Robert Bradsby
- Listed as
- architect, authorized agent-others
- Firm
- Robert Bradsby Architect
- Based in
- Piedmont
- On San Francisco permits
- Jul 2000 to Aug 2026
43 permits since 2000 (architect on 42 permits, authorized agent-others on 1 permit): 21 completed, 8 in progress, 7 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 4345 20th St | legalization udu on 1/f and addition of state adu at basement lvl. excavate (e) slab and add (n),convert into habitable space. modify front & side elevations, access stairs & add landscaping. new laundry.Details
legalization udu on 1/f and addition of state adu at basement lvl. excavate (e) slab and add (n),convert into habitable space. modify front & side elevations, access stairs & add landscaping. new laundry. | $220,000 | |
| Jul 4, 2026 | In progress filed Jul 2026, not yet issued | 291 Richland Av | addition, excavate below (e) 1/f & (e) front setback to create (n) basement lvl, for (n) parking garage, (n) addition into (e) front setback at (n) basement lvl, create (n) driveway & landscaping, (n) curbcut, convert (e) non-habitable 1/f to habitable space, (n) fixtures, finishes & services-Details
addition, excavate below (e) 1/f & (e) front setback to create (n) basement lvl, for (n) parking garage, (n) addition into (e) front setback at (n) basement lvl, create (n) driveway & landscaping, (n) curbcut, convert (e) non-habitable 1/f to habitable space, (n) fixtures, finishes & services- | $250,000 | |
| Jun 23, 2026 | In progress issued Sep 2026 | 8027 Geary Bl | Bluefield Construction | revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations.Details
revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations. | $8,000 |
| May 15, 2025 | In progress issued Nov 2025 | 8027 Geary Bl | Bluefield Construction | addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. removeDetails
addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. remove | $350,000 |
| Mar 21, 2025 | Completed final sign-off Mar 2025 | 1416 07th Av | as built to pa# 202503061705. new wet bar at 1st floor. show new door to bathroom at 3rd floor.Details
as built to pa# 202503061705. new wet bar at 1st floor. show new door to bathroom at 3rd floor. | ||
| Mar 6, 2025 | Completed final sign-off Mar 2025 | 1416 07th Av | revision to pa 2013-0815-4466 convert bathroom to laundry on 3rd fl. relocate powder room on 4th flDetails
revision to pa 2013-0815-4466 convert bathroom to laundry on 3rd fl. relocate powder room on 4th fl | ||
| Dec 10, 2024 | Completed final sign-off Aug 2025 | 546 Elizabeth St | Russ Murphy Construction | revision to existing plans permit#: 202409100467. redesign footing at grid line. add window to (n) lightwell by excavation existing breezeway, adding foundation walls as per structural and add new window. convert (e) storage to (n) officeDetails
revision to existing plans permit#: 202409100467. redesign footing at grid line. add window to (n) lightwell by excavation existing breezeway, adding foundation walls as per structural and add new window. convert (e) storage to (n) office | $15,000 |
| Dec 3, 2024 | Completed final sign-off Dec 2025 | 26 Retiro Wy | revision to pa # 202307121967: #26 retiro way (upper unit)-omit (n) bathroom, (n) laundry, & (n) window openings. revise bathroom remodel, reduce structural work includes to omit (n) exterior stair, skylight window openings and shearwalls on 3rd floor only; add (n) electrical & hvac throughout.Details
revision to pa # 202307121967: #26 retiro way (upper unit)-omit (n) bathroom, (n) laundry, & (n) window openings. revise bathroom remodel, reduce structural work includes to omit (n) exterior stair, skylight window openings and shearwalls on 3rd floor only; add (n) electrical & hvac throughout. | ||
| Oct 30, 2024 | Completed final sign-off Dec 2024 | 580 Sutter St | Switch Construction | revision to pa # 2024-0624-5094 remove (n) floor sink from scope. show (e) floor sink below water heater. relocate refuse area, ice maker, storage equipment and mop sink.Details
revision to pa # 2024-0624-5094 remove (n) floor sink from scope. show (e) floor sink below water heater. relocate refuse area, ice maker, storage equipment and mop sink. | |
