Jason Chan
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Jason M.J.Chan Architect
- Based in
- Millbrae
- On San Francisco permits
- May 2000 to Sep 2026
446 permits since 2000 (architect on 422 permits, engineer on 12 permits, designer on 7 permits, authorized agent-others on 5 permits): 290 completed, 44 in progress, 47 never finaled, 65 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 446.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 1701 Polk St | change of occupancy from m to b. remodel existing tenant space to be a drink shop. modify existing electrical, mechanical and plumbing systems per bldg, and health department requirements.Details
change of occupancy from m to b. remodel existing tenant space to be a drink shop. modify existing electrical, mechanical and plumbing systems per bldg, and health department requirements. | $120,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1370 20th Av | 1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar.Details
1.) add a spiral stair to connect 1st floor and 2nd floor living space. 2.) convert (e) laundry/ storage room to a media room with a (n) wet bar. | $30,000 | |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 944 Greenwich St | erect type vb 2-story 2 adu structure in rear yard.Details
erect type vb 2-story 2 adu structure in rear yard. | $600,000 | |
| Sep 14, 2026 | In progress issued Sep 2026 | 5828 California St | Yiu Cheong Construction Co Inc | minor revision to 202502200739, change to entry doors for 2nd fl unit 1 and 3rd floor unit 2. minor revision to skylights for 3rd fl unit 2.Details
minor revision to 202502200739, change to entry doors for 2nd fl unit 1 and 3rd floor unit 2. minor revision to skylights for 3rd fl unit 2. | $5,000 |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 2058 34th Av | interior remodel: 1st floor, add a bedroom, a family room with wetbar, a full bathroom, a laundry room, remodel foyer. 2nd floor: remodel bathroom, kitchen, add a full bathroom, convert bedroom to a media room. subject to ab112.Details
interior remodel: 1st floor, add a bedroom, a family room with wetbar, a full bathroom, a laundry room, remodel foyer. 2nd floor: remodel bathroom, kitchen, add a full bathroom, convert bedroom to a media room. subject to ab112. | $200,000 | |
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 810 Vallejo St | g/f: convert (e) storage space into two (2) adu units per calstate program.Details
g/f: convert (e) storage space into two (2) adu units per calstate program. | $250,000 | |
| Aug 23, 2026 | In progress filed Aug 2026, not yet issued | 83 Lisbon St | front building. to comply with n.o.v. #202289263. in 1st floor of unit# 1 (front building) add a new adu per state program.Details
front building. to comply with n.o.v. #202289263. in 1st floor of unit# 1 (front building) add a new adu per state program. | $125,000 | |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 718 37th Av | interior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112Details
interior remodel: 1st floor: remodel (e) bedrooms, family room, and bathroom, add a powder room, replace (e) garage door with (n) garage door. 2nd floor: remodel (e) bathroom, kitchen, living and dining room, add a full bathroom, replace living room window. subject to ab112 | $250,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 1871 45th Av | J & A Construction | rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath.Details
rear horizontal addition and interior remodel. 1st fl. add a guest room, a full bathroom, a family room with wet bar. 2nd fl. remodel (e) bedrooms, kitchen bathroom. add a bath. | $280,000 |
| Aug 3, 2026 | In progress filed Aug 2026, not yet issued | 1443 30th Av | interior remodel. 1st fl remodel of e family room and bathroom and bedroom, replace garage goor, same size. 2nd fl remodel e kitchen, bathroom, add a full bath, powder room. enclose south lightwell. upgrade e elec panel to 250 amp.Details
interior remodel. 1st fl remodel of e family room and bathroom and bedroom, replace garage goor, same size. 2nd fl remodel e kitchen, bathroom, add a full bath, powder room. enclose south lightwell. upgrade e elec panel to 250 amp. | $200,000 | |
