Build 33 Inc.
- Based in
- Cupertino
- On San Francisco permits
- Apr 2023 to Mar 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2024 | Completed final sign-off Jan 2025 | 2727 Clay St | revision "1" to pa#202305087293. revise the foundation detail at the property line due to shared foundation sister extg brick foundation with new reinforced concrete foundation.Details
revision "1" to pa#202305087293. revise the foundation detail at the property line due to shared foundation sister extg brick foundation with new reinforced concrete foundation. | |
| Nov 13, 2023 | Expired or cancelled expired Apr 2026 | 2727 Clay St | remodel (e) unit in 5 unit residential, unit #:5- convert 173 sqft area of non-habitable storage space into habitable space + add to (e) unit- reconfigure interior layout, fixtures, services + finishes -(n) slab throughout (n) and modified frame (e) exterior openings; no seismic alterationDetails
remodel (e) unit in 5 unit residential, unit #:5- convert 173 sqft area of non-habitable storage space into habitable space + add to (e) unit- reconfigure interior layout, fixtures, services + finishes -(n) slab throughout (n) and modified frame (e) exterior openings; no seismic alteration | $72,000 |
| Aug 14, 2023 | Completed final sign-off Oct 2024 | 2060 Polk St | tenant improvement to existing retail space including reconfigure (e) bathroom to be accessible. install accessible cash wrap counter. install new lighting.Details
tenant improvement to existing retail space including reconfigure (e) bathroom to be accessible. install accessible cash wrap counter. install new lighting. | $36,000 |
| May 8, 2023 | Completed final sign-off Jan 2025 | 2727 Clay St | mandatory soft story retrofit per 2022 sfebc appendix a4. add ply shear walls and simpson panels. replace brick foundation with new reinforced concrete foundation. mahar ord. n/a.Details
mandatory soft story retrofit per 2022 sfebc appendix a4. add ply shear walls and simpson panels. replace brick foundation with new reinforced concrete foundation. mahar ord. n/a. | $120,000 |
| Apr 11, 2023 | Completed final sign-off Mar 2024 | 1145 Pine St | demo current bathroom- remove sink, tub, toilet, window, tile- floor and wall. replace sink, toliet, tub, window, tile- floor and wall- like for like. no electrical change no plumbing change. max u factor 0.3Details
demo current bathroom- remove sink, tub, toilet, window, tile- floor and wall. replace sink, toliet, tub, window, tile- floor and wall- like for like. no electrical change no plumbing change. max u factor 0.3 | $14,000 |