground floor storage level. | $200,000 | |
| Jul 12, 2021 | Completed final sign-off Dec 2021 | 1360 Lombard St | Axa Construction | unit 506: convert (e) kitchen and dining to study, relocate kitchen, rehabilitate existing bathroom and install washer and dryer. install new bathroomDetails
unit 506: convert (e) kitchen and dining to study, relocate kitchen, rehabilitate existing bathroom and install washer and dryer. install new bathroom | $45,000 |
| Jun 29, 2021 | Completed final sign-off Dec 2021 | 1340 Lombard St | Axa Construction | unit 502 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom; install washer and dryerDetails
unit 502 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom; install washer and dryer | $40,000 |
| May 18, 2020 | Completed final sign-off Feb 2021 | 1340 Lombard St | Axa Construction | unit 503. convert (e) kitchen to (n) bedroom, relocate kitchen, rehabilitate (e) bathrooms, install washer dryerDetails
unit 503. convert (e) kitchen to (n) bedroom, relocate kitchen, rehabilitate (e) bathrooms, install washer dryer | $40,000 |
| Mar 6, 2020 | Expired or cancelled cancelled Jan 2026 | 1360 Lombard St | convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) batroom n/a maherDetails
convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) batroom n/a maher | $36,000 | |
| Mar 6, 2020 | Expired or cancelled cancelled Jan 2026 | 1340 Lombard St | unit #401; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer n/a maherDetails
unit #401; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer n/a maher | $40,000 | |
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 1340 Lombard St | Axa Construction | unit 304 - converting (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom and install washer & dryerDetails
unit 304 - converting (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom and install washer & dryer | $40,000 |
| Mar 2, 2020 | Completed final sign-off Apr 2021 | 1340 Lombard St | Axa Construction | unit 306 - converting (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install 2nd bathroom and install washer & dryerDetails
unit 306 - converting (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install 2nd bathroom and install washer & dryer | $45,000 |
| Jan 22, 2020 | Completed final sign-off Mar 2020 | 1360 Lombard St | B-Side Inc. | unit 504. upgrade electrical panel, change faucet in bathroom sinkDetails
unit 504. upgrade electrical panel, change faucet in bathroom sink | $5,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 1360 Lombard St | street spaceDetails
street space | ||
| Oct 11, 2019 | Completed final sign-off Feb 2020 | 1360 Lombard St | Axel8 Construction | #501: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer.Details
#501: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $38,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2019 | 1340 Lombard St | Axel8 Construction | unit #2 rehab kitchen (e) 72 sqft, rehab bathroom (e) 49 sq ft, inst washer and dryer 20 sq ft (ventless dryer)Details
unit #2 rehab kitchen (e) 72 sqft, rehab bathroom (e) 49 sq ft, inst washer and dryer 20 sq ft (ventless dryer) | $23,000 |
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 1340 Lombard St | Axel8 Construction | unit 204 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
unit 204 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $40,000 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Jun 19, 2018 | Completed final sign-off Jan 2019 | 1360 Lombard St | Holland Brooks Builders Inc | unit #503:rehabilitate existing kitchen & bath, install washier & dryerDetails
unit #503:rehabilitate existing kitchen & bath, install washier & dryer | $40,000 |
| May 25, 2018 | Completed final sign-off Jan 2019 | 1360 Lombard St | Holland Brooks Builders Inc | unit #101: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. n/a for maherDetails