| Oct 5, 2024 | In progress filed Oct 2024, not yet issued | 150 Saint Germain Av | interior addition & remodel to (e) single family dwelling: excavate (e) crawl space below (e) basement & convert to habitable space, to include (n) music room, (n) sitting room, (n) gym, (n) bathroom & (n) staircase -(n) exterior openings & patio - (e) basemnt level to become (n) 1st floorDetails
interior addition & remodel to (e) single family dwelling: excavate (e) crawl space below (e) basement & convert to habitable space, to include (n) music room, (n) sitting room, (n) gym, (n) bathroom & (n) staircase -(n) exterior openings & patio - (e) basemnt level to become (n) 1st floor | $286,952 | |
| Sep 10, 2024 | Completed final sign-off Aug 2025 | 546 Elizabeth St | Russ Murphy Construction | interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughoutDetails
interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughout | $152,596 |
| Jun 24, 2024 | Completed final sign-off Dec 2024 | 580 Sutter St | Switch Construction | demo and replace e bar, seating, fixtures and finishes, add new bar framing, casework, services, equipment, fixtures finishes. new wall and ceiling finishes and new flooring throughout. note extent of work prev permitted 202106172693Details
demo and replace e bar, seating, fixtures and finishes, add new bar framing, casework, services, equipment, fixtures finishes. new wall and ceiling finishes and new flooring throughout. note extent of work prev permitted 202106172693 | $50,000 |
| Jun 24, 2024 | In progress filed Jun 2024, not yet issued | 2345 Divisadero St | to comply with nov 202422161 add new skylight @ top floor; add additional height to (e) previously permitted guardrail/privacy screens @ roof deckDetails
to comply with nov 202422161 add new skylight @ top floor; add additional height to (e) previously permitted guardrail/privacy screens @ roof deck | $5,000 | |
| Jun 5, 2024 | Completed final sign-off Aug 2025 | 20 Woodside Av | Teutonic Construction Inc | to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structuralDetails
to comply with abe ord 51-16 abe #202406050147. remodel kitchen area & accessibility upgrades in (e) child care facility: remove (e) kitchen equipment, finishes & services, replace with (n) throughout. accessibility upgrades to (e) business entrance per sf-abe program. no other work - no structural | $43,228 |
| May 9, 2024 | In progress issued Dec 2024 | 719 Clementina St | Zeus Construction Corp. | remodel (e) live-work unit in 2-unit live-work condo bldg- remove (e) structure & portion of work space @ rear of 1st flr and create rear yard/courtyard -add (n) bathroom & interior framing @ 1st flr-(n) rowder rm, (n) laundry closet, & (n) kitchen in (n) location @ 2nd flr.(n) glazing units @ rearDetails
remodel (e) live-work unit in 2-unit live-work condo bldg- remove (e) structure & portion of work space @ rear of 1st flr and create rear yard/courtyard -add (n) bathroom & interior framing @ 1st flr-(n) rowder rm, (n) laundry closet, & (n) kitchen in (n) location @ 2nd flr.(n) glazing units @ rear | $250,000 |
| Mar 15, 2024 | Completed final sign-off Sep 2024 | 1497 Potrero Av | Brunton Construction | interior remodel to (e) live work unit #5: remove (e) interior stair, move to (n) location- remove & relocate (e) bathroom at mezzanine level, infill (e) opening- add (n) non-structural partition walls to create (n) lobby & storage area. minor electrical work- no other work, no mezzanine expansionDetails
interior remodel to (e) live work unit #5: remove (e) interior stair, move to (n) location- remove & relocate (e) bathroom at mezzanine level, infill (e) opening- add (n) non-structural partition walls to create (n) lobby & storage area. minor electrical work- no other work, no mezzanine expansion | $40,000 |
| Nov 13, 2023 | Expired or cancelled expired Apr 2026 | 2727 Clay St | Build 33 Inc. | remodel (e) unit in 5 unit residential, unit #:5- convert 173 sqft area of non-habitable storage space into habitable space + add to (e) unit- reconfigure interior layout, fixtures, services + finishes -(n) slab throughout (n) and modified frame (e) exterior openings; no seismic alterationDetails
