Fan L Construction
- Based in
- Oakland
- On San Francisco permits
- Dec 2015 to Sep 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2017 | Completed final sign-off Oct 2017 | 1915 Hyde St | #3 - remodel kitchen & bath. replace cabinet, sink, countertop. replace bathroom sink, cabinet, faucet. no wall removed.Details
#3 - remodel kitchen & bath. replace cabinet, sink, countertop. replace bathroom sink, cabinet, faucet. no wall removed. | $20,000 |
| Sep 16, 2016 | Completed final sign-off Jan 2017 | 849 Peralta Av | remodel kitchenDetails
remodel kitchen | $18,000 |
| May 20, 2016 | Completed final sign-off Oct 2016 | 601 Ofarrell St | 2nd floor, unit 206: remodel (e) bathroom, kitchen, convert (e) dining room to den. add washer & dryerDetails
2nd floor, unit 206: remodel (e) bathroom, kitchen, convert (e) dining room to den. add washer & dryer | $30,000 |
| May 2, 2016 | Completed final sign-off Oct 2016 | 325 09th Av | unit 4 @ 2nd floor, relocate existing bathroom, relocate existing kicthen and convert existing kitchen to bedroom. add washer and dryer.Details
unit 4 @ 2nd floor, relocate existing bathroom, relocate existing kicthen and convert existing kitchen to bedroom. add washer and dryer. | $35,000 |
| Apr 22, 2016 | Completed final sign-off Oct 2016 | 601 Ofarrell St | unit #702 at 7th floor: remodel extg bathroom, relocate kitchen, convert extg dinging room and kitchen into bedroom. add washer and dryer. n/a for maherDetails
unit #702 at 7th floor: remodel extg bathroom, relocate kitchen, convert extg dinging room and kitchen into bedroom. add washer and dryer. n/a for maher | $30,000 |
| Apr 6, 2016 | Completed final sign-off Jul 2016 | 3715 California St | unit #5 on 3rd floor - remodel existing bathroom, relocate existing kitchen w/living room to (e) bedroom area. convert existing kitchen to den. add washer/dryer. n/a maher ordinanceDetails
unit #5 on 3rd floor - remodel existing bathroom, relocate existing kitchen w/living room to (e) bedroom area. convert existing kitchen to den. add washer/dryer. n/a maher ordinance | $25,000 |
| Feb 24, 2016 | Completed final sign-off Jun 2016 | 30 Highland Av | #30 - remodel utility closet, relocate kitchen, remodel existing bathroom, add bathroom & washer & dryer.Details
#30 - remodel utility closet, relocate kitchen, remodel existing bathroom, add bathroom & washer & dryer. | $40,000 |
| Feb 3, 2016 | Completed final sign-off Sep 2016 | 1290 20th Av | 7th floor, unit 606: remodel (e) kitchen, bathroom, convert (e) dining room to bedroom. add washer/dryerDetails
7th floor, unit 606: remodel (e) kitchen, bathroom, convert (e) dining room to bedroom. add washer/dryer | $35,000 |
| Dec 28, 2015 | Completed final sign-off May 2016 | 691 Ofarrell St | unit #309: remodel at 4th floor. remodel extg bathroom, remodel extg kitchen, and add washer and dryer.Details
unit #309: remodel at 4th floor. remodel extg bathroom, remodel extg kitchen, and add washer and dryer. | $25,000 |
| Dec 11, 2015 | Completed final sign-off Apr 2016 | 1230 Jackson St | unit 2, 2nd floor - add washer/dryer, remodel (e) bathroom, remodel (e) kitchenDetails
unit 2, 2nd floor - add washer/dryer, remodel (e) bathroom, remodel (e) kitchen | $40,000 |