| Jul 17, 2026 | In progress issued Jul 2026 | 5828 California St | Yiu Cheong Construction Co Inc | interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above.Details
interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above. | $70,000 |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 352 06th Av | in unit#: 2 (352 6th av) on 3rd flr: add an attic access stair to existing atic space. add skylight.Details
in unit#: 2 (352 6th av) on 3rd flr: add an attic access stair to existing atic space. add skylight. | $9,000 | |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 735 40th Av | rear horizontal addition to (e) 3-story duplex building. adding 2 bedrooms and a full bathroom to eachunit. remodel (e) kitchens.Details
rear horizontal addition to (e) 3-story duplex building. adding 2 bedrooms and a full bathroom to eachunit. remodel (e) kitchens. | $380,000 | |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 2542 Bryant St | unit 1-interior remodel for 2nd floor to include remodel bathrooms, bedrooms, and kitchen.Details
unit 1-interior remodel for 2nd floor to include remodel bathrooms, bedrooms, and kitchen. | $80,000 | |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 2880 Bush St | legalize existing rear yard rental cottage to adu per ord# 43-14.Details
legalize existing rear yard rental cottage to adu per ord# 43-14. | $25,000 | |
| Apr 17, 2026 | In progress issued Apr 2026 | 2542 Bryant St | Iy Development & Renovation Inc | unit 2- 3/fl- remodel and relocated bedroom, bathroom and kitchen . add (3) bathrooms and convert living room into bedroom. replace (e) windows in kind facing street.Details
unit 2- 3/fl- remodel and relocated bedroom, bathroom and kitchen . add (3) bathrooms and convert living room into bedroom. replace (e) windows in kind facing street. | $100,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 2542 Bryant St | Iy Development & Renovation Inc | unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deckDetails
unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deck | $150,000 |
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 2151 46th Av | Yiu Cheong Construction Co Inc | rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom.Details
rear addition and interior rmeodel: 1/f remodel (e) bedroom, family room, and bathroom. 2/f: remodel (e) bedroom add a bathroom. | $230,000 |
| Jan 28, 2026 | In progress filed Jan 2026, not yet issued | 3632 Sacramento St | interior remodel on 3rd floor: convert unit #1 office space back to a dwelling unit.Details
interior remodel on 3rd floor: convert unit #1 office space back to a dwelling unit. | $80,000 | |
| Jan 20, 2026 | Expired or cancelled cancelled Mar 2026 | 535 28th Av | Dliu Construction | repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof.Details
repair termite damaged bldg front fascia. replace (e) stucco with wood siding. replace (e) roof tile with composition shingle roof. | $20,000 |
| Jan 20, 2026 | Expired or cancelled withdrawn Apr 2026 | 100 Florentine Av | relocate existing front door. add a laundry closet.Details
relocate existing front door. add a laundry closet. | $8,000 | |
| Jan 15, 2026 | Completed final sign-off May 2026 | 814 41st Av | interior, ground floor remodel: change two, rear-yard facing rooms into sleeping rooms, construction of a 1-hour rated exit passageway, remodel of an existing bathroom, construction of a new bathroom, construction of a wet bar, construction of 1-hour rated wall between garage and habitable space.Details
interior, ground floor remodel: change two, rear-yard facing rooms into sleeping rooms, construction of a 1-hour rated exit passageway, remodel of an existing bathroom, construction of a new bathroom, construction of a wet bar, construction of 1-hour rated wall between garage and habitable space. | $110,000 | |
| Oct 16, 2025 | In progress filed Oct 2025, not yet issued | 1 Merced Av | interior remodel to add a guest bedroom, with seating area and full bathrooom. convert (e) closet to a wetbar on 1st floor.replacement 4 windows & comvert a window into a door.Details
interior remodel to add a guest bedroom, with seating area and full bathrooom. convert (e) closet to a wetbar on 1st floor.replacement 4 windows & comvert a window into a door. | $40,000 | |
