Bluefield Construction
- Based in
- Hayward
- On San Francisco permits
- Jul 2013 to Jun 2026
- Last 24 months
- 3 permits filed
38 permits since 2000: 25 completed, 5 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Sep 2026 | 8027 Geary Bl | revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations.Details
revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations. | $8,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 1521 Larkin St | bathroom remodel like for likeDetails
bathroom remodel like for like | $10,000 |
| May 15, 2025 | In progress issued Nov 2025 | 8027 Geary Bl | addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. removeDetails
addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. remove | $350,000 |
| Jul 25, 2024 | In progress issued Jul 2024 | 424 Pennsylvania Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $26,000 |
| Sep 11, 2023 | Never finaled issued Sep 2023, no final | 36 Huntington Dr | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $15,000 |
| Apr 25, 2023 | Expired or cancelled cancelled Jul 2025 | 150 Noe St | unit #150: kitchen & bath remodel like for like. drywall repair; unit #154: kitchen & bath remodel. like for like. drywall repair. total of (2) kitchens & (2) bathrooms, non structuralDetails
unit #150: kitchen & bath remodel like for like. drywall repair; unit #154: kitchen & bath remodel. like for like. drywall repair. total of (2) kitchens & (2) bathrooms, non structural | $25,000 |
| Jun 29, 2022 | Completed final sign-off Jun 2023 | 2262 26th Av | replace front windows (5 windows) from sliding to casement and fixed (3 fixed, 2 casement) with alum clad wood. same size & same location.Details
replace front windows (5 windows) from sliding to casement and fixed (3 fixed, 2 casement) with alum clad wood. same size & same location. | $1,000 |
| Jun 7, 2022 | Completed final sign-off Jul 2023 | 2262 26th Av | 1st floor: add 2 bedroom, media and 2 full bath. 2nd floor: remodel kitchen, bathroom add 1 full bath. infill lightwell. add roof deck.Details
1st floor: add 2 bedroom, media and 2 full bath. 2nd floor: remodel kitchen, bathroom add 1 full bath. infill lightwell. add roof deck. | $120,000 |
| May 10, 2022 | Completed final sign-off Feb 2023 | 731 23rd Av | 1st fl add 2 bedrooms, 2 full baths and family room. 2nd fl remodel kitchen, bath, add 2.5 bath and reconfigure interior stairs.Details
1st fl add 2 bedrooms, 2 full baths and family room. 2nd fl remodel kitchen, bath, add 2.5 bath and reconfigure interior stairs. | $150,000 |
| May 5, 2022 | Expired or cancelled cancelled Jan 2025 | 320 Justin Dr | replace driveway (approx 110 sq. ft.) w/in front setback (50% for permeable)Details
replace driveway (approx 110 sq. ft.) w/in front setback (50% for permeable) | $800 |
| Apr 13, 2022 | Expired or cancelled cancelled Jan 2025 | 320 Justin Dr | repair front dry rot stairs less than 50% and patch stucco around stairs.Details
repair front dry rot stairs less than 50% and patch stucco around stairs. | $5,000 |
| Dec 7, 2021 | Expired or cancelled cancelled Jul 2025 | 152 Noe St | foundation repair and structural beams and posts at basement level to mitigate floor deflectionDetails
foundation repair and structural beams and posts at basement level to mitigate floor deflection | $30,000 |
| Aug 27, 2020 | In progress issued Oct 2023 | 54 Sunview Dr | attached adu addition in the rear per ordinance #162-16.roof deck/open space for adu, new windows. new garage doors.Details
attached adu addition in the rear per ordinance #162-16.roof deck/open space for adu, new windows. new garage doors. | $150,000 |
| Jan 4, 2019 | Never finaled issued Jan 2019, no final | 6420 Fulton St | bathroom remodel, 8'6"x9'0" on 2nd floor.Details
bathroom remodel, 8'6"x9'0" on 2nd floor. | $1,500 |
| Jan 23, 2018 | Completed final sign-off Dec 2018 | 1521 Larkin St | kitchen remodelDetails
kitchen remodel | $30,000 |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 1104 Brazil Av | foundation repair and replacement.Details
