Victor Ramos
- Listed as
- architect, engineer
- Firm
- Ashley & Vance Engineering
- Based in
- Oakland
- On San Francisco permits
- Sep 2019 to Oct 2026
99 permits since 2000 (engineer on 97 permits, architect on 2 permits): 44 completed, 37 in progress, 7 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1422 Douglass St | Nima Construction | revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of wayDetails
revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of way | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 121 Yukon St | Mission Home Remodeling Inc | retaining wall rear yard, back of property line.Details
retaining wall rear yard, back of property line. | $50,000 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 121 Yukon St | Mission Home Remodeling Inc | expansion of garage at ground flr 12 cubic yards. bew crawl space at 2nd flr (rear only) 10 cubic yards. total excavation = 22 cubic yards. replacing floor shealthing at 2nd flr. installation or new wood shear walls at ground flr. no new plumbing fixture.Details
expansion of garage at ground flr 12 cubic yards. bew crawl space at 2nd flr (rear only) 10 cubic yards. total excavation = 22 cubic yards. replacing floor shealthing at 2nd flr. installation or new wood shear walls at ground flr. no new plumbing fixture. | $120,000 |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 341 Noe St | demo (e) rear deck,extr stair, platform, associated footings, railings and supports. construct new 104sf 2nd story rear deck, 65sf extr stairs and landing. replace ground level platform, new concrete footings and new 2-hr fire wall at p|l. no change to occupancy,use, floor area or building.Details
demo (e) rear deck,extr stair, platform, associated footings, railings and supports. construct new 104sf 2nd story rear deck, 65sf extr stairs and landing. replace ground level platform, new concrete footings and new 2-hr fire wall at p|l. no change to occupancy,use, floor area or building. | $10,000 | |
| Aug 21, 2026 | In progress issued Aug 2026 | 1038 Capitol Av | Carter's Devco Llc | revision to pa # 202607165151 - remove bathroom on ground floor from existing plan and remove bearing wall.Details
revision to pa # 202607165151 - remove bathroom on ground floor from existing plan and remove bearing wall. | |
| Jul 16, 2026 | Expired or cancelled cancelled Sep 2026 | 1038 Capitol Av | Carter's Devco Llc | rev 202509296283: additiion of full bath on g/f. add new lighting, powerl and plumbing. replce (e) footing and partition between new bath and flex room on g/f due to inadequate foundation and framing dry rot discovery.Details
rev 202509296283: additiion of full bath on g/f. add new lighting, powerl and plumbing. replce (e) footing and partition between new bath and flex room on g/f due to inadequate foundation and framing dry rot discovery. | $22,500 |
| Jun 23, 2026 | In progress issued Sep 2026 | 8027 Geary Bl | Bluefield Construction | revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations.Details
revision pa#: 202505015573, reconfigure (e) ground floor unit - reconfigure (e) upper unit entry hall + stairs - infill portion of (e) lightwell at 2nd flr - remove (e) 2 -story deck + stair at rear. add (n) cantilverered decks at 2nd + 3rd flr - reconfigure to all exterior elevations. | $8,000 |
| Jun 9, 2026 | In progress filed Jun 2026, not yet issued | 505 Gennessee St | partial new ground floor concrete foundation and slab. new framing for 2 new bedrooms and closets, new exterior sliding doors, new stairs from 2nd floor, new rear yard concrete stair and retaining walls. new electrical outlets, lighting, hvac duct extensions under separate permits.Details
partial new ground floor concrete foundation and slab. new framing for 2 new bedrooms and closets, new exterior sliding doors, new stairs from 2nd floor, new rear yard concrete stair and retaining walls. new electrical outlets, lighting, hvac duct extensions under separate permits. | $90,000 | |
| May 6, 2026 | In progress issued May 2026 | 211 Divisadero St | A N R Development | revision to pa# 202603167604: structural drawings to verify foundation and to install new post & beam.Details
revision to pa# 202603167604: structural drawings to verify foundation and to install new post & beam. | $20,000 |
| Apr 28, 2026 | Completed final sign-off Sep 2026 | 3024 California St | Mission Home Remodeling Inc | revision to permit 202603208023. hold down to foundation with curb.Details
revision to permit 202603208023. hold down to foundation with curb. | |
| Mar 26, 2026 | In progress issued Mar 2026 | 3107 Washington St | Houseworks Enterprises Inc. | revision pa# 202512151802 per instructions from the field inspector to revise ap for the repair of the (e) stairs. more dry rot that anticipated was discovered require more replacement. these plans reflect that request. additional since we were doing additional enginerring our clinets asked forDetails