| Sep 29, 2025 | In progress issued Sep 2026 | 95 Exeter St | 1st floor add unit per state adu program (government code 65852.2). 2nd floor & basement floor interior remodel. remove illegal deck. to comply with nov# 202425901 & 202426701.Details
1st floor add unit per state adu program (government code 65852.2). 2nd floor & basement floor interior remodel. remove illegal deck. to comply with nov# 202425901 & 202426701. | $400,000 | |
| Aug 26, 2025 | Completed final sign-off Jun 2026 | 127 Caselli Av | Iy Development & Renovation Inc | interior remodel on 1/f. remodel kitchen and toilet. replace 2 rear windows with french doors. relocate washer and dryer to basement. 2/f: remodel bathroom.Details
interior remodel on 1/f. remodel kitchen and toilet. replace 2 rear windows with french doors. relocate washer and dryer to basement. 2/f: remodel bathroom. | $50,000 |
| Aug 18, 2025 | In progress issued Sep 2025 | 324 Clement St | t.i. using of rear open space for dining, not to exceeding 49 occupancy.Details
t.i. using of rear open space for dining, not to exceeding 49 occupancy. | $8,500 | |
| Aug 13, 2025 | Completed final sign-off Apr 2026 | 1335 Filbert St | Iy Development & Renovation Inc | unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.cDetails
unit 106 on 1/f: remodel existing bathroom, kitchen, and closets.c | $50,000 |
| Aug 5, 2025 | In progress issued Dec 2025 | 350 06th Av | Dj New Century Construction Inc | interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen.Details
interior remodel: 1st fl-remodel (e) bedrooms, bathroom, add a wetbar for unit #1. 2nd fl unit #1- remodel bathrooms, bedrooms, relocate kitchen. 3rd fl unit #2- remodel bathrooms, bedrooms & relocate kitchen. | $200,000 |
| Aug 5, 2025 | In progress issued Nov 2025 | 318 Divisadero St | Shao Fat Construction Inc | remodel e vacant tenant space to a spa. change from laundrymat to massage service space.Details
remodel e vacant tenant space to a spa. change from laundrymat to massage service space. | $180,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 324 Clement St | West-Tech General Engineer And Builder | revision to 202405162315: replace e) 3 foot rear door with new alum/temp glass door. remodel rear yardDetails
revision to 202405162315: replace e) 3 foot rear door with new alum/temp glass door. remodel rear yard | $12,000 |
| Jul 17, 2025 | In progress issued Oct 2025 | 1927 33rd Av | Q & Qq Construction Inc | interior remodel & rear horizontal addition. and interior remodelDetails
interior remodel & rear horizontal addition. and interior remodel | $300,000 |
| Jul 17, 2025 | Completed final sign-off Aug 2025 | 419 42nd Av | Hong Shink Construction | revision to pa# 2024-0822-9257: bathroom fixtures, change steps in rear yard area.Details
revision to pa# 2024-0822-9257: bathroom fixtures, change steps in rear yard area. | $5,000 |
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 639 29th Av | Iy Development & Renovation Inc | interior remodel on 3/f. convert existing closet space to a laundry closet.Details
interior remodel on 3/f. convert existing closet space to a laundry closet. | $4,000 |
| Jul 3, 2025 | Completed final sign-off Jun 2026 | 318 Divisadero St | Chun Electrical Inc | barrier removal and repair existing roof, walls and footing with in kind.Details
barrier removal and repair existing roof, walls and footing with in kind. | $60,000 |
| Jun 30, 2025 | Completed final sign-off Aug 2025 | 1601 Balboa St | Hong Shink Construction | remodel (e) store entry door to comply with ada requirements and nov 202553788.Details
remodel (e) store entry door to comply with ada requirements and nov 202553788. | $8,000 |
| Jun 30, 2025 | In progress issued Jul 2025 | 2880 Bush St | Kong Lai Construction | revision to pa# 202504184788, minor adjustments of interrior walls on 1st floor.Details
revision to pa# 202504184788, minor adjustments of interrior walls on 1st floor. | $5,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 329 San Benito Wy | Chun Electrical Inc | 1/f: add a laundry room, remodel bathroom. 2/f: remodel kitchen and bathrooms. add a powder room. attic floor: add a guest room, a media room, and a bathroom, 3 dormersDetails
1/f: add a laundry room, remodel bathroom. 2/f: remodel kitchen and bathrooms. add a powder room. attic floor: add a guest room, a media room, and a bathroom, 3 dormers | $250,000 |
