Bluefield Construction
- Based in
- Hayward
- On San Francisco permits
- Jul 2013 to Jun 2026
- Last 24 months
- 3 permits filed
38 permits since 2000: 25 completed, 5 in progress, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 2 completed, 2 in progress, 1 expired or cancelled. Typically 22 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Sep 2026 | 8027 Geary Bl | revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations.Details
revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations. | $8,000 |
| May 15, 2025 | In progress issued Nov 2025 | 8027 Geary Bl | addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. removeDetails
addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. remove | $350,000 |
| May 10, 2022 | Completed final sign-off Feb 2023 | 731 23rd Av | 1st fl add 2 bedrooms, 2 full baths and family room. 2nd fl remodel kitchen, bath, add 2.5 bath and reconfigure interior stairs.Details
1st fl add 2 bedrooms, 2 full baths and family room. 2nd fl remodel kitchen, bath, add 2.5 bath and reconfigure interior stairs. | $150,000 |
| Apr 13, 2022 | Expired or cancelled cancelled Jan 2025 | 320 Justin Dr | repair front dry rot stairs less than 50% and patch stucco around stairs.Details
repair front dry rot stairs less than 50% and patch stucco around stairs. | $5,000 |
| Apr 10, 2014 | Completed final sign-off Feb 2015 | 1881 15th St | interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind.Details
interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind. | $45,000 |