remodel (e) unit in 5 unit residential, unit #:5- convert 173 sqft area of non-habitable storage space into habitable space + add to (e) unit- reconfigure interior layout, fixtures, services + finishes -(n) slab throughout (n) and modified frame (e) exterior openings; no seismic alteration | $72,000 |
| Aug 10, 2023 | Never finaled filed Aug 2023, never issued | 1750 Taylor St | in addition to work performed under 202110070028: replace (e) supporting column at front entry patio. no work in public rowDetails
in addition to work performed under 202110070028: replace (e) supporting column at front entry patio. no work in public row | $10,000 | |
| Jan 6, 2023 | Completed final sign-off Jan 2025 | 2727 Clay St | remove e interior fireplace chmney breast from all 4 stories and above roofline, add n supporting structure as necessary, remove e closet from unit# 3. no other work.Details
remove e interior fireplace chmney breast from all 4 stories and above roofline, add n supporting structure as necessary, remove e closet from unit# 3. no other work. | $4,000 | |
| Nov 15, 2022 | Completed final sign-off Dec 2023 | 766 33rd Av | new habitable space (596sf) in garage. to include 2 bedrooms and new bath. remodel e kitchen and master bedroom suite.Details
new habitable space (596sf) in garage. to include 2 bedrooms and new bath. remodel e kitchen and master bedroom suite. | $386,000 | |
| Feb 22, 2022 | Never finaled filed Feb 2022, never issued | 447 16th Av | addition and remodel to (e) 2 unit residential: convert (e) non habitable ground floor space into habitable and add the (e) unit #a. full interior remodel to (e) building. partial (n) framing, fixtures, finishes and services thorughout. new glazing rear.Details
addition and remodel to (e) 2 unit residential: convert (e) non habitable ground floor space into habitable and add the (e) unit #a. full interior remodel to (e) building. partial (n) framing, fixtures, finishes and services thorughout. new glazing rear. | $123,000 | |
| Dec 21, 2021 | Completed final sign-off May 2022 | 540 Clement St | Mount Street Construction | tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187Details
tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187 | $122,000 |
| Dec 6, 2021 | Expired or cancelled expired Apr 2024 | 137 16th Av | revision to permit 201812218953. convert (e) non-habitable attic space into habitable space and add to (e) upper unit 137, new interior access stair, new bathroom, fixtures, finishes, and services to new habitable space.Details
revision to permit 201812218953. convert (e) non-habitable attic space into habitable space and add to (e) upper unit 137, new interior access stair, new bathroom, fixtures, finishes, and services to new habitable space. | $56,000 | |
| May 18, 2021 | Completed final sign-off Aug 2023 | 1750 Taylor St | Black Mountain Development | remodel gymnasium spage, fitness studios & toilet rooms to include (n) framing, fixtures, finishes & services. (n) management office, (n) exterior glazed openings. modify (e) interior openings & add glazing. reconfigure & remodel (e) management offices into communal library & lounge for residents.Details
remodel gymnasium spage, fitness studios & toilet rooms to include (n) framing, fixtures, finishes & services. (n) management office, (n) exterior glazed openings. modify (e) interior openings & add glazing. reconfigure & remodel (e) management offices into communal library & lounge for residents. | $150,000 |
| Jan 25, 2021 | Never finaled issued Jan 2022, no final | 1650 Jackson St | Gomez Iron Works | add a new security gate at secondary egress/service door. new gate required dpw-mse permit, filed separately.Details
add a new security gate at secondary egress/service door. new gate required dpw-mse permit, filed separately. | $5,000 |
| Jan 4, 2021 | In progress issued Dec 2024 | 105 Jarboe Av | remodel & 2nd floor addition to (e) single family dwelling: add (n) 2nd floor addition habitable structure, sized & located per zoning reqirements - remodel (e) 1st floor interior, (n) kitchen & powder-room, (n) interior stair to (n) 2nd floor, (n) interior partion wall at basement levelDetails