revision pa# 202512151802 per instructions from the field inspector to revise ap for the repair of the (e) stairs. more dry rot that anticipated was discovered require more replacement. these plans reflect that request. additional since we were doing additional enginerring our clinets asked for | $5,000 |
| Mar 20, 2026 | Completed final sign-off Sep 2026 | 3024 California St | Mission Home Remodeling Inc | 3/f: remove wall b/t kitchen and dining. remove fireplace. remodel kitchen and 2 bathrooms. r/r closet doors. remove low guard walls and provide new full height wood slats guardrail walls. new hvac system. 2/f: remove fireplace. new hvac system. g/f: upgrade main panel to 200amp.Details
3/f: remove wall b/t kitchen and dining. remove fireplace. remodel kitchen and 2 bathrooms. r/r closet doors. remove low guard walls and provide new full height wood slats guardrail walls. new hvac system. 2/f: remove fireplace. new hvac system. g/f: upgrade main panel to 200amp. | $120,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 2566 Pine St | Terence Mcmahon Construction | demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plansDetails
demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plans | $40,000 |
| Feb 20, 2026 | In progress issued Mar 2026 | 2919 Webster St | Yefa Construction Inc | revision to permit 202212289279. minor interior modifications.Details
revision to permit 202212289279. minor interior modifications. | |
| Feb 20, 2026 | In progress issued Feb 2026 | 142 Chilton Av | Mission Home Remodeling Inc | remove (e) shower, create new laundry closet on 1/f. remove and relocate (e) laundry on 2/f. remodel and extend bathroom on 2/f.Details
remove (e) shower, create new laundry closet on 1/f. remove and relocate (e) laundry on 2/f. remodel and extend bathroom on 2/f. | $45,000 |
| Feb 13, 2026 | In progress issued Mar 2026 | 505 Gennessee St | Radiant Construction Company | ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom.Details
ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom. | $24,000 |
| Jan 30, 2026 | Completed final sign-off Sep 2026 | 223 Fair Oaks St | Cma Development Inc | structural modification, revision to 202509256084Details
structural modification, revision to 202509256084 | $1,000 |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1794 Page St | Mission Home Remodeling Inc | revision to 202505156518, partial replacment of brick foundationDetails
revision to 202505156518, partial replacment of brick foundation | $20,000 |
| Dec 22, 2025 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | front building: rebuild the existing deck within the same perimeter as existing and structurally reinforce it.Details
front building: rebuild the existing deck within the same perimeter as existing and structurally reinforce it. | $1,500 |
| Dec 19, 2025 | Expired or cancelled cancelled Jan 2026 | 665 Pacheco St | horizontal expansion of (e) 2-story, remodel 1/f living, dining and kitchen, relocate powder room on 1/f and 2 bedrooms and bathroom on 2/f, new family room on 1/f addition and bedroom on 2/f addition, new primary suite & laundry on 2/f, new rear yard access on 2/f w/exterior bridge, remodel & excavDetails
horizontal expansion of (e) 2-story, remodel 1/f living, dining and kitchen, relocate powder room on 1/f and 2 bedrooms and bathroom on 2/f, new family room on 1/f addition and bedroom on 2/f addition, new primary suite & laundry on 2/f, new rear yard access on 2/f w/exterior bridge, remodel & excav | $1,096,500 | |
| Dec 19, 2025 | Expired or cancelled cancelled Jan 2026 | 665 Pacheco St | detached rear yard 1-story adu, type 5b, 313 sqftDetails
detached rear yard 1-story adu, type 5b, 313 sqft | ||
| Oct 16, 2025 | In progress issued Feb 2026 | 1038 Capitol Av | comply to nov 2025-35932 (e) original 2/f rear yard extension and exterior stairs were fully enclosed and converted into a 2-story extension of approx 13'x12'-6", including internal staircase. new electrical permit for installed lighting and power-both floors.Details
comply to nov 2025-35932 (e) original 2/f rear yard extension and exterior stairs were fully enclosed and converted into a 2-story extension of approx 13'x12'-6", including internal staircase. new electrical permit for installed lighting and power-both floors. | $25,000 | |
| Sep 26, 2025 | Completed final sign-off May 2026 | 74 Prospect Av | Barry O Mahony Construction | revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes.Details
revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes. | $102,491 |
| Sep 25, 2025 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | (front building) modification and replacement of (e) side and rear windows at the lower and level 1 (unit 1). windows will be replaced with new wood fixed and casement windows. (e) wood fixed and casement windows. (n) windows minic (e) windows. replacement of siding in kind where impacted fur outDetails