unit #101: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. n/a for maher | $39,000 |
| May 16, 2018 | Completed final sign-off Aug 2024 | 1360 Lombard St | Au Electric Corporation/Aec Alarms | install new fire alarm system that meets nfpa 72, cbc 907.2.9. complying with 1103.7.6.1Details
install new fire alarm system that meets nfpa 72, cbc 907.2.9. complying with 1103.7.6.1 | $50,000 |
| May 3, 2018 | Completed final sign-off Oct 2018 | 1340 Lombard St | Holland Brooks Builders Inc | unit #104 rehabilitate (e) kitchen & bathroom. install w/dDetails
unit #104 rehabilitate (e) kitchen & bathroom. install w/d | $29,000 |
| Apr 30, 2018 | Never finaled issued Apr 2018, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Apr 13, 2018 | Completed final sign-off Sep 2018 | 1340 Lombard St | Holland Brooks Builders Inc | unit 606 on 7th floor: convert existing kitchen to (n) bedroom. relocate kitchen. rehabilitate existing bath, fire under separate permit(s).Details
unit 606 on 7th floor: convert existing kitchen to (n) bedroom. relocate kitchen. rehabilitate existing bath, fire under separate permit(s). | $42,000 |
| Feb 6, 2018 | Never finaled issued Feb 2018, no final | 1340 Lombard St | Ping Kuen Construction | unit 102: rehabilitate existing kitchen and bath. install washer and dryerDetails
unit 102: rehabilitate existing kitchen and bath. install washer and dryer | $25,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 1340 Lombard St | Palmera Construction Co | apt 301: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer maher not reqDetails
apt 301: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer maher not req | $39,000 |
| Nov 17, 2017 | Never finaled issued Dec 2017, no final | 1340 Lombard St | Palmera Construction Co | unit # 402: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit # 402: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $31,000 |
| Nov 13, 2017 | Completed final sign-off Mar 2018 | 1360 Lombard St | Wickman Development And Construction | comply with nov 201701641. nov repair spalding concrete at exterior of garage structure behind 1360 lombard maher not reqDetails
comply with nov 201701641. nov repair spalding concrete at exterior of garage structure behind 1360 lombard maher not req | $20,000 |
| Oct 25, 2017 | Completed final sign-off Mar 2018 | 1340 Lombard St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm with low frequency sounders. n/a ordinance #155-13Details
upgrade existing fire alarm with low frequency sounders. n/a ordinance #155-13 | $50,000 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Aug 15, 2017 | Never finaled issued Sep 2017, no final | 1360 Lombard St | Palmera Construction Co | unit #603: rehabilitate (e) kitchen & bathroom, install washer & dryer. maher naDetails
unit #603: rehabilitate (e) kitchen & bathroom, install washer & dryer. maher na | $38,000 |
| Jun 20, 2017 | Completed final sign-off Nov 2017 | 1360 Lombard St | Palmera Construction Co | unit 104 - rehabilitate existing kitchen, rehabilitate existing bathroom. install washer & dryer. n/a maherDetails
unit 104 - rehabilitate existing kitchen, rehabilitate existing bathroom. install washer & dryer. n/a maher | $26,000 |
| Jun 6, 2017 | Completed final sign-off Oct 2017 | 1360 Lombard St | Palmera Construction Co | unit 202 - rehabilitate existing kitchen, rehabilitate bathroom and install washer/dryer. n/a maherDetails
unit 202 - rehabilitate existing kitchen, rehabilitate bathroom and install washer/dryer. n/a maher | $30,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 1340 Lombard St | Palmera Construction Co | #506 -rehabilitate existing kitche, bath, install washer and dryerDetails
#506 -rehabilitate existing kitche, bath, install washer and dryer | $26,000 |
| Jun 2, 2017 | Completed final sign-off Oct 2017 | 1360 Lombard St | Palmera Construction Co | unit #102: 1)rehabilitate exgt kitchen. 2) rehabilitate ext bathroom. 3)install washer and dryer.Details