foundation repair and replacement. | $5,000 |
| Jun 26, 2017 | Completed final sign-off Mar 2018 | 543 22nd Av | 2nd floor: add one new bathroom, remodel 2 extg bedrooms and kitchen. ground floor: add 2 nw bedrooms, 2.5 nw bath, family rm, sheetrock garage. exterior replace rear windows and patio dr in kind at rear, add 4 n skylites e roofDetails
2nd floor: add one new bathroom, remodel 2 extg bedrooms and kitchen. ground floor: add 2 nw bedrooms, 2.5 nw bath, family rm, sheetrock garage. exterior replace rear windows and patio dr in kind at rear, add 4 n skylites e roof | $85,000 |
| May 15, 2017 | Completed final sign-off Oct 2017 | 1104 Brazil Av | g/f: add new bathrm, 1 new half bath. remodel 2 (e) bedrooms, kitchen, living & dining room. basement: add 2 new bedrooms, 2.5 bathrooms, family room, sheetrock garage. exterior: replace 2 windows, 1 patio door at rear, replace glass to window on drivewayDetails
g/f: add new bathrm, 1 new half bath. remodel 2 (e) bedrooms, kitchen, living & dining room. basement: add 2 new bedrooms, 2.5 bathrooms, family room, sheetrock garage. exterior: replace 2 windows, 1 patio door at rear, replace glass to window on driveway | $130,000 |
| Feb 22, 2017 | Completed final sign-off Jun 2017 | 2331 16th Av | 2/f add 1 (n) bathroom, remodel (e) bathroom & kitchen. g/f add 2 (n) bathroomd, 2(n) bedrooms, new familt rm, sheetrock garage. exterior: replace 6 vinyl windows at rear in kind, 1 patio door, add 1 new skylightDetails
2/f add 1 (n) bathroom, remodel (e) bathroom & kitchen. g/f add 2 (n) bathroomd, 2(n) bedrooms, new familt rm, sheetrock garage. exterior: replace 6 vinyl windows at rear in kind, 1 patio door, add 1 new skylight | $98,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 2339 37th Av | remodel (e) one & half bathroom on 2nd floor; remodel (e) i full bathroom on 3rd floor per planDetails
remodel (e) one & half bathroom on 2nd floor; remodel (e) i full bathroom on 3rd floor per plan | $25,000 |
| Dec 9, 2016 | Completed final sign-off Jul 2017 | 218 Justin Dr | 2nd floor: add one new bathroom, remodel kitchen, and bathroom & bedroom. g/f: add 2 nw bathroom, 2 nw bedrooms, nw family room, nw laundry room. extrior: replace patio door vinyl in kind at rear. add 4 new skylights.Details
2nd floor: add one new bathroom, remodel kitchen, and bathroom & bedroom. g/f: add 2 nw bathroom, 2 nw bedrooms, nw family room, nw laundry room. extrior: replace patio door vinyl in kind at rear. add 4 new skylights. | $98,000 |
| Nov 21, 2016 | Completed final sign-off May 2017 | 368 Utah St | remodel existing bath room in place no structural workDetails
remodel existing bath room in place no structural work | $20,000 |
| Oct 3, 2016 | Completed final sign-off Mar 2017 | 437 Amazon Av | 2nd fl: add 1 new full bath, 1 new half bath, add new laundry rm, remodel e bath, remodel e kitchen. gr fl: add 2 new bdrms, 1 new bath, new home theater, sheetrock garage exterior, replace 3 vinyl windows in kind to rear, add 4 new skylightsDetails
2nd fl: add 1 new full bath, 1 new half bath, add new laundry rm, remodel e bath, remodel e kitchen. gr fl: add 2 new bdrms, 1 new bath, new home theater, sheetrock garage exterior, replace 3 vinyl windows in kind to rear, add 4 new skylights | $80,000 |
| Sep 2, 2016 | Expired or cancelled cancelled Jan 2017 | 1979 08th Av | kitchen remodelDetails
kitchen remodel | $10,000 |
| Aug 9, 2016 | Completed final sign-off May 2017 | 1683 Newcomb Av | 2nd floor - legalize area as game room, add (1) full bath, add (1) new powder room, remodel kitchen and bathroom, dining and living room and 2 (e) bedrooms; ground floor - add 2 (n) bedrooms, 2 (n) bathrooms & (n) home theater. sheetrock garage exterior & replace front right broken glass, replaceDetails
2nd floor - legalize area as game room, add (1) full bath, add (1) new powder room, remodel kitchen and bathroom, dining and living room and 2 (e) bedrooms; ground floor - add 2 (n) bedrooms, 2 (n) bathrooms & (n) home theater. sheetrock garage exterior & replace front right broken glass, replace | $100,000 |