(front building) modification and replacement of (e) side and rear windows at the lower and level 1 (unit 1). windows will be replaced with new wood fixed and casement windows. (e) wood fixed and casement windows. (n) windows minic (e) windows. replacement of siding in kind where impacted fur out | $4,000 |
| Sep 25, 2025 | Completed final sign-off Sep 2026 | 223 Fair Oaks St | Cma Development Inc | interior remodel of the lower unit, including remodel of staircase from level 1 to level 2.Details
interior remodel of the lower unit, including remodel of staircase from level 1 to level 2. | $5,000 |
| Sep 23, 2025 | In progress issued Sep 2025 | 70 Saint Marys Av | Mcmahon Construction | revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway.Details
revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway. | $10,000 |
| Sep 18, 2025 | In progress issued Oct 2025 | 593 Waller St | Neu Haus | revision to 202409170930. change in elevator shaft design. unit 591 - remodel 2 bathroom in kind at 3rd fl, add sauna to 4th fl saunaDetails
revision to 202409170930. change in elevator shaft design. unit 591 - remodel 2 bathroom in kind at 3rd fl, add sauna to 4th fl sauna | $20,000 |
| Sep 4, 2025 | In progress issued Apr 2026 | 3325 Fillmore St | Trainor Commercial Construction Inc. | core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled.Details
core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled. | $400,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 77 Rico Wy | Mission Home Remodeling Inc | 1st fl: remove storage, stairs, portion of ex garage, bedroom closet & hall bathroom, exercise room hall & closet: create new hall, laundry & closet, bathroom, wic & family room. remove ex rooom: create (n) bathroom. provide (n) 100 amp subpanel. 2nd fl: remove br, hall, kitchen, laundry, stairsDetails
1st fl: remove storage, stairs, portion of ex garage, bedroom closet & hall bathroom, exercise room hall & closet: create new hall, laundry & closet, bathroom, wic & family room. remove ex rooom: create (n) bathroom. provide (n) 100 amp subpanel. 2nd fl: remove br, hall, kitchen, laundry, stairs | $250,000 |
| Aug 13, 2025 | Completed final sign-off Jul 2026 | 1408 Noe St | Houseworks Enterprises Inc. | enclose existing 2nd fl balcony servicing 2 bedrooms, with the intentions to enlarge area of those bdrms by 57sf. enclosure will have 2 bump outs to comply with the sf planning guidelines and egress window per each bedroom. the wood picket guardrails on 2 flrs above will be replaced w new metalDetails
enclose existing 2nd fl balcony servicing 2 bedrooms, with the intentions to enlarge area of those bdrms by 57sf. enclosure will have 2 bump outs to comply with the sf planning guidelines and egress window per each bedroom. the wood picket guardrails on 2 flrs above will be replaced w new metal | $35,000 |
| Aug 13, 2025 | Completed final sign-off Apr 2026 | 1335 Filbert St | Iy Development & Renovation Inc | unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.cDetails
unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.c | $50,000 |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 1527 Sanchez St | Edri Construction Inc *See Notes* | replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location.Details
replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location. | $60,000 |
| Jul 30, 2025 | In progress issued Nov 2025 | 1450 42nd Av | Nbs General Contractor Inc | convert non hab space to habitable. remove & modify (e) structure posts. add new bathrooms, rebuild (e) non conforming stair. add new patio to rear yardDetails
convert non hab space to habitable. remove & modify (e) structure posts. add new bathrooms, rebuild (e) non conforming stair. add new patio to rear yard | $200,000 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | Upkeep Industries Inc | revision to 202506209119: build back front stairs according to plans, stair will be built in kind of originalDetails
revision to 202506209119: build back front stairs according to plans, stair will be built in kind of original | $39,000 |
| Jul 7, 2025 | In progress issued Jul 2025 | 1727 Page St | Connemara Fine Trim Inc Dba Highland Bui | remove "w" roof & replace w/ flat roof to support solar (separat permit). expand e) kitchen at 2nd/f. add wall to create bedroom from e) den at 2nd/f. support for e) bay windowDetails
remove "w" roof & replace w/ flat roof to support solar (separat permit). expand e) kitchen at 2nd/f. add wall to create bedroom from e) den at 2nd/f. support for e) bay window | $300,000 |
| Jun 25, 2025 | Completed final sign-off Jan 2026 | 370 Maynard St | Edri Construction Inc *See Notes* | demolition of a section of the existing foundation, build of the appropriate section of a new foundation. build new framing to replace old framing according to the plan. install new electrical outlets.Details
