Block 2888A, lot 001
20 Woodside Ave
- City’s use
- Commercial Misc
- Built
- 1951
- Stories
- 1
- Rooms
- 1 bathroom
- Lot
- 12,066 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2025 | In progress filed Apr 2025, not yet issued | 20 Woodside Av | Teutonic Construction Inc | install 6 (n) electrical recpetacles in daycare office area and change out 2 sinks in kind and drywall and ceiling tilesDetails
install 6 (n) electrical recpetacles in daycare office area and change out 2 sinks in kind and drywall and ceiling tiles | $1,000 |
| Nov 7, 2024 | Completed final sign-off Jul 2025 | 501 Laguna Honda Bl | Mastec Network Solutions Inc | remove 3 (e) antennas from steeple replace w/ 3 (n) antennas. remove 3 (e) cabinets and replace w/ 2 (n) cabinets.Details
remove 3 (e) antennas from steeple replace w/ 3 (n) antennas. remove 3 (e) cabinets and replace w/ 2 (n) cabinets. | $25,000 |
| Nov 4, 2024 | In progress issued Oct 2025 | 501 Laguna Honda Bl | Tristrux Llc Dba Tristrux Construction, Wicomm Inc | verizon: swap 2 (e) antennas w/ 2 (n) antennas; swap 6 (e) rrvs w/ 6 (n) rrvs; no proposed (n) batteries; (n) electrical groundingDetails
verizon: swap 2 (e) antennas w/ 2 (n) antennas; swap 6 (e) rrvs w/ 6 (n) rrvs; no proposed (n) batteries; (n) electrical grounding | $25,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2025 | 20 Woodside Av | Teutonic Construction Inc | to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structuralDetails
to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structural | $43,228 |
| Feb 28, 2024 | In progress filed Feb 2024, not yet issued | 501 Laguna Honda Bl | dish: install (3)(n) antennas within (n) frp screen on roof; install (6)(n) rrvs; install (1)(n) cabinet; no proposed batteries; install (n) 200a breaker & (n) power cabinet.Details
dish: install (3)(n) antennas within (n) frp screen on roof; install (6)(n) rrvs; install (1)(n) cabinet; no proposed batteries; install (n) 200a breaker & (n) power cabinet. | $115,000 | |
| May 10, 2021 | Completed final sign-off May 2024 | 501 Laguna Honda Bl | Ravig Inc Dba Salient Global Technologi | this proposal involves modifying an existing verizon wireless, rooftop facility located inside a cupola on a church. the intent is to swap six existing panel antennas for six new panel antennas. remove/repl rru's, surge protector, non-rf windows, mounts.Details
this proposal involves modifying an existing verizon wireless, rooftop facility located inside a cupola on a church. the intent is to swap six existing panel antennas for six new panel antennas. remove/repl rru's, surge protector, non-rf windows, mounts. | $104,000 |
| Jun 26, 2020 | Never finaled issued Aug 2020, no final | 20 Woodside Av | minor alteration of (e) child care facility, demo of (e) partitons, addition of new parttions, interior doors, and replacing one window with doorDetails
minor alteration of (e) child care facility, demo of (e) partitons, addition of new parttions, interior doors, and replacing one window with door | $5,000 | |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 501 Laguna Honda Bl | 2 banners at this sizeDetails
2 banners at this size | $4,000 | |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 501 Laguna Honda Bl | 3 banners at this size.Details
3 banners at this size. | $4,000 | |
| Jun 21, 2013 | Completed final sign-off Apr 2014 | 501 Laguna Honda Bl | L.D. Strobel Co Ltd | from newest version of antenna sheet remove (6) existing version wireless antennas install (3) new vw antennas (3) new vw aws rrvs (2) new vw raycap surge protectors (1) new vw hybrid cable existing vw coax cable to be reused new homerun ret cableDetails
from newest version of antenna sheet remove (6) existing version wireless antennas install (3) new vw antennas (3) new vw aws rrvs (2) new vw raycap surge protectors (1) new vw hybrid cable existing vw coax cable to be reused new homerun ret cable | $40,000 |
| Jun 27, 2011 | Completed final sign-off Jul 2011 | 20 Woodside Av | Goffo Construction Inc | reconfigure and add 1 water closet, 1 changing table, door into existing toilet room, patch and rpair all surfaces as requiredDetails
reconfigure and add 1 water closet, 1 changing table, door into existing toilet room, patch and rpair all surfaces as required | $30,000 |
| Sep 14, 2010 | Never finaled issued Mar 2011, no final | 501 Laguna Honda Bl | Norcal Communications & Construction Inc | installation of tower-mounted amplifiers @ an (e) legal t-mobile facility.Details
installation of tower-mounted amplifiers @ an (e) legal t-mobile facility. | $9,000 |
| Oct 28, 2009 | Completed final sign-off Mar 2010 | 501 Laguna Honda Bl | Metropolitan Electrical Construction | minor modification to e t mobile telecommunications facility consisting of replacing 2 bts cabinets and 2 omni antennas and adding 1 tma to equipment area.Details
minor modification to e t mobile telecommunications facility consisting of replacing 2 bts cabinets and 2 omni antennas and adding 1 tma to equipment area. | $11,000 |
| Sep 30, 2009 | Expired or cancelled cancelled Jan 2026 | 501 Laguna Honda Bl | remove an (e) equipment cabinet (ericsson model 2308) and replace with new cabinet (ericsson 2109) with similar dimensions. add 1 new ericsson tma. all interior work on church 3rd floor. t-mobile is the lessee doing the workDetails