remodel & 2nd floor addition to (e) single family dwelling: add (n) 2nd floor addition habitable structure, sized & located per zoning reqirements - remodel (e) 1st floor interior, (n) kitchen & powder-room, (n) interior stair to (n) 2nd floor, (n) interior partion wall at basement level | $150,236 | |
| Oct 29, 2020 | Expired or cancelled withdrawn Nov 2022 | 200 Glenview Dr | convert (e) non-habitable basement into habitable. add new structure, fixtures, finishes & services to convert (e) basement. crawl space into 2 floors of habitable space. remodel (e) throughout. add new 3rd floor deck to rear elevation. reconfigure (e) exterior window / door. add new openings.Details
convert (e) non-habitable basement into habitable. add new structure, fixtures, finishes & services to convert (e) basement. crawl space into 2 floors of habitable space. remodel (e) throughout. add new 3rd floor deck to rear elevation. reconfigure (e) exterior window / door. add new openings. | $455,604 | |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 1640 Haight St | Brendan Lalor Construction | to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair.Details
to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair. | $40,000 |
| May 14, 2019 | Expired or cancelled withdrawn Sep 2019 | 2003 Broadway | adding new dwelling unit to (e) 2 unit residental: convert (e) habitable space at 1st fl into (n) 2 bedroom dwelling unit. add new kitchen, add new unit entry/egress to (e) side passageway.Details
adding new dwelling unit to (e) 2 unit residental: convert (e) habitable space at 1st fl into (n) 2 bedroom dwelling unit. add new kitchen, add new unit entry/egress to (e) side passageway. | $40,000 | |
| Jul 21, 2009 | Never finaled issued Aug 2009, no final | 42 Hotaling Pl | Bbc Construction Inc. | site permit for change of use at 2nd floor from retail to residential. provide 1 hr assembly by removing two stairs and filling openings. cost estimate may have to be revised at time of addendum based on final scope of work. if valuation changes, separate permit required. sfbc 106a.4.7Details
site permit for change of use at 2nd floor from retail to residential. provide 1 hr assembly by removing two stairs and filling openings. cost estimate may have to be revised at time of addendum based on final scope of work. if valuation changes, separate permit required. sfbc 106a.4.7 | $13,000 |
| Apr 17, 2009 | Completed final sign-off Aug 2009 | 38 Hotaling Pl | Bbc Construction Inc. | revision to pa# 2007-1121-8770: demolition of toilet room (bathroom) & non bearing partitions in commercial space (ab-017), addition of 2 rated access doors & partition for residential stairway.Details
revision to pa# 2007-1121-8770: demolition of toilet room (bathroom) & non bearing partitions in commercial space (ab-017), addition of 2 rated access doors & partition for residential stairway. | $6,000 |
| Oct 23, 2008 | Expired or cancelled expired Jun 2010 | 1326 Natoma St | Smart Builders | to comply w/ nov 200707546, new windows replacement, damage by fire, replace plaster for sheet rook, install new insulation, plumbing lines & fixtures, electrical wiring & penal box, and retrofit reinforcement. seismic retrofit.Details
to comply w/ nov 200707546, new windows replacement, damage by fire, replace plaster for sheet rook, install new insulation, plumbing lines & fixtures, electrical wiring & penal box, and retrofit reinforcement. seismic retrofit. | $40,000 |
| Jun 3, 2008 | Completed final sign-off Aug 2009 | 38 Hotaling Pl | 2nd & 3rd floor: interior soft demolition of non-load bearing partitions, fixtures, cabinetry in preparation for residential remodel per pa #200711218770 (per ab-017).Details
2nd & 3rd floor: interior soft demolition of non-load bearing partitions, fixtures, cabinetry in preparation for residential remodel per pa #200711218770 (per ab-017). | $4,500 | |
| Apr 2, 2008 | Completed final sign-off Aug 2008 | 243 Brannan St | ti on the ground floor install suspended acoustical ceiling, lighting, interior partitions, handrails at ex. ramp and aluminum and glass partitions first time tenant. elect, plumb, mech & fire sprinkler, permits under separate permit applicaitons.Details