demolition of a section of the existing foundation, build of the appropriate section of a new foundation. build new framing to replace old framing according to the plan. install new electrical outlets. | $131,000 |
| Jun 25, 2025 | In progress issued Jun 2025 | 160 Avila St | Mission Home Remodeling Inc | 1st fl: remove (e) posts. provide new strong wall (ssd). 2nd fl: replace windows like for like. remove & closed window in master bedroom. remove & close kitchen window. new window in kitchen/ replace ceiling joist in master bedroomDetails
1st fl: remove (e) posts. provide new strong wall (ssd). 2nd fl: replace windows like for like. remove & closed window in master bedroom. remove & close kitchen window. new window in kitchen/ replace ceiling joist in master bedroom | $10,000 |
| Jun 13, 2025 | Completed final sign-off Nov 2025 | 738 Joost Av | Houseworks Enterprises Inc. | rebuild wood deck & wood stairs in rear yard. same size as e), raise deck +/- 7". add 1-hr rated deck gaurdwalls @ side property lines where shown on plansDetails
rebuild wood deck & wood stairs in rear yard. same size as e), raise deck +/- 7". add 1-hr rated deck gaurdwalls @ side property lines where shown on plans | $25,000 |
| Jun 13, 2025 | Completed final sign-off Sep 2025 | 127 27th St | Mission Home Remodeling Inc | remove existing living room wall between kitchen. remodel existing bathroom under permit 202503283295, pp20250328363, e 202503281275Details
remove existing living room wall between kitchen. remodel existing bathroom under permit 202503283295, pp20250328363, e 202503281275 | $10,000 |
| May 15, 2025 | In progress issued Nov 2025 | 8027 Geary Bl | Bluefield Construction | addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. removeDetails
addition & remodel of (e) 2 unit: partial infill of lightwell @ 3rd floor. partial reconfiguring of habitable space at basement & 1st floor. reconfigure basement circulation. remodel throughought include new structure, framing, fixtures & finishes. remove (e) exterior 2nd floor stair @ rear. remove | $350,000 |
| Apr 10, 2025 | Completed final sign-off Apr 2026 | 1544 Cole St | Edri Construction Inc *See Notes* | kitchen remodel with plans - removing a wallDetails
kitchen remodel with plans - removing a wall | $70,000 |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space.Details
revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space. | $15,000 |
| Feb 26, 2025 | Expired or cancelled expired Jun 2026 | 1967 09th Av | Mission Home Remodeling Inc | revision to 202406063844, foundation and underpinning section of retaining wall replacement.Details
revision to 202406063844, foundation and underpinning section of retaining wall replacement. | |
| Feb 20, 2025 | Completed final sign-off Aug 2025 | 666 Rockdale Dr | Houseworks Enterprises Inc. | remodeling/expanision of the kitchen in the (e) location. adjacent interior walls to be removed/opened up. addition of (n) skylight. (e) kitchen window, not facing street, to be replaced in kind. no change to building envelope or square footage.Details
remodeling/expanision of the kitchen in the (e) location. adjacent interior walls to be removed/opened up. addition of (n) skylight. (e) kitchen window, not facing street, to be replaced in kind. no change to building envelope or square footage. | $75,000 |
| Feb 13, 2025 | In progress issued Oct 2025 | 7 07th Av | Assembly Builders Inc. | lower garage floor. new retaining walls sistered to existing walls. widen garage door. adjust driveway scope. no work at upper levels.Details
lower garage floor. new retaining walls sistered to existing walls. widen garage door. adjust driveway scope. no work at upper levels. | $100,000 |
| Feb 11, 2025 | Completed final sign-off Jun 2026 | 900 Plymouth Av | Spiers & Sons Inc | erect a type vb, one story, detached adu building with one bedroom, one bathroom.Details
erect a type vb, one story, detached adu building with one bedroom, one bathroom. | $73,723 |
| Feb 11, 2025 | In progress filed Feb 2025, not yet issued | 1275 08th Av | rehab fire damaged 24-units residential building & address abataement #202311915a. get final approval for 4-adus approved- ref pa# 201717131829 & 201806050977. replace & relocate electrical power distribution throughout; (n)pg&e connection. replace all finishes, fixtures & appliances. (e)heating...Details
rehab fire damaged 24-units residential building & address abataement #202311915a. get final approval for 4-adus approved- ref pa# 201717131829 & 201806050977. replace & relocate electrical power distribution throughout; (n)pg&e connection. replace all finishes, fixtures & appliances. (e)heating... | $4,281,550 | |
| Feb 7, 2025 | In progress issued Mar 2025 | 223 Richland Av | Sky Trust Builder | revision to pa #202401123864. interior structural improvements at existing roof framing. no work at building exteriors.Details
revision to pa #202401123864. interior structural improvements at existing roof framing. no work at building exteriors. | $15,000 |