unit #102: 1)rehabilitate exgt kitchen. 2) rehabilitate ext bathroom. 3)install washer and dryer. | $30,000 |
| Feb 23, 2017 | Never finaled issued Mar 2017, no final | 1360 Lombard St | B-Side Inc. | unit 505, 6th floor - rehabilitate existing kitchen & bathroom, install washer & dryer. maher naDetails
unit 505, 6th floor - rehabilitate existing kitchen & bathroom, install washer & dryer. maher na | $26,000 |
| Feb 13, 2017 | Never finaled issued Feb 2017, no final | 1360 Lombard St | B-Side Inc. | #106- remodel bathroom, keeping existing layout, new countertop with (e) cabinets to remain, existing tub to remain. no structural work.Details
#106- remodel bathroom, keeping existing layout, new countertop with (e) cabinets to remain, existing tub to remain. no structural work. | $20,000 |
| Feb 6, 2017 | Never finaled issued Feb 2017, no final | 1360 Lombard St | Markoff Structural Pest Control | termite report # 17201, item #1; all work at detached garage in rear. no affecting egress; n/a maherDetails
termite report # 17201, item #1; all work at detached garage in rear. no affecting egress; n/a maher | $20,000 |
| Jan 18, 2017 | Completed final sign-off Mar 2018 | 1340 Lombard St | Ping Kuen Construction | 5th fl #406- remodel unit# 406, add washer & dryer, convert (e) kitchen to bedroom, relocate kitchen to living room, remodel (e) bathroom. n/a ordinance #155-13Details
5th fl #406- remodel unit# 406, add washer & dryer, convert (e) kitchen to bedroom, relocate kitchen to living room, remodel (e) bathroom. n/a ordinance #155-13 | $38,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Aug 26, 2016 | Expired or cancelled cancelled Jan 2026 | 1340 Lombard St | unit 201 - revision to pa 2016-0714-2347 revise floor plan layout - minor mesaurement modifications to kitchen and closetDetails
unit 201 - revision to pa 2016-0714-2347 revise floor plan layout - minor mesaurement modifications to kitchen and closet | ||
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1340 Lombard St | Cook Construction | unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher naDetails
unit 201 , 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer & dryer. maher na | $40,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 1340 Lombard St | B-Side Inc. | apt 505: bathroom renovation, canbiet replace., new fixtures, (e) tub.Details
apt 505: bathroom renovation, canbiet replace., new fixtures, (e) tub. | $10,000 |
| Jun 2, 2016 | Never finaled issued Jun 2016, no final | 1360 Lombard St | B-Side Inc. | unit 404: kitchen cabinet and counter top replacement. bathroom tile replacement. replace gfi counter outlets by code. new fixtures, existing tub.Details
unit 404: kitchen cabinet and counter top replacement. bathroom tile replacement. replace gfi counter outlets by code. new fixtures, existing tub. | $30,000 |
| Dec 10, 2015 | Completed final sign-off Mar 2016 | 1340 Lombard St | Sure, Inc. | unit #202 remodel at 2nd floor: remodel exisitng bathroom & kitchen. add bedroom & washer/dryer. n/a maher ordinanceDetails
unit #202 remodel at 2nd floor: remodel exisitng bathroom & kitchen. add bedroom & washer/dryer. n/a maher ordinance | $30,000 |
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Aug 11, 2015 | Never finaled issued Aug 2015, no final | 1340 Lombard St | street space permitDetails
street space permit | ||
| Jul 16, 2015 | Completed final sign-off Feb 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #501, 5th floor - relocate existing kitchen & additoin of dishwasher, remodel exisitng bathroom, add washer & dryer, convert (e) kitchen/dining to den. n/a maher ordinanceDetails
unit #501, 5th floor - relocate existing kitchen & additoin of dishwasher, remodel exisitng bathroom, add washer & dryer, convert (e) kitchen/dining to den. n/a maher ordinance | $30,000 |