| Jun 18, 2025 | In progress filed Jun 2025, not yet issued | 2151 31st Av | rear horizontal addition and interior remodel. 1st fl: add a bedroom, extend family room, add a bathroom, relocate bathroom & remodel garage door. 2nd fl: add a master bedroom, with a (n) bathroom, remodel (e) bathroom and kitchenDetails
rear horizontal addition and interior remodel. 1st fl: add a bedroom, extend family room, add a bathroom, relocate bathroom & remodel garage door. 2nd fl: add a master bedroom, with a (n) bathroom, remodel (e) bathroom and kitchen | $250,000 | |
| Jun 2, 2025 | Completed final sign-off Sep 2025 | 4145 Ulloa St | Iy Development & Renovation Inc | to add a roof deck on top of existing roof.Details
to add a roof deck on top of existing roof. | $26,000 |
| Apr 18, 2025 | In progress issued Apr 2025 | 2880 Bush St | Kong Lai Construction, Claros Construction | interior remodel of all units, upgrade e) elect panels to 100 amp each. unit 2880: add a bedroom, rearrange bathroom & kitchen, unit 2882: add a bedroom, 2 barhrooms, remodel kitchen. unit 2884: add a bedroom & 2 bathrooms, remodel kitchen. no bldg envelope change. windows replacementDetails
interior remodel of all units, upgrade e) elect panels to 100 amp each. unit 2880: add a bedroom, rearrange bathroom & kitchen, unit 2882: add a bedroom, 2 barhrooms, remodel kitchen. unit 2884: add a bedroom & 2 bathrooms, remodel kitchen. no bldg envelope change. windows replacement | $35,000 |
| Apr 14, 2025 | In progress issued Jun 2025 | 154 Pixley St | Sky Trust Builder, Adler Builders Inc | interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom.Details
interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom. | $85,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 114 Saint Charles Av | Maximo Construction | interior remodel in 1st floor: add a bedroom and a bathroom.Details
interior remodel in 1st floor: add a bedroom and a bathroom. | $60,000 |
| Apr 4, 2025 | In progress issued Apr 2025 | 2880 Bush St | Kong Lai Construction, Claros Construction | replace (e) windows with (n) in kind repair minor termite damage walls, siding , roof, and floor joists, and repaint exterior walls.Details
replace (e) windows with (n) in kind repair minor termite damage walls, siding , roof, and floor joists, and repaint exterior walls. | $20,000 |
| Feb 13, 2025 | Completed final sign-off Apr 2026 | 2297 Mission St | Iy Development & Renovation Inc | unit#2299: remodel existing bar tenant space. upgrade exisiting toilet. modify exisiting electrical, mechanical, and plumbing system per health department requirement. all emp workds under seperated permitDetails
unit#2299: remodel existing bar tenant space. upgrade exisiting toilet. modify exisiting electrical, mechanical, and plumbing system per health department requirement. all emp workds under seperated permit | $15,000 |
| Feb 13, 2025 | Completed final sign-off Jul 2025 | 1727 40th Av | Wynn L Builders Inc. | add new recessed entry door.Details
add new recessed entry door. | $3,000 |
| Jan 31, 2025 | Completed final sign-off Jun 2025 | 5020 California St | All Bay Cities Construction | unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior workDetails
unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior work | $50,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 425 26th Av | Iy Development & Renovation Inc | unit 3: remodel existing powder room. add washer & dryerDetails
unit 3: remodel existing powder room. add washer & dryer | $8,000 |
| Nov 25, 2024 | Expired or cancelled expired Apr 2026 | 1517 Anza St | Inspired Builders Inc. | add a media and a bathroom on 1st floor.Details
add a media and a bathroom on 1st floor. | $50,000 |
| Nov 25, 2024 | Expired or cancelled expired Apr 2026 | 1515 Anza St | Inspired Builders Inc. | add a media room and bathroom on the 1st floorDetails
add a media room and bathroom on the 1st floor | $50,000 |
| Nov 21, 2024 | In progress issued Dec 2024 | 1514 06th Av | remodel existing kitchen on 2nd flr. remodel bathroom on 3rd flr and add a bathroom on 3rd flr.Details
remodel existing kitchen on 2nd flr. remodel bathroom on 3rd flr and add a bathroom on 3rd flr. | $70,000 | |
| Nov 20, 2024 | In progress filed Nov 2024, not yet issued | 901 16th St | ste 2140: t.i. to e) flower store: add some interior walls & shelvings no final inspection for this permit until completion of pa#: 2021-0111-2460.Details