| Jan 29, 2025 | Completed final sign-off Dec 2025 | 3339 22nd St | Mission Home Remodeling Inc | remodel (e) kitchen. new skylight. convert 2 bedrooms into one primary suite with full bathroom and closet. new gas fire place direct vent. create (n) laundry closet in (e) kitchen space. new window in bathroomDetails
remodel (e) kitchen. new skylight. convert 2 bedrooms into one primary suite with full bathroom and closet. new gas fire place direct vent. create (n) laundry closet in (e) kitchen space. new window in bathroom | $85,000 |
| Jan 23, 2025 | Completed final sign-off Jul 2026 | 2948 Bush St | Bryce C B Construction Inc | revision to approved pa# 2023-1026-9591. replacement of rear spiral staircase with a deck and straight flight of stairs to the backyard. changes to windows & door schedules.Details
revision to approved pa# 2023-1026-9591. replacement of rear spiral staircase with a deck and straight flight of stairs to the backyard. changes to windows & door schedules. | |
| Jan 16, 2025 | Completed final sign-off Jun 2025 | 40 Reuel Ct | Upkeep Industries Inc | replace the existing deteriorated walkway framing and the infill of vertical elements of the existing steel guardrail. add mesh on railings. replace back decking on unit #2b.Details
replace the existing deteriorated walkway framing and the infill of vertical elements of the existing steel guardrail. add mesh on railings. replace back decking on unit #2b. | $20,000 |
| Nov 27, 2024 | In progress issued Sep 2025 | 591 Waller St | Neu Haus | addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion.Details
addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion. | $200,000 |
| Nov 20, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880Details
voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880 | $20,000 |
| Oct 21, 2024 | In progress filed Oct 2024, not yet issued | 326 Lexington St | Houseworks Enterprises Inc. | field revisions to permit 202308285370. new non-structural interior modification, and new structural blocking.Details
field revisions to permit 202308285370. new non-structural interior modification, and new structural blocking. | $40,000 |
| Oct 5, 2024 | In progress filed Oct 2024, not yet issued | 150 Saint Germain Av | interior addition & remodel to (e) single family dwelling: excavate (e) crawl space below (e) basement & convert to habitable space, to include (n) music room, (n) sitting room, (n) gym, (n) bathroom & (n) staircase -(n) exterior openings & patio - (e) basemnt level to become (n) 1st floorDetails
interior addition & remodel to (e) single family dwelling: excavate (e) crawl space below (e) basement & convert to habitable space, to include (n) music room, (n) sitting room, (n) gym, (n) bathroom & (n) staircase -(n) exterior openings & patio - (e) basemnt level to become (n) 1st floor | $286,952 | |
| Sep 25, 2024 | In progress issued Jun 2025 | 70 St Marys Av | Mcmahon Construction | ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units.Details
ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units. | $250,000 |
| Jul 19, 2024 | In progress issued Sep 2024 | 55 Lundys Ln | 7x7 Construction | excavate non hab basement/convert to new hab space.reconfig e 1st fl. new kitchen, poweder room, interior stair, sercies,fixtures, finishes through.new ex glasing in new modified openings. n skylights,fire rated parapet walls,repair or add new retaining walls,step at yards.Details
excavate non hab basement/convert to new hab space.reconfig e 1st fl. new kitchen, poweder room, interior stair, sercies,fixtures, finishes through.new ex glasing in new modified openings. n skylights,fire rated parapet walls,repair or add new retaining walls,step at yards. | $432,029 |
| Jul 18, 2024 | Completed final sign-off Apr 2025 | 457 Fulton St | Mission Home Remodeling Inc | bathroom remodel, interior work only at 3rd fl. no structural element impactedDetails
bathroom remodel, interior work only at 3rd fl. no structural element impacted | $41,000 |
| Jun 25, 2024 | In progress issued Sep 2024 | 55 Lundys Ln | 7x7 Construction | e detached garage structure. replace foundation and slab to e detached garage structure, patch repair e framing finishDetails
e detached garage structure. replace foundation and slab to e detached garage structure, patch repair e framing finish | $31,706 |
| Jun 6, 2024 | Completed final sign-off Jun 2026 | 1967 09th Av | Mission Home Remodeling Inc | interior remodel: reconfigure garage (1st fl) convert portition of garage into a (n) bedroom, media room, bathroom, closet, vestibule area, storage. replace (e) stairs. 2nd fl: turn storage into laundry area reconfigure closet & bathroom. create new closetDetails
interior remodel: reconfigure garage (1st fl) convert portition of garage into a (n) bedroom, media room, bathroom, closet, vestibule area, storage. replace (e) stairs. 2nd fl: turn storage into laundry area reconfigure closet & bathroom. create new closet | $200,000 |