| Jul 16, 2015 | Completed final sign-off Jan 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #305, 3rd floor - remodel existing kitchen & addition of dishwasher, add washer & dryer. n/a maher ordinanceDetails
unit #305, 3rd floor - remodel existing kitchen & addition of dishwasher, add washer & dryer. n/a maher ordinance | $20,000 |
| Jul 16, 2015 | Completed final sign-off Jan 2016 | 1340 Lombard St | Sandbank Construction, Inc | unit #206, 2nd floor - remodel existing bathroom, addition of one new bathroom, relocate existing kitchen & addition of dishwasher, add washer/dryer, convert (e) kitchen/dining to den. n/a maher ordinanceDetails
unit #206, 2nd floor - remodel existing bathroom, addition of one new bathroom, relocate existing kitchen & addition of dishwasher, add washer/dryer, convert (e) kitchen/dining to den. n/a maher ordinance | $50,000 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 1340 Lombard St | Sandbank Construction, Inc | #403 at 4th floor- remodel (e) bathroom, remodel (e) kitchen & addition of dishwasher. add washer and dryer.Details
#403 at 4th floor- remodel (e) bathroom, remodel (e) kitchen & addition of dishwasher. add washer and dryer. | $25,000 |
| Jun 9, 2015 | Completed final sign-off Oct 2015 | 1360 Lombard St | Sandbank Construction, Inc | unit #201: interior alterations to kitchen and bathroom, add washer/dryer; maherDetails
unit #201: interior alterations to kitchen and bathroom, add washer/dryer; maher | $30,000 |
| Jun 9, 2015 | Completed final sign-off Oct 2015 | 1360 Lombard St | Sandbank Construction, Inc | unit #204: interior alterations to kitchen and bathroom, add washer/dryer; maher n/aDetails
unit #204: interior alterations to kitchen and bathroom, add washer/dryer; maher n/a | $30,000 |
| May 29, 2015 | Completed final sign-off Jun 2015 | 1360 Lombard St | Malagic Construction | frame and install new interior door in lobby by stairs. no structural work.Details
frame and install new interior door in lobby by stairs. no structural work. | $1,500 |
| May 8, 2015 | Never finaled issued May 2015, no final | 1340 Lombard St | street spaceDetails
street space | ||
| Apr 23, 2015 | Completed final sign-off Jan 2016 | 1340 Lombard St | Sandbank Construction, Inc | #1- interior alteration including remodel of kitchen and bath, add washer dryer. maher not reqDetails
#1- interior alteration including remodel of kitchen and bath, add washer dryer. maher not req | $30,000 |
| Apr 23, 2015 | Completed final sign-off Oct 2015 | 1360 Lombard St | Sandbank Construction, Inc | interior alterations that include remodeling kitchen and bath. add washer dryerDetails
interior alterations that include remodeling kitchen and bath. add washer dryer | $30,000 |
| Apr 8, 2015 | Completed final sign-off Oct 2015 | 1340 Lombard St | Sandbank Construction, Inc | unit 504: remodel of kit & bath add w/d. maher - not req'dDetails
unit 504: remodel of kit & bath add w/d. maher - not req'd | $30,000 |
| Apr 2, 2015 | Completed final sign-off Aug 2015 | 1360 Lombard St | Sandbank Construction, Inc | unit #205 - kitche remodel new w/dDetails
unit #205 - kitche remodel new w/d | $30,000 |
| Mar 26, 2015 | Completed final sign-off Aug 2015 | 1360 Lombard St | Sandbank Construction, Inc | unit #203: remodel of kitchen and bathroom and add washer and dryer. compliance with maher ordinance no 155-13 not required.Details
unit #203: remodel of kitchen and bathroom and add washer and dryer. compliance with maher ordinance no 155-13 not required. | $30,000 |
| Mar 16, 2015 | Completed final sign-off Nov 2015 | 1340 Lombard St | Donny Chu Construction Inc Dba D C Cons, Sandbank Construction, Inc | unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maherDetails
unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maher | $30,000 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 1360 Lombard St | street spaceDetails
street space | ||