remove an (e) equipment cabinet (ericsson model 2308) and replace with new cabinet (ericsson 2109) with similar dimensions. add 1 new ericsson tma. all interior work on church 3rd floor. t-mobile is the lessee doing the work | $2,000 | |
| Jun 4, 2009 | Completed final sign-off May 2011 | 501 Laguna Honda Bl | L.D. Strobel Co Ltd | add 3 new antennas to inside of church cupolaDetails
add 3 new antennas to inside of church cupola | $2,250 |
| Nov 7, 2008 | Never finaled issued Nov 2008, no final | 501 Laguna Honda Bl | street space permit only.Details
street space permit only. | ||
| Sep 23, 2008 | Expired or cancelled expired Feb 2010 | 501 Laguna Honda Bl | Donny Chu Construction Inc Dba D C Cons | barrier removal: remodel basement interior to provide handicap-accessible bathrooms, move location of office. no changes to exterior or egress.Details
barrier removal: remodel basement interior to provide handicap-accessible bathrooms, move location of office. no changes to exterior or egress. | $60,000 |
| Jul 6, 2007 | Completed final sign-off Sep 2007 | 501 Laguna Honda Bl | L.D. Strobel Co Ltd | revision to app #200702154257. replace proposed 4x8 joists with built up 2x8 bolted with 1/2 in rod at 16 in on centre.Details
revision to app #200702154257. replace proposed 4x8 joists with built up 2x8 bolted with 1/2 in rod at 16 in on centre. | |
| Jul 2, 2007 | Completed final sign-off Sep 2007 | 501 Laguna Honda Bl | L.D. Strobel Co Ltd | modify extg cels site move some electrical services, add lite and switchDetails
modify extg cels site move some electrical services, add lite and switch | $250 |
| Feb 15, 2007 | Completed final sign-off Sep 2007 | 501 Laguna Honda Bl | modification to (e) wireless communications facility within (e) church building: install new battery cabinet in enlarged closet (and reinforce floor) and replace (e) power cabinet with new power cabinet, also relocate two (e0 cabinets (slightly)Details
modification to (e) wireless communications facility within (e) church building: install new battery cabinet in enlarged closet (and reinforce floor) and replace (e) power cabinet with new power cabinet, also relocate two (e0 cabinets (slightly) | $30,000 | |
| Jun 22, 2006 | Never finaled issued Jun 2006, no final | 20 Woodside Av | street space permit only.Details
street space permit only. | ||
| Feb 13, 2006 | Completed final sign-off Jul 2006 | 501 Laguna Honda Bl | Green Drake Engineering, Inc. | accessory use wireless telecommunications facility , 2 omni antennas and 2 equipment cabinets. no batteries.Details
accessory use wireless telecommunications facility , 2 omni antennas and 2 equipment cabinets. no batteries. | $25,000 |
| Jan 30, 2006 | Expired or cancelled expired Dec 2007 | 20 Woodside Av | L.D. Strobel Co Ltd | renew appl#200502024659 for final inspectionDetails
renew appl#200502024659 for final inspection | |
| Feb 2, 2005 | Expired or cancelled expired Dec 2007 | 20 Woodside Av | L.D. Strobel Co Ltd | replace all antennas, 3- totalDetails
replace all antennas, 3- total | $2,500 |
| Nov 30, 2004 | Expired or cancelled expired Jan 2006 | 20 Woodside Av | James A Mc Grath Dba: Teutonic | demo non structural drywall partitions,install new non structural drywall partitions,20%h.c.upgradeDetails
demo non structural drywall partitions,install new non structural drywall partitions,20%h.c.upgrade | $6,000 |
| Jul 8, 2003 | Completed final sign-off Aug 2003 | 501 Laguna Honda Bl | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $19,400 |
| Jan 30, 2003 | Completed final sign-off Jun 2003 | 501 Laguna Honda Bl | Comm Air Mechanical | relocate hvac condensing unit fm bell tower to outdoor behind blgd. & enclosed in decorative screenDetails
relocate hvac condensing unit fm bell tower to outdoor behind blgd. & enclosed in decorative screen | $15,000 |
| Mar 1, 2002 | Completed final sign-off Aug 2002 | 20 Woodside Av | Balch Petroleum Contractors & Builders | installation of (3) panel antennas and (1) gps antenna to be located inside (e) church bell tower, eDetails
installation of (3) panel antennas and (1) gps antenna to be located inside (e) church bell tower, e | $45,000 |
| Jun 5, 2000 | Completed final sign-off Aug 2000 | 501 Laguna Honda Bl | L.D. Strobel Co Ltd | revise to appln #200002172129Details
revise to appln #200002172129 | |
| Apr 11, 2000 | Completed final sign-off Aug 2000 | 501 Laguna Honda Bl | revise to bpa #200002172129 electrical revision change approved ceiling mountedDetails
revise to bpa #200002172129 electrical revision change approved ceiling mounted | $2,000 | |
| Feb 17, 2000 | Completed final sign-off Aug 2000 | 501 Laguna Honda Bl | electrical upgrade w/asso electrical mech & tel installationDetails
electrical upgrade w/asso electrical mech & tel installation | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- L.D. Strobel Co Ltd (7), Teutonic Construction Inc (2), Balch Petroleum Contractors & Builders, Comm Air Mechanical, Donny Chu Construction Inc Dba D C Cons, Goffo Construction Inc, Green Drake Engineering, Inc., James A Mc Grath Dba: Teutonic, Mastec Network Solutions Inc, Metropolitan Electrical Construction, Norcal Communications & Construction Inc, Ravig Inc Dba Salient Global Technologi, Tom Lee Roofing Inc., Tristrux Llc Dba Tristrux Construction, Wicomm Inc
- Architects
- Glen Hunt, Nestor Popowych, Pete Retondo, Robert Bradsby, Stephan Walker
- Engineers
- Christopher Wener, Daniel Connell, James Spore, Larry Houghtby, Tahzay Ramirez
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.