| May 13, 2024 | Completed final sign-off Jul 2025 | 328 Monticello St | revision to 201904127899: reduce area of roof deck previously approved under 20190412899. no other work.Details
revision to 201904127899: reduce area of roof deck previously approved under 20190412899. no other work. | ||
| May 10, 2024 | In progress issued Oct 2024 | 1883 Funston Av | Mission Home Remodeling Inc | alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard.Details
alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard. | $100,000 |
| May 8, 2024 | Completed final sign-off Jul 2025 | 20 Eagle St | Y W Builders Inc. | interior remodel of extg single family home with attached garage at 20 eagle street. no change to extg height. no square footage added, no change to extg curb cut. reconfiguration of interior stair & lvl 2 bedroom, nw powder rm on lvl1. nw inset entry door. nw electric garage door,Details
interior remodel of extg single family home with attached garage at 20 eagle street. no change to extg height. no square footage added, no change to extg curb cut. reconfiguration of interior stair & lvl 2 bedroom, nw powder rm on lvl1. nw inset entry door. nw electric garage door, | $200,000 |
| Mar 27, 2024 | Completed final sign-off Jul 2024 | 380 Christopher Dr | Chl Construction Company | structural revision to 202307071659 roof beam & load beam revised locationDetails
structural revision to 202307071659 roof beam & load beam revised location | $3,000 |
| Mar 19, 2024 | Completed final sign-off Feb 2025 | 882 29th Av | Mission Home Remodeling Inc | add new bathroom, replace wetbar like to like. new laundry area. replace roofing in lightwell. repair garage slab and underpin two locationsDetails
add new bathroom, replace wetbar like to like. new laundry area. replace roofing in lightwell. repair garage slab and underpin two locations | $70,000 |
| Feb 23, 2024 | In progress issued Mar 2024 | 38 Belcher St | Mission Home Remodeling Inc | remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deckDetails
remove some portion of existing ceiling; provide new stairs and under stairs storage; remove some portion of existing roof create new roof hatch and roof deck | $100,000 |
| Jan 12, 2024 | In progress issued Jul 2024 | 223 Richland Av | Sky Trust Builder | structural improvements, new interior stair, interior alterationsDetails
structural improvements, new interior stair, interior alterations | $70,000 |
| Jan 11, 2024 | In progress issued Feb 2024 | 2640 Green St | Mavericks Builder | new paint at all exterior elevations, trim and windows. new copper gutters, rwl and scupper.Details
new paint at all exterior elevations, trim and windows. new copper gutters, rwl and scupper. | $75,000 |
| Dec 11, 2023 | Expired or cancelled expired Jul 2026 | 1762 11th Av | revision to bpa# 202209152555: structural only. new foundation slab, footings, details.Details
revision to bpa# 202209152555: structural only. new foundation slab, footings, details. | $20,000 | |
| Nov 16, 2023 | Completed final sign-off Jun 2024 | 122 Tucker Av | Ahumada General Contractor | at rear yard, new deck & stairs.Details
at rear yard, new deck & stairs. | $15,000 |
| Oct 26, 2023 | Completed final sign-off Jul 2026 | 2948 Bush St | Bryce C B Construction Inc | remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand..Details
remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand.. | $777,663 |
| Oct 24, 2023 | Completed final sign-off Apr 2025 | 1042 Pacheco St | new 1st & 2nd floor decks at rear of existing single family dwelling; interior alterations at 1st floor, adding bathroom & bedroom - no new dwelling unit.Details
new 1st & 2nd floor decks at rear of existing single family dwelling; interior alterations at 1st floor, adding bathroom & bedroom - no new dwelling unit. | $60,000 | |
| Aug 22, 2023 | Completed final sign-off May 2025 | 1905 Union St | to comply with nov 202286294 & 202286803. existing roof deck expansion. comply with 2022-000732enf (newly construction deck exceeds that allowed under pa 202201206346 & 201404163371).Details
to comply with nov 202286294 & 202286803. existing roof deck expansion. comply with 2022-000732enf (newly construction deck exceeds that allowed under pa 202201206346 & 201404163371). | $12,000 | |
| Aug 22, 2023 | Never finaled issued Aug 2023, no final | 367 21st Av | replace existing bathroom like for like. new skylight.Details
replace existing bathroom like for like. new skylight. | $20,000 | |
| Aug 10, 2023 | Completed final sign-off May 2024 | 471 14th Av | Citidev Inc. | revision to pa202201286902. replace previously permitted exterior steel stair and landing with wood stair & landing. relocate exterior door and window to suit-modifications to previously permited structual specifications. no other work.Details