| Mar 18, 2016 | Completed final sign-off Aug 2016 | 2055 20th Av | ground floor: add 2 baths, 2 bedrooms, one home theater. 2nd floor: add on bath, one powder room. remodel kitchen and bathroom, bedrooms. replace front window with new wood clad window 3 pieces, & 8 vinyle window at rear. install 5 skylights at roof. to comply with nov #201530174.Details
ground floor: add 2 baths, 2 bedrooms, one home theater. 2nd floor: add on bath, one powder room. remodel kitchen and bathroom, bedrooms. replace front window with new wood clad window 3 pieces, & 8 vinyle window at rear. install 5 skylights at roof. to comply with nov #201530174. | $120,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 427 Huron Av | add family room, play room, study room and 3 full bathrooms & laundry on (e) ground floor. add full bathroom & remodel (e) 2 full baths on 2nd floorDetails
add family room, play room, study room and 3 full bathrooms & laundry on (e) ground floor. add full bathroom & remodel (e) 2 full baths on 2nd floor | $120,000 |
| Nov 30, 2015 | Completed final sign-off May 2016 | 491 Madrid St | g/f- add (1) bathroom, (2) bedrooms & home theatre. 2/f- add (1) bathroom, remodel (e) kitchen & bathroom.Details
g/f- add (1) bathroom, (2) bedrooms & home theatre. 2/f- add (1) bathroom, remodel (e) kitchen & bathroom. | $65,000 |
| Aug 20, 2015 | Completed final sign-off Sep 2015 | 342 Monterey Bl | revision to 2014.0909.5904: no fillet weld and rebar inspection. per inspector requestDetails
revision to 2014.0909.5904: no fillet weld and rebar inspection. per inspector request | |
| Sep 23, 2014 | Completed final sign-off Apr 2015 | 472 Euclid Av | two (2) bathroom remodelsDetails
two (2) bathroom remodels | $22,000 |
| Sep 9, 2014 | Completed final sign-off Sep 2015 | 342 Monterey Bl | remove existing wall at the garage area. provide new steel beam and new post. relocate water heater, furnaceDetails
remove existing wall at the garage area. provide new steel beam and new post. relocate water heater, furnace | $9,000 |
| Jul 14, 2014 | Completed final sign-off Feb 2015 | 472 Euclid Av | kitchen remodel at 3rd floor. new cabinets, lighting, relocate refrigerator, install dishwasher, replace stove and sink. remove one nonberaing wall between kitchen and dining.Details
kitchen remodel at 3rd floor. new cabinets, lighting, relocate refrigerator, install dishwasher, replace stove and sink. remove one nonberaing wall between kitchen and dining. | $20,000 |
| Jun 26, 2014 | Completed final sign-off Apr 2015 | 1519 Larkin St | kitchen & bathroom remodel of lower unit at level above garage level per plan.Details
kitchen & bathroom remodel of lower unit at level above garage level per plan. | $40,000 |
| Apr 10, 2014 | Completed final sign-off Feb 2015 | 1881 15th St | interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind.Details
interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind. | $45,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 342 Monterey Bl | minor revision to pa #2013.0703.1090 - one of the new beam to be relocatedDetails
minor revision to pa #2013.0703.1090 - one of the new beam to be relocated | $1,000 |
| Dec 19, 2013 | Completed final sign-off Mar 2014 | 1883 15th St | extg bathroom remodel. new bathroom creation with shower, one vanity and relocate toilet.Details
extg bathroom remodel. new bathroom creation with shower, one vanity and relocate toilet. | $10,000 |
| Nov 18, 2013 | Completed final sign-off Dec 2014 | 1176 York St | repair dry-rot damage to the 3rd floor deck and landing in middle of bldg.Details
repair dry-rot damage to the 3rd floor deck and landing in middle of bldg. | $2,500 |
| Jul 3, 2013 | Completed final sign-off Apr 2014 | 342 Monterey Bl | install 3 new steel beams to repair exceeding deflection on floor.Details
install 3 new steel beams to repair exceeding deflection on floor. | $5,000 |