Block 6688, lot 025
30 Highland Ave
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 2
- Units
- 4
- Rooms
- 8 bathrooms
- Building
- 4,028 sq ft
- Lot
- 4,200 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2016 | Completed final sign-off Jun 2016 | 30 Highland Av | Fan L Construction | #30 - remodel utility closet, relocate kitchen, remodel existing bathroom, add bathroom & washer & dryer.Details
#30 - remodel utility closet, relocate kitchen, remodel existing bathroom, add bathroom & washer & dryer. | $40,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 28 Highland Av | Markoff Structural Pest Control | to comply with nov#201565841: repair fungus and beetle damage at rear porch and stairs less than 50% per termite report 16719 date 1/14/2015.Details
to comply with nov#201565841: repair fungus and beetle damage at rear porch and stairs less than 50% per termite report 16719 date 1/14/2015. | $5,500 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 34 Highland Av | street spaceDetails
street space | ||
| May 20, 2015 | Completed final sign-off May 2016 | 34 Highland Av | Donny Chu Construction Inc Dba D C Cons | interior remodel of unit #34 on 3rd flr. kitchen and bathroom remodel. add a bathroom.Details
interior remodel of unit #34 on 3rd flr. kitchen and bathroom remodel. add a bathroom. | $25,000 |
| Dec 10, 2014 | Never finaled issued Dec 2014, no final | 28 Highland Av | street space permitDetails
street space permit | ||
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 28 Highland Av | Donny Chu Construction Inc Dba D C Cons | add 2 bathrooms total, remodel 2 kitchens, add 4 closets; remodel 2 bedrooms. all work for two identical units. #28 and 32 on middle level of buildingDetails
add 2 bathrooms total, remodel 2 kitchens, add 4 closets; remodel 2 bedrooms. all work for two identical units. #28 and 32 on middle level of building | $172,000 |
| Dec 14, 2004 | Completed final sign-off Feb 2005 | 28 Highland Av | Sun Roofing & Constr. Company, Inc. | reroofingDetails
reroofing | $8,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Donny Chu Construction Inc Dba D C Cons (2), Fan L Construction, Markoff Structural Pest Control, Sun Roofing & Constr. Company, Inc.
- Engineers
- Fareed A Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.