revision to pa202201286902. replace previously permitted exterior steel stair and landing with wood stair & landing. relocate exterior door and window to suit-modifications to previously permited structual specifications. no other work. | $1,000 |
| Aug 7, 2023 | Completed final sign-off Jan 2024 | 466 Haight St | revision to pa202308013460. substitute 3/4" threaded rods for pre-bent rods. install in horizontal configuration.Details
revision to pa202308013460. substitute 3/4" threaded rods for pre-bent rods. install in horizontal configuration. | ||
| Aug 2, 2023 | Completed final sign-off Oct 2023 | 20 Reuel Ct | Upkeep Industries Inc | install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails.Details
install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails. | $20,000 |
| Aug 2, 2023 | Completed final sign-off Nov 2023 | 30 Reuel Ct | Upkeep Industries Inc | install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails.Details
install new beams, replace all damaged/ deteriorated walkway framing with new exterior-rated framing to match or exceed size and grade of existing member, replace steel angles and thru bolts in-kind, install mesh guard on vertical elements in guardrails. | $20,000 |
| Aug 1, 2023 | Completed final sign-off Jan 2024 | 466 Haight St | voluntary structural strengthening to tie down the floor diaphragm and provide additional shear and uplift between the structure and its foundationDetails
voluntary structural strengthening to tie down the floor diaphragm and provide additional shear and uplift between the structure and its foundation | $20,000 | |
| Jul 21, 2023 | Completed final sign-off Feb 2024 | 457 Fulton St | Mission Home Remodeling Inc | g/f: bathroom remodel with structural alteration.Details
g/f: bathroom remodel with structural alteration. | $44,000 |
| Jun 16, 2023 | In progress issued Mar 2026 | 2309 Broderick St | remodel two unit bldg.rebuild rotting rear two-story portion of bldg in the same footprint.(n) rear exterior stair to replace(e).add two car garage,finish rear of 1st fl to add media room,bath & laundry.excavate @ rear under rebuilt portion to add(n) bedroom.Details
remodel two unit bldg.rebuild rotting rear two-story portion of bldg in the same footprint.(n) rear exterior stair to replace(e).add two car garage,finish rear of 1st fl to add media room,bath & laundry.excavate @ rear under rebuilt portion to add(n) bedroom. | $600,000 | |
| May 16, 2023 | Completed final sign-off Nov 2025 | 79 Melrose Av | O Donoghue Construction Inc. | new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unitDetails
new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unit | $117,100 |
| Mar 29, 2023 | Never finaled issued Apr 2023, no final | 639 34th Av | Duffin Construction | revision to pa 2021-0914-8427 (s1) sheet s2.1 and s3.4 to change perimeter foundtion to to retaining wall foundationDetails
revision to pa 2021-0914-8427 (s1) sheet s2.1 and s3.4 to change perimeter foundtion to to retaining wall foundation | $10,000 |
| Feb 21, 2023 | Completed final sign-off Jan 2026 | 1805 Geary Bl | Swinerton Builders | voluntary replacement of (e) rear fire stair #2, (n) ada lula elevator from 2nd to 3rd fl, repl concrete pad of side alley service lift.Details
voluntary replacement of (e) rear fire stair #2, (n) ada lula elevator from 2nd to 3rd fl, repl concrete pad of side alley service lift. | $176,000 |
| Feb 10, 2023 | Expired or cancelled expired Jan 2026 | 1805 Geary Bl | Swinerton Builders | voluntary replacement of (e) front fire stair in-kind and replace alleyway gate.Details
voluntary replacement of (e) front fire stair in-kind and replace alleyway gate. | $64,000 |
| Jan 27, 2023 | Expired or cancelled withdrawn Jul 2025 | 23 Mirabel Av | Boaz Mor Design & Construction | deck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story.Details
deck changes reducing size of 3rd story deck. widening 2nd story deck. removal of existing stair case between 2nd & 3rd story. adding spiral staircase between 2nd & 3rd story. | $30,000 |
| Dec 27, 2022 | Never finaled issued Mar 2023, no final | 920 Sanchez St | Ryan Construction | exterior work: replace and reconfigure (e) rear deck and staircase and (e) garage level windows. 1/f garage level: new bedroom, bath, closets and laundry in (e) garage space. 2/f: replace (e) rear window with door.Details
exterior work: replace and reconfigure (e) rear deck and staircase and (e) garage level windows. 1/f garage level: new bedroom, bath, closets and laundry in (e) garage space. 2/f: replace (e) rear window with door. | $175,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2025 | 323 25th Av | Mission Home Remodeling Inc | kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f.Details
kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f. | $100,000 |
| Dec 2, 2022 | Never finaled issued Mar 2023, no final | 804 22nd St | De Jong Construction | revision to permit 201808137232-s1 to eliminate western prop. line wall at 1/f passage area. revisions to structural compnents at 1/f commercial space, 2/f rear openings, 3/f front openings.Details