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 1340 Lombard St | Ico Inc | all works done in #106: remove/add interior non-bearing walls, relocate kitchen to (e) living rm. convert dining rm to (n) bedroom, remodel (e) bath, add (n) bath, new washer/dryer, new lighting plan for modified spaces.Details
all works done in #106: remove/add interior non-bearing walls, relocate kitchen to (e) living rm. convert dining rm to (n) bedroom, remodel (e) bath, add (n) bath, new washer/dryer, new lighting plan for modified spaces. | $40,000 |
| Sep 6, 2013 | Completed final sign-off Jan 2014 | 1360 Lombard St | Ico Inc | unit# 304:revision to app#201307192305. all work done in unit#304. remove/ add interior walls. minimize closet size. remodel extg bathroom and kitchen. new lighting plan for modified spaces. no longer adding the bedroom. no longer relocating kitchen.Details
unit# 304:revision to app#201307192305. all work done in unit#304. remove/ add interior walls. minimize closet size. remodel extg bathroom and kitchen. new lighting plan for modified spaces. no longer adding the bedroom. no longer relocating kitchen. | |
| Jul 19, 2013 | Completed final sign-off Jan 2014 | 1360 Lombard St | Ico Inc | -all work in unit #304 - remove/add interior walls - remodel bathroom - move kitchen to (e) bath - convert (e) kitchen/dining to (n) bedroom - new washer/dryer - new lighting plan for modified spacesDetails
-all work in unit #304 - remove/add interior walls - remodel bathroom - move kitchen to (e) bath - convert (e) kitchen/dining to (n) bedroom - new washer/dryer - new lighting plan for modified spaces | $30,000 |
| Apr 10, 2013 | Completed final sign-off Apr 2013 | 1340 Lombard St | Eagle Ridge Construction And Roofing | unit #101: revision to 201212045441, kitchen change location. bathroom move toiletDetails
unit #101: revision to 201212045441, kitchen change location. bathroom move toilet | |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 1340 Lombard St | Eagle Ridge Construction And Roofing | kitchen remodel & bath remodel. electrical upgarde. add new laundry roomDetails
kitchen remodel & bath remodel. electrical upgarde. add new laundry room | $35,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 1360 Lombard St | Eagle Ridge Construction And Roofing | #605- kitchen & bath remodel. electrical upgarde. add new laundry room, new den.Details
#605- kitchen & bath remodel. electrical upgarde. add new laundry room, new den. | $35,000 |
| Sep 20, 2012 | Never finaled issued Sep 2012, no final | 1340 Lombard St | street space permit.Details
street space permit. | ||
| Jun 28, 2012 | Completed final sign-off Oct 2012 | 1340 Lombard St | Eagle Ridge Construction And Roofing | interior alteration to reconfigure bath, kitchen and dining rooms. replace fistures and finishes at bathroom, kitchen, install washer/dryDetails
interior alteration to reconfigure bath, kitchen and dining rooms. replace fistures and finishes at bathroom, kitchen, install washer/dry | $30,000 |
| Jun 28, 2012 | Completed final sign-off Oct 2012 | 1360 Lombard St | Eagle Ridge Construction And Roofing | interior alteration to reconfigure bath, kitchen and dining room. replace fixtures and finishes at bathroom and kitchen, install washer/dryerDetails
interior alteration to reconfigure bath, kitchen and dining room. replace fixtures and finishes at bathroom and kitchen, install washer/dryer | $30,000 |
| Feb 8, 2012 | Completed final sign-off Jul 2012 | 1360 Lombard St | Eagle Ridge Construction And Roofing | remodel kitchen, new cabinets, countertops, sink. remodel bath tile, toilet, sink. remove closet wall between living room and kitchen. upgrade electric and plumbingDetails
remodel kitchen, new cabinets, countertops, sink. remodel bath tile, toilet, sink. remove closet wall between living room and kitchen. upgrade electric and plumbing | $20,000 |
