Donny Chu Construction Inc Dba D C Cons
- Based in
- Oakland
- On San Francisco permits
- Aug 2007 to Sep 2023
- Last 24 months
- 0 permits filed
54 permits since 2000: 46 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2023 | Completed final sign-off Jan 2024 | 417 27th St | pa# 2021-1230-5232: deferred submittals for spiral stair case and glass guardrailDetails
pa# 2021-1230-5232: deferred submittals for spiral stair case and glass guardrail | $40,000 |
| Aug 29, 2023 | Completed final sign-off Feb 2024 | 35 Iris Av | top floor of the buildng -interior renovation of (e) primary bathroom. conversion of closet into new powder room. no exterior modification.Details
top floor of the buildng -interior renovation of (e) primary bathroom. conversion of closet into new powder room. no exterior modification. | $75,000 |
| Apr 18, 2023 | Expired or cancelled cancelled Jan 2026 | 417 27th St | revision to pa# 202112305232, new foundation details per field conditions.Details
revision to pa# 202112305232, new foundation details per field conditions. | |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 417 27th St | structural revision to permit 202112305232. new foundation detail per field conditions; add detail 3/s403 to not undermine (e) structure's foundationDetails
structural revision to permit 202112305232. new foundation detail per field conditions; add detail 3/s403 to not undermine (e) structure's foundation | |
| Dec 30, 2021 | Completed final sign-off Jan 2024 | 417 27th St | demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl.Details
demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl. | $35,000 |
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 840 Mount Vernon Av | bathroom remodel: demo (e) fixtures and finishes framing and install (1) dppr. new tcb toilet and vanity sink, new light fixtures (led) and exhaust fan no wall chabgesDetails
bathroom remodel: demo (e) fixtures and finishes framing and install (1) dppr. new tcb toilet and vanity sink, new light fixtures (led) and exhaust fan no wall chabges | $20,000 |
| Jun 26, 2019 | Completed final sign-off Jul 2022 | 285 Paris St | exterior deck and stair from 2nd level to grade, replace window with exterior sliding door.Details
exterior deck and stair from 2nd level to grade, replace window with exterior sliding door. | $37,500 |
| Dec 10, 2015 | Completed final sign-off Apr 2016 | 50 Laguna St | unit #209: remodel at the 3rd floor. add bedroom. remodel and relocate extg kitchen. remodel extg bathroom. add washer and dryer. n/a for maher.Details
unit #209: remodel at the 3rd floor. add bedroom. remodel and relocate extg kitchen. remodel extg bathroom. add washer and dryer. n/a for maher. | $25,000 |
| Dec 10, 2015 | Completed final sign-off Jun 2016 | 50 Laguna St | unit #306: remodel at the 4th floor. add bedroom. remodel and relocate extg kitchen. remodel extg bathrmoom. add washer and dryer. n/a for maher.Details
unit #306: remodel at the 4th floor. add bedroom. remodel and relocate extg kitchen. remodel extg bathrmoom. add washer and dryer. n/a for maher. | $40,000 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #2. remodel 1 bathroom. revision to pa#2015-0402-2652Details
unit #2. remodel 1 bathroom. revision to pa#2015-0402-2652 | $12,677 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #1. remodel 1 bathroom. replace tub to a shower. revision to pa#2015-0310-0410.Details
unit #1. remodel 1 bathroom. replace tub to a shower. revision to pa#2015-0310-0410. | $12,677 |
| Dec 8, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #10. remodel 1 bathroom. revision to pa#2015-0402-2651.Details
unit #10. remodel 1 bathroom. revision to pa#2015-0402-2651. | $12,677 |
| Dec 8, 2015 | Never finaled issued Dec 2015, no final | 210 Church St | unit #9. remodel 1 bathroom. replace tub to a shower. revision to pa#2015-0423-4446.Details
unit #9. remodel 1 bathroom. replace tub to a shower. revision to pa#2015-0423-4446. | $12,677 |
| Oct 22, 2015 | Completed final sign-off Mar 2016 | 50 Laguna St | unit 105: 2/fl, remodel existing bath, relocate and remodel existing kitchen, add washer and dryerDetails
unit 105: 2/fl, remodel existing bath, relocate and remodel existing kitchen, add washer and dryer | $32,000 |
| Jul 27, 2015 | Completed final sign-off Dec 2015 | 50 Laguna St | 1)remodel unit #604 at the 6th floor. 2)remodel extg bathroom. 3) remodel and relocate kitchen. 4)add washer and dryer. n/a for maherDetails
1)remodel unit #604 at the 6th floor. 2)remodel extg bathroom. 3) remodel and relocate kitchen. 4)add washer and dryer. n/a for maher | $50,000 |
| Jul 27, 2015 | Completed final sign-off Dec 2015 | 50 Laguna St | 1)remodel unit #204 at the 2nd floor. 2)remodel extg barhroom, 3)relocate and remodel extg kitchen. 4)add washer and dryer. n/a for maher.Details
1)remodel unit #204 at the 2nd floor. 2)remodel extg barhroom, 3)relocate and remodel extg kitchen. 4)add washer and dryer. n/a for maher. | $50,000 |
| Jul 10, 2015 | Completed final sign-off Dec 2015 | 50 Laguna St | remodel #302 at 4/f- remodel existing bathroom, relocate & remodel existing kitchen, add washer and dryer. n/a ordinance #155-13Details
remodel #302 at 4/f- remodel existing bathroom, relocate & remodel existing kitchen, add washer and dryer. n/a ordinance #155-13 | $35,000 |
| Jul 10, 2015 | Completed final sign-off Dec 2015 | 50 Laguna St | remodel #309 at 4/f- remodel existing bathroom, relocate & remodel existing kitchen, add washer and dryer. n/a ordinance #155-13Details
remodel #309 at 4/f- remodel existing bathroom, relocate & remodel existing kitchen, add washer and dryer. n/a ordinance #155-13 | $35,000 |
| May 20, 2015 | Completed final sign-off May 2016 | 34 Highland Av | interior remodel of unit #34 on 3rd flr. kitchen and bathroom remodel. add a bathroom.Details
interior remodel of unit #34 on 3rd flr. kitchen and bathroom remodel. add a bathroom. | $25,000 |
| May 14, 2015 | Completed final sign-off Sep 2015 | 240 Cumberland St | unit #310 revision to pa 2015 0306 0185: add 1 window at rearDetails
unit #310 revision to pa 2015 0306 0185: add 1 window at rear | $10,000 |
| Apr 23, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #408 - relocate kitchen. remodel kitchen & bathroom. add (n) w/d maher - not req'dDetails
unit #408 - relocate kitchen. remodel kitchen & bathroom. add (n) w/d maher - not req'd | $15,000 |
| Apr 23, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #9:remodeling a kitchen and adding a washer and dryer.Details
unit #9:remodeling a kitchen and adding a washer and dryer. | $30,000 |
| Apr 23, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #206 - relocate kitchen. remodel kitchen & bathroom. add (n) w/d maher - not req'dDetails
unit #206 - relocate kitchen. remodel kitchen & bathroom. add (n) w/d maher - not req'd | $16,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | remodel unit #102 only - relocate kitchen. remodel kitchen & bathroom. add (n) w/d. all work is non structural only. maher - not req'dDetails
remodel unit #102 only - relocate kitchen. remodel kitchen & bathroom. add (n) w/d. all work is non structural only. maher - not req'd | $15,000 |
| Apr 2, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #10 - kitchen remodel new w/d. all work to be done in unit 10 only.Details
unit #10 - kitchen remodel new w/d. all work to be done in unit 10 only. | $25,000 |
| Apr 2, 2015 | Completed final sign-off Feb 2016 | 210 Church St | unit #2 - kitchen remodel new w/d. all work to be done in unit 2 only.Details
unit #2 - kitchen remodel new w/d. all work to be done in unit 2 only. | $25,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #207: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d, relocating bath & kitchen fixtures maher - not req'dDetails
unit #207: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d, relocating bath & kitchen fixtures maher - not req'd | $13,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 50 Laguna St | unit # 303 relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d. convert existing kitchen/dining room to den. den not for sleeping purposes, maher - not req'dDetails
unit # 303 relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d. convert existing kitchen/dining room to den. den not for sleeping purposes, maher - not req'd | $15,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #201: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d,add den at existing closet space, den not to be used for sleeping purposes. maher - not req'dDetails
unit #201: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d,add den at existing closet space, den not to be used for sleeping purposes. maher - not req'd | $13,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #501 relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d, add bedroom within existing space maher - not req'd.Details
unit #501 relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d, add bedroom within existing space maher - not req'd. | $15,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2015 | 50 Laguna St | unit #407: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d maher - not req'dDetails
unit #407: relocate kitchen & cabinets, remodel kitchen & bathroom, add w/d maher - not req'd | $13,000 |
| Mar 16, 2015 | Completed final sign-off Aug 2015 | 1320 Lombard St | unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maher.Details
unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maher. | $30,000 |
| Mar 16, 2015 | Completed final sign-off Nov 2015 | 1340 Lombard St | unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maherDetails
unit #604: remodel kitchen and bathroom and add washer and dryer. n/a for maher | $30,000 |
| Mar 10, 2015 | Completed final sign-off Feb 2016 | 210 Church St | #1 (2nd floor) - remodel kitchen & add washer dryerDetails
#1 (2nd floor) - remodel kitchen & add washer dryer | $30,000 |
| Mar 6, 2015 | Completed final sign-off Sep 2015 | 240 Cumberland St | remodel unit 310 - add home office area with closet, new washer & dryer in closet, remodel kitchen.Details
remodel unit 310 - add home office area with closet, new washer & dryer in closet, remodel kitchen. | $10,000 |
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 28 Highland Av | add 2 bathrooms total, remodel 2 kitchens, add 4 closets; remodel 2 bedrooms. all work for two identical units. #28 and 32 on middle level of buildingDetails
add 2 bathrooms total, remodel 2 kitchens, add 4 closets; remodel 2 bedrooms. all work for two identical units. #28 and 32 on middle level of building | $172,000 |
| Oct 29, 2014 | Completed final sign-off Apr 2015 | 925 Geary St | unit #202: remodel unit, add new den & relocating kitchen in kind, add new wash and dryer, remodel kitchen in kind. n/a for the maher ordinanceDetails
unit #202: remodel unit, add new den & relocating kitchen in kind, add new wash and dryer, remodel kitchen in kind. n/a for the maher ordinance | $10,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2015 | 4334 19th St | skylight repair/replacement existing plastic skylight ,not visible from street, remodel bathroom.Details
skylight repair/replacement existing plastic skylight ,not visible from street, remodel bathroom. | $25,000 |
| Oct 22, 2014 | Completed final sign-off Jan 2015 | 4334 19th St | reroofingDetails
reroofing | $10,000 |
| Jul 1, 2014 | Completed final sign-off Jul 2014 | 1300 Haight St | remodel of existing kitchen at same location. no wall removal or modification. no structural work.Details
remodel of existing kitchen at same location. no wall removal or modification. no structural work. | $10,000 |
| Mar 28, 2014 | Completed final sign-off Jul 2014 | 1300 Haight St | all work done in unit 1302. add washer/dryer in unit. remodel bath and add new lights in bathroom.Details
all work done in unit 1302. add washer/dryer in unit. remodel bath and add new lights in bathroom. | $10,000 |
| Mar 27, 2014 | Completed final sign-off Aug 2014 | 1750 Golden Gate Av | #2- rev. to pa#201403059971 to remove laundry room and bedroom closet, new laundry outlet at hallway closet, new bedroom closet.Details
#2- rev. to pa#201403059971 to remove laundry room and bedroom closet, new laundry outlet at hallway closet, new bedroom closet. | |
| Mar 5, 2014 | Never finaled issued Mar 2014, no final | 1750 Golden Gate Av | #2- add new bedroom and closet. new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath.Details
#2- add new bedroom and closet. new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath. | $30,000 |
| Mar 5, 2014 | Completed final sign-off Aug 2014 | 1750 Golden Gate Av | #9- add new bedroom and closet. new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath.Details
#9- add new bedroom and closet. new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath. | $30,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 1760 Golden Gate Av | unit 12 remodel - add new bedroom and closet, new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath. plbg & elec under separate permit.Details
unit 12 remodel - add new bedroom and closet, new laundry outlet. relocate kitchen fixtures and cabinets. remodel bath. plbg & elec under separate permit. | $30,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 955 Clayton St | replacement of existing kitchen cabinetry and appliance with new extension of single domestic cold water line. installation of new energy efficient led ceiling light fixtures, replacement of existing flooring finish, no structural workDetails
replacement of existing kitchen cabinetry and appliance with new extension of single domestic cold water line. installation of new energy efficient led ceiling light fixtures, replacement of existing flooring finish, no structural work | $40,000 |
| Feb 27, 2013 | Completed final sign-off Jul 2013 | 4334 19th St | kitchen remodel, no change to walls. re-surface front steps & porch.Details
kitchen remodel, no change to walls. re-surface front steps & porch. | $30,000 |
| Aug 17, 2011 | Completed final sign-off Oct 2012 | 2296 Vallejo St | revision to appl #200804079049: elimination of lower level elevator lobby, no new excavation required, eliminate remodel of ground floor unit. retain existing exterior finishes - roofing, guardrails, siding @ bays.Details
revision to appl #200804079049: elimination of lower level elevator lobby, no new excavation required, eliminate remodel of ground floor unit. retain existing exterior finishes - roofing, guardrails, siding @ bays. | |
| Feb 28, 2011 | Completed final sign-off Jun 2011 | 2296 Vallejo St | remove (e) in rear & side of the bldg. not visible from the street to investigate the structural framing. area 100 sq ft. max. return to (e) condition after investigation/inspection.Details
remove (e) in rear & side of the bldg. not visible from the street to investigate the structural framing. area 100 sq ft. max. return to (e) condition after investigation/inspection. | $2,000 |
| Feb 10, 2009 | Expired or cancelled expired Aug 2012 | 5285 Diamond Heights Bl | modification of elevator shaft & rated wall assembly @ 1st, 2nd & 3rd floor & garage. installation of smoke door assembly. elevator upgrade under separate permit.Details
modification of elevator shaft & rated wall assembly @ 1st, 2nd & 3rd floor & garage. installation of smoke door assembly. elevator upgrade under separate permit. | $16,000 |
| Feb 10, 2009 | Expired or cancelled expired Aug 2012 | 5235 Diamond Heights Bl | modification of elevator shaft & rated wall assembly @ 1st, 2nd & 3rd floor & garage (basement). installation of smoke door assembly. elevator upgrade under separate permit.Details
modification of elevator shaft & rated wall assembly @ 1st, 2nd & 3rd floor & garage (basement). installation of smoke door assembly. elevator upgrade under separate permit. | $16,000 |
| Sep 23, 2008 | Expired or cancelled expired Feb 2010 | 501 Laguna Honda Bl | barrier removal: remodel basement interior to provide handicap-accessible bathrooms, move location of office. no changes to exterior or egress.Details
barrier removal: remodel basement interior to provide handicap-accessible bathrooms, move location of office. no changes to exterior or egress. | $60,000 |
| Apr 7, 2008 | Completed final sign-off Oct 2012 | 2296 Vallejo St | exterior and interior alternations; basement: create staircase, lobby & elevator. 1st level: add new bedroom, 4th level: half bath, domers, relocate stairs. rear horiz. addition & side addition.Details
exterior and interior alternations; basement: create staircase, lobby & elevator. 1st level: add new bedroom, 4th level: half bath, domers, relocate stairs. rear horiz. addition & side addition. | $180,000 |
| Aug 9, 2007 | Completed final sign-off Jun 2008 | 97 Parker Av | interior remodeling: remodel kitchen and master bathroom at the second story, remodel lower story and create family room and modify stairs connecting the two stories.Details
interior remodeling: remodel kitchen and master bathroom at the second story, remodel lower story and create family room and modify stairs connecting the two stories. | $175,000 |