ti on the ground floor install suspended acoustical ceiling, lighting, interior partitions, handrails at ex. ramp and aluminum and glass partitions first time tenant. elect, plumb, mech & fire sprinkler, permits under separate permit applicaitons. | $73,000 | |
| Mar 17, 2008 | Completed final sign-off Dec 2008 | 379 Highland Av | 1st floor: add a bathroom & replace (e) door at front,new doors added at bahtroom vestibule 2nd floor: replace existing window with sliding glass door, add doors to existing livingroom, add closet to existing bedroom, infill existing door to rear deck.Details
1st floor: add a bathroom & replace (e) door at front,new doors added at bahtroom vestibule 2nd floor: replace existing window with sliding glass door, add doors to existing livingroom, add closet to existing bedroom, infill existing door to rear deck. | $15,000 | |
| Dec 31, 2007 | Never finaled issued Dec 2007, no final | 580 Washington St | revision to 200412242147. change stair #2 and ada toilet locations. addition of 1 ada toilet at basement. no exterior work. no change in occupancy. mep separate permitDetails
revision to 200412242147. change stair #2 and ada toilet locations. addition of 1 ada toilet at basement. no exterior work. no change in occupancy. mep separate permit | $9,500 | |
| Nov 21, 2007 | Completed final sign-off Aug 2009 | 38 Hotaling Pl | demo of non historic street level doors and storefront. demo of 3rd fl office tenant improvements. new residential int. walls, doors,finishes on 3/f. new stair 3rd to roof w/ stair pernthouse and roof deck. new egress balconies @ rear of 2/f & 3/f with ladders to roof.Details
demo of non historic street level doors and storefront. demo of 3rd fl office tenant improvements. new residential int. walls, doors,finishes on 3/f. new stair 3rd to roof w/ stair pernthouse and roof deck. new egress balconies @ rear of 2/f & 3/f with ladders to roof. | $350,000 | |
| Sep 17, 2007 | Never finaled issued Sep 2007, no final | 522 Sutter St | revision to appl. #200707066154. sized new header for openings in stock room 108, office 205, & office 200. removed ceiling baffels and headers from sales room.Details
revision to appl. #200707066154. sized new header for openings in stock room 108, office 205, & office 200. removed ceiling baffels and headers from sales room. | $1,500 | |
| Jul 6, 2007 | Never finaled issued Jul 2007, no final | 522 Sutter St | t.i.; ground floor and basement; remove and add new nonload bearing partitions in retail store and basement storage areas. mep under separate permit.Details
t.i.; ground floor and basement; remove and add new nonload bearing partitions in retail store and basement storage areas. mep under separate permit. | $60,000 | |
| May 8, 2007 | Completed final sign-off Aug 2007 | 2237 Fillmore St | build shevling unit, rebuild dressingf trooms, cosmetic work-paint, change flooring & lighting. platform for window. expand retail space add from back room. no change in building envelope. mech & electrical work seperate permit.Details
build shevling unit, rebuild dressingf trooms, cosmetic work-paint, change flooring & lighting. platform for window. expand retail space add from back room. no change in building envelope. mech & electrical work seperate permit. | $60,000 | |
| Jul 3, 2006 | Expired or cancelled expired Aug 2009 | 580 Washington St | change of use, 2/f & 3/f to condominium units. work in basement for new pg&e service. no work on street frontage/facade. change of occupancy, seismic upgrade under appl#200412242147.Details
change of use, 2/f & 3/f to condominium units. work in basement for new pg&e service. no work on street frontage/facade. change of occupancy, seismic upgrade under appl#200412242147. | $240,000 | |
| Mar 23, 2006 | Expired or cancelled expired Jan 2008 | 580 Washington St | discovery & in preparation for seismic upgrade interior demolition only.Details
discovery & in preparation for seismic upgrade interior demolition only. | $10,000 | |
| Jul 6, 2000 | Completed final sign-off Aug 2000 | 38 Hotaling Pl | repair water damaged carpet and dry wallDetails
repair water damaged carpet and dry wall | $50,000 |