revision to permit 201808137232-s1 to eliminate western prop. line wall at 1/f passage area. revisions to structural compnents at 1/f commercial space, 2/f rear openings, 3/f front openings. | |
| Nov 17, 2022 | Completed final sign-off Aug 2024 | 257 Pacheco St | Quinlan Construction | revision to permit 202206025481 to elevate concrete foundation wall above grade at rear of property.minor framing changesDetails
revision to permit 202206025481 to elevate concrete foundation wall above grade at rear of property.minor framing changes | $10,000 |
| Nov 15, 2022 | Completed final sign-off Mar 2025 | 1378 York St | Fulcrum Point Construction | new windows to replace (e) at rear bedrooms at 1st & 2nd fl. new roof skylights with 1 hr fr parapet. replace siding at rear. new trellis and garden structure. reconfigure interior stair. reconfigure primary bedroom suite, laundry to replace (e) at 1st fl. new pwder room at 1st fl.Details
new windows to replace (e) at rear bedrooms at 1st & 2nd fl. new roof skylights with 1 hr fr parapet. replace siding at rear. new trellis and garden structure. reconfigure interior stair. reconfigure primary bedroom suite, laundry to replace (e) at 1st fl. new pwder room at 1st fl. | $175,000 |
| Oct 18, 2022 | Expired or cancelled withdrawn Mar 2023 | 17 Chula Ln | detached garage: convert to adu. 1 story vertical addition with one bedroom and bathroom.Details
detached garage: convert to adu. 1 story vertical addition with one bedroom and bathroom. | $500,000 | |
| Oct 18, 2022 | Expired or cancelled withdrawn Mar 2023 | 17 Chula Ln | main house: renovation of (e) home with no change to (e) footprint or height.Details
main house: renovation of (e) home with no change to (e) footprint or height. | $500,000 | |
| Sep 28, 2022 | Never finaled filed Sep 2022, never issued | 1213 Scott St | Krueger Bros Builders Inc. | new addition: kitchen remodel,new cabinetry,fixtures,electrical,windows,doors b.new stairs from kitchen to basement excavate & build (n)332 sf conditioned spaced for office,laundry & storage.build two story addition,adding 140 sq ft on each fl with (n)stairs.build a new 315 sf roof deckDetails
new addition: kitchen remodel,new cabinetry,fixtures,electrical,windows,doors b.new stairs from kitchen to basement excavate & build (n)332 sf conditioned spaced for office,laundry & storage.build two story addition,adding 140 sq ft on each fl with (n)stairs.build a new 315 sf roof deck | $215,000 |
| Aug 11, 2022 | Expired or cancelled expired Nov 2024 | 2566 Pine St | Terence Mcmahon Construction | (unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep.Details
(unit #1 & #4) unit #1: demo & relocate (e) stair from kitchen to rear patio. kitchen remodel include windows, electrical, mech & plumbing per plans. unit #4: raise ceiling 18". bath & bedroom remodel including partitions & mep. | $85,000 |
| Jul 28, 2022 | In progress issued Mar 2024 | 1422 Douglass St | Nima Construction | horizontal addition @ front both floors. horizontal addition @ rear @ 1st floor. interior reconfiguration throughout. (e) 2nd floor plate to be raised approx 22". new finish, windows & doors throuthout with a new gable roof form matching (e) roof slope. fully automatic sprinkler system throuthout.Details
horizontal addition @ front both floors. horizontal addition @ rear @ 1st floor. interior reconfiguration throughout. (e) 2nd floor plate to be raised approx 22". new finish, windows & doors throuthout with a new gable roof form matching (e) roof slope. fully automatic sprinkler system throuthout. | $450,000 |
| Jan 13, 2021 | Never finaled issued May 2022, no final | 1883 Funston Av | new in-fill addition under the cantilevered 1st floor. extend living / dining room out 4' to the rear. remodel kitchen & family room. add bath in basement. new connecting stair to lower basement & access to new rear yard deck. new windows @ rear. no change to front facade.Details
new in-fill addition under the cantilevered 1st floor. extend living / dining room out 4' to the rear. remodel kitchen & family room. add bath in basement. new connecting stair to lower basement & access to new rear yard deck. new windows @ rear. no change to front facade. | $150,000 | |
| Sep 28, 2020 | Never finaled issued Sep 2022, no final | 134 Alpine Tr | vertical addition to (e) single-family dwelling. addition to include (n) stair to (n) caretaker's bedroom, (n) bath, (n) living room, & (n) roof deck.Details
vertical addition to (e) single-family dwelling. addition to include (n) stair to (n) caretaker's bedroom, (n) bath, (n) living room, & (n) roof deck. | $400,000 | |
| Sep 6, 2019 | Expired or cancelled expired Feb 2026 | 428 27th St | Cronin Construction & Development Inc. | legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite.Details
legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite. | $250,000 |