| Feb 8, 2012 | Completed final sign-off Jul 2012 | 1340 Lombard St | Eagle Ridge Construction And Roofing | unit 605: remodel kitchen, new cabinets, countertops, sink. remodel bath, tile, toilet, and sink. remove closet between living room and kitchen. upgrade elec and plumbingDetails
unit 605: remodel kitchen, new cabinets, countertops, sink. remodel bath, tile, toilet, and sink. remove closet between living room and kitchen. upgrade elec and plumbing | $20,000 |
| Sep 14, 2011 | Completed final sign-off Dec 2011 | 1360 Lombard St | C Green Consulting Dba Anchway Property | unit #402-revision to pa# 2011-0628-9114-remove (e) non bearing walls & add laundry, closet & outletsDetails
unit #402-revision to pa# 2011-0628-9114-remove (e) non bearing walls & add laundry, closet & outlets | |
| Aug 5, 2011 | Completed final sign-off Oct 2011 | 1340 Lombard St | Arcon Construction Corp | unit 303 add additional bathroom and layout revision to pa#2011/0706/9552.Details
unit 303 add additional bathroom and layout revision to pa#2011/0706/9552. | $9,000 |
| Aug 5, 2011 | Completed final sign-off Oct 2011 | 1360 Lombard St | Arcon Construction Corp | unit 302 add additional bathroom and layout revision to pa#2011/0706/9553.Details
unit 302 add additional bathroom and layout revision to pa#2011/0706/9553. | $5,000 |
| Aug 5, 2011 | Completed final sign-off Oct 2011 | 1340 Lombard St | Arcon Construction Corp | unit 205 add additional bathroom and layout revision to pa#2011/0706/9555.Details
unit 205 add additional bathroom and layout revision to pa#2011/0706/9555. | $5,000 |
| Jul 6, 2011 | Completed final sign-off Oct 2011 | 1340 Lombard St | Arcon Construction Corp | unit #205: kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom.Details
unit #205: kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom. | $8,000 |
| Jul 6, 2011 | Completed final sign-off Oct 2011 | 1340 Lombard St | Arcon Construction Corp | unit 303 kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom.Details
unit 303 kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom. | $18,000 |
| Jul 6, 2011 | Completed final sign-off Oct 2011 | 1360 Lombard St | Arcon Construction Corp | unit 302 kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom.Details
unit 302 kitchen and bath renovation. replacement of cabinets, faucets, appliances. building a new non bearing separation wall to organize the bedroom. | $8,000 |
| Jun 28, 2011 | Completed final sign-off Dec 2011 | 1360 Lombard St | C Green Consulting Dba Anchway Property | #402- kitchen and bathroom remodel: work includes new toilet, tub, sink and floor tiles in bathroom; new cabinets, countertop, tiles and appliances in kitchen. wall repairs and no wall relocation. no lighting work.Details
#402- kitchen and bathroom remodel: work includes new toilet, tub, sink and floor tiles in bathroom; new cabinets, countertop, tiles and appliances in kitchen. wall repairs and no wall relocation. no lighting work. | $22,000 |
| Apr 21, 2010 | Completed final sign-off May 2010 | 1340 Lombard St | Schoepp Construction Inc | unit # 403: kitchen remodel: new countertop, replace kitchen cabinets (8ft. cab. only) plumb sink, p. trap elect. (1) gfi in kitchen.Details
unit # 403: kitchen remodel: new countertop, replace kitchen cabinets (8ft. cab. only) plumb sink, p. trap elect. (1) gfi in kitchen. | $3,500 |
| Oct 21, 2008 | Completed final sign-off Dec 2008 | 1360 Lombard St | Sassoon Construction | work @ unit# 603 only. change countertop and sink in the kitchen. tile kitchen floors.Details
work @ unit# 603 only. change countertop and sink in the kitchen. tile kitchen floors. | $3,500 |
| Jun 9, 2008 | Completed final sign-off Aug 2008 | 1340 Lombard St | Mashal Builders & Contractors Inc | work on apt#306. kitchen remodling (install n. kitchen cabinets, new countertop, and sink), bathroom remodling (new tile around bathtub, new pedestall, new toilet), paint walls & ceilings. no structural work.Details
work on apt#306. kitchen remodling (install n. kitchen cabinets, new countertop, and sink), bathroom remodling (new tile around bathtub, new pedestall, new toilet), paint walls & ceilings. no structural work. | $16,000 |
| May 29, 2008 | Expired or cancelled expired Oct 2011 | 1340 Lombard St | Frankie English Dba Doe Mabuhay Builders | work @ apt# 505 only. kitchen remodel. no structural work. no lighting work. replace cabinet, counter, floor & wall tiles.Details
work @ apt# 505 only. kitchen remodel. no structural work. no lighting work. replace cabinet, counter, floor & wall tiles. | $10,000 |
| Oct 10, 2007 | Completed final sign-off Jan 2008 | 1340 Lombard St | Mashal Builders & Contractors Inc | unit#602.kitchen remodeling (install new cabinets & counter top) . bathroom installment tile ground bathtub in closure. install new shower valve.Details
unit#602.kitchen remodeling (install new cabinets & counter top) . bathroom installment tile ground bathtub in closure. install new shower valve. | $13,000 |
| Apr 2, 2007 | Expired or cancelled expired Oct 2011 | 1340 Lombard St | California Constrution Co | reroofing.Details
reroofing. | $29,500 |
| Jul 12, 2005 | Never finaled issued Jul 2005, no final | 1360 Lombard St | street spaceDetails
street space | ||
| Jan 12, 2004 | Completed final sign-off Apr 2004 | 1340 Lombard St | On-Site Maintenance | #1- install/add kitchen cabinets/bar, install new tile floorDetails
#1- install/add kitchen cabinets/bar, install new tile floor | $2,500 |
| May 29, 2003 | Completed final sign-off Feb 2004 | 1360 Lombard St | #601 remove tile & replace w/drywall, install new cabinets on one side. remove & replace fl w/vinylDetails
#601 remove tile & replace w/drywall, install new cabinets on one side. remove & replace fl w/vinyl | $12,900 | |
| Jan 21, 2003 | Completed final sign-off Mar 2003 | 1360 Lombard St | Kearney & Obanion Inc. | renew#200112125127, &200201237589 for final inspectionDetails
renew#200112125127, &200201237589 for final inspection | |
| Jan 21, 2003 | Completed final sign-off Mar 2003 | 1360 Lombard St | Kearney & Obanion Inc. | renew#200203151601 & 200112044477 for final inspectionDetails
renew#200203151601 & 200112044477 for final inspection | |
| Jan 21, 2003 | Completed final sign-off Feb 2003 | 1360 Lombard St | Kearney & Obanion Inc. | renew#200010102485,200104257718, 200101237591 for final inspectionDetails
renew#200010102485,200104257718, 200101237591 for final inspection | |
| Sep 18, 2002 | Completed final sign-off Mar 2003 | 1360 Lombard St | #302 remove old cabinets & vinyl flr tiles.to be replaced w/ millspride cabinets & vinyl sheet.#502Details
#302 remove old cabinets & vinyl flr tiles.to be replaced w/ millspride cabinets & vinyl sheet.#502 | $6,000 | |
| Sep 17, 2002 | Completed final sign-off Dec 2002 | 1340 Lombard St | Kearney & Obanion Inc. | excavation toallow for foundation drain installationDetails
excavation toallow for foundation drain installation | $12,500 |
| Jul 30, 2002 | Completed final sign-off Mar 2003 | 1360 Lombard St | Potter Fire Protection | install (36) new fire sprinklers and associated piping in a previously sprinklered grnd flrDetails
install (36) new fire sprinklers and associated piping in a previously sprinklered grnd flr | $8,000 |
| Apr 19, 2002 | Expired or cancelled expired Feb 2003 | 1360 Lombard St | on unit 103 & 205 remove tile&replace w/ drywall, install cabinets, kitchen floor w/ vinyl sheet.Details
on unit 103 & 205 remove tile&replace w/ drywall, install cabinets, kitchen floor w/ vinyl sheet. | $6,000 | |
| Mar 15, 2002 | Completed final sign-off Feb 2003 | 1360 Lombard St | Kearney & Obanion Inc. | demolition and reconstruction in kind demo all interior walls/slab gr lvl , rebuild in kind fndtn reDetails
demolition and reconstruction in kind demo all interior walls/slab gr lvl , rebuild in kind fndtn re | $75,000 |
