Back to bathroom remodel contractors
Build 33 Inc.
- Based in
- Cupertino
- On San Francisco permits
- Apr 2023 to Mar 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 5 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2023 | Completed final sign-off Oct 2024 | 2060 Polk St | tenant improvement to existing retail space including reconfigure (e) bathroom to be accessible. install accessible cash wrap counter. install new lighting.Details
tenant improvement to existing retail space including reconfigure (e) bathroom to be accessible. install accessible cash wrap counter. install new lighting. | $36,000 |
| Apr 11, 2023 | Completed final sign-off Mar 2024 | 1145 Pine St | demo current bathroom- remove sink, tub, toilet, window, tile- floor and wall. replace sink, toliet, tub, window, tile- floor and wall- like for like. no electrical change no plumbing change. max u factor 0.3Details
demo current bathroom- remove sink, tub, toilet, window, tile- floor and wall. replace sink, toliet, tub, window, tile- floor and wall- like for like. no electrical change no plumbing change. max u factor 0.3 | $14,000 |