ste 2140: t.i. to e) flower store: add some interior walls & shelvings no final inspection for this permit until completion of pa#: 2021-0111-2460. | $60,000 | |
| Nov 7, 2024 | Completed final sign-off May 2025 | 208 Thrift St | Luo's Construction Company **Check Id*** | lower level interior remodel to include converting unconditioned space to habitiable space for a (n) family room, 1 bedroom and 1 bathroom. replace 3 (e) windows in kind.Details
lower level interior remodel to include converting unconditioned space to habitiable space for a (n) family room, 1 bedroom and 1 bathroom. replace 3 (e) windows in kind. | $80,000 |
| Nov 7, 2024 | Completed final sign-off Dec 2025 | 1618 42nd Av | Zhizhao Liu Construction Co | interior remodel: on 1st flr: add a family room, a bathroom. on 2nd flr: remodel existing bathroom, add a bathroom.Details
interior remodel: on 1st flr: add a family room, a bathroom. on 2nd flr: remodel existing bathroom, add a bathroom. | $80,000 |
| Sep 24, 2024 | Completed final sign-off Sep 2025 | 419 42nd Av | Hong Shink Construction | rear addition and interior remodelDetails
rear addition and interior remodel | $200,000 |
| Sep 19, 2024 | Completed final sign-off Apr 2025 | 2601 Lincoln Wy | Hong Shink Construction | house remodel - interior remodel. replace existing window in-kind. add windows to match existing.Details
house remodel - interior remodel. replace existing window in-kind. add windows to match existing. | $200,000 |
| Aug 30, 2024 | Completed final sign-off Jun 2025 | 115 Otsego Av | Valex Construction | 1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder roomDetails
1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder room | $80,000 |
| Aug 22, 2024 | Completed final sign-off Dec 2025 | 1539 39th Av | F C Company | 1/f: interior remodel - add a bedroom, a media room, relocate bathroom and family room.Details
1/f: interior remodel - add a bedroom, a media room, relocate bathroom and family room. | $80,000 |
| Aug 15, 2024 | Expired or cancelled expired Mar 2026 | 2176 16th Av | Newsontec General | revision to permit 202406144502. 1/f: relocate concrete steps in rear yard. 2/f: remodel (e) kitchen. replace bathtub with shower in bathroom. replace front windows in-kind.Details
revision to permit 202406144502. 1/f: relocate concrete steps in rear yard. 2/f: remodel (e) kitchen. replace bathtub with shower in bathroom. replace front windows in-kind. | $50,000 |
| Aug 14, 2024 | In progress issued Oct 2024 | 829 Broderick St | 7x Construction | remodel existing kitchens in kins in unit 1,3,and 5. add washer dryer for units 1 and 2 and common area on 3rd and 4th fl.Details
remodel existing kitchens in kins in unit 1,3,and 5. add washer dryer for units 1 and 2 and common area on 3rd and 4th fl. | $70,000 |
| Aug 8, 2024 | Completed final sign-off Nov 2024 | 1259 40th Av | Shek's Construction Co | to comply with nov # 202419021 add a rear deck, reinstall landscape area in front yard per approved permit 201703282612Details
to comply with nov # 202419021 add a rear deck, reinstall landscape area in front yard per approved permit 201703282612 | $9,000 |
| Aug 5, 2024 | Completed final sign-off Jul 2025 | 1727 40th Av | Zhongwei Construction | 1st fl: add a bedroom, family room, bathroom & wetbar. 2nd fl: add a rear deckDetails
1st fl: add a bedroom, family room, bathroom & wetbar. 2nd fl: add a rear deck | $70,000 |
| Aug 5, 2024 | Completed final sign-off Apr 2025 | 114 Saint Charles Av | Maximo Construction | interior remodel on 2nd fl; remodel kitchen and refurbish bathroomDetails
interior remodel on 2nd fl; remodel kitchen and refurbish bathroom | $40,000 |
| Aug 1, 2024 | Completed final sign-off Jan 2025 | 1885 Bay Shore Bl | Kelun Construction | 2/f - unit 2: to comply with nov 200670974. to remove non-permit rear deck and patio doors. reinstall 2 windows and patch wll to match existing. reinstall wall finishes at bathroom, kitchen, living, hall, bedroom and appliances in kitchen.Details
2/f - unit 2: to comply with nov 200670974. to remove non-permit rear deck and patio doors. reinstall 2 windows and patch wll to match existing. reinstall wall finishes at bathroom, kitchen, living, hall, