Donny Chu Construction Inc Dba D C Cons
- Based in
- Oakland
- On San Francisco permits
- Aug 2007 to Sep 2023
- Last 24 months
- 0 permits filed
54 permits since 2000: 46 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 216 days from filing to permit and 313 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2023 | Completed final sign-off Jan 2024 | 417 27th St | pa# 2021-1230-5232: deferred submittals for spiral stair case and glass guardrailDetails
pa# 2021-1230-5232: deferred submittals for spiral stair case and glass guardrail | $40,000 |
| Dec 30, 2021 | Completed final sign-off Jan 2024 | 417 27th St | demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl.Details
demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl. | $35,000 |
| Jun 26, 2019 | Completed final sign-off Jul 2022 | 285 Paris St | exterior deck and stair from 2nd level to grade, replace window with exterior sliding door.Details
exterior deck and stair from 2nd level to grade, replace window with exterior sliding door. | $37,500 |
| Apr 7, 2008 | Completed final sign-off Oct 2012 | 2296 Vallejo St | exterior and interior alternations; basement: create staircase, lobby & elevator. 1st level: add new bedroom, 4th level: half bath, domers, relocate stairs. rear horiz. addition & side addition.Details
exterior and interior alternations; basement: create staircase, lobby & elevator. 1st level: add new bedroom, 4th level: half bath, domers, relocate stairs. rear horiz. addition & side addition. | $180,000 |
| Aug 9, 2007 | Completed final sign-off Jun 2008 | 97 Parker Av | interior remodeling: remodel kitchen and master bathroom at the second story, remodel lower story and create family room and modify stairs connecting the two stories.Details
interior remodeling: remodel kitchen and master bathroom at the second story, remodel lower story and create family room and modify stairs connecting the two stories. | $175,000 |