| Mar 15, 2002 | Expired or cancelled expired Jul 2002 | 1360 Lombard St | Kearney & Obanion Inc. | revision to shoring plan application 200112044477Details
revision to shoring plan application 200112044477 | $750 |
| Jan 23, 2002 | Expired or cancelled expired Feb 2003 | 1360 Lombard St | Kearney & Obanion Inc. | renew appn 200010102485 for final inspectionDetails
renew appn 200010102485 for final inspection | $35,110 |
| Jan 23, 2002 | Expired or cancelled expired Feb 2003 | 1360 Lombard St | Kearney & Obanion Inc. | structural rev to permitted plans appn. 200112044477Details
structural rev to permitted plans appn. 200112044477 | $75,000 |
| Jan 17, 2002 | Completed final sign-off May 2002 | 1360 Lombard St | Potter Fire Protection | install (16) temporary fire sprinklers at blocked stair landings during seismic retrofit-all floors-Details
install (16) temporary fire sprinklers at blocked stair landings during seismic retrofit-all floors- | $1,550 |
| Dec 12, 2001 | Completed final sign-off May 2002 | 1360 Lombard St | Kearney & Obanion Inc. | structural revision to permitted plans application 200104257718Details
structural revision to permitted plans application 200104257718 | |
| Dec 4, 2001 | Completed final sign-off May 2002 | 1360 Lombard St | Kearney & Obanion Inc. | stuctural shoring to allow for pemitted on s1/s2- 200104257718 dated 6-09-2000 by l/m consultingDetails
stuctural shoring to allow for pemitted on s1/s2- 200104257718 dated 6-09-2000 by l/m consulting | $19,800 |
| Sep 20, 2001 | Expired or cancelled expired Jan 2002 | 1360 Lombard St | street spaceDetails
street space | ||
| May 4, 2001 | Completed final sign-off Jul 2001 | 1340 Lombard St | replace tile w/ drywall,install cabinets on one side,remove & replace kitchen floor w/armstrong vinyDetails
replace tile w/ drywall,install cabinets on one side,remove & replace kitchen floor w/armstrong viny | $3,000 | |
| Apr 25, 2001 | Completed final sign-off May 2002 | 1360 Lombard St | Kearney & Obanion Inc. | rev. to appl#200010102485 for foundationDetails
rev. to appl#200010102485 for foundation | $38,000 |
| Apr 17, 2001 | Expired or cancelled expired Dec 2001 | 1340 Lombard St | Northern California Fire Protection | fire sprinklers to be added into storage room in basementDetails
fire sprinklers to be added into storage room in basement | $2,600 |
| Oct 10, 2000 | Expired or cancelled expired May 2002 | 1360 Lombard St | Kearney & Obanion Inc. | foundation repair per plans s1 & s2 dated 6-9-2000 by l & m consulting engineers lic #c48427Details
foundation repair per plans s1 & s2 dated 6-9-2000 by l & m consulting engineers lic #c48427 | $40,110 |
| Aug 31, 2000 | Expired or cancelled expired Dec 2001 | 1340 Lombard St | replace old cabinets @ #002, replace tile w/drywall,install cabients ,kit fl w/ armstrong tile @#204Details
replace old cabinets @ #002, replace tile w/drywall,install cabients ,kit fl w/ armstrong tile @#204 | $5,000 | |
| Aug 31, 2000 | Expired or cancelled expired Dec 2001 | 1360 Lombard St | rmove &replace w/drywall,install cabinets @404,replace cabinets @504, replace w/drywall,kit fl @505Details
rmove &replace w/drywall,install cabinets @404,replace cabinets @504, replace w/drywall,kit fl @505 | $7,500 | |
| May 26, 2000 | Completed final sign-off Sep 2000 | 1360 Lombard St | install new dishwasher & disposal at #102, #506, #605, #305, #404Details
install new dishwasher & disposal at #102, #506, #605, #305, #404 | $2,500 | |
| May 24, 2000 | Expired or cancelled expired Jul 2001 | 1360 Lombard St | kitchen remodeling in unit 506 and 102Details
kitchen remodeling in unit 506 and 102 | $7,000 | |
| Apr 28, 2000 | Expired or cancelled expired Dec 2001 | 1360 Lombard St | Kearney & Obanion Inc. | remove plaster & concrete slab for storage roomDetails
remove plaster & concrete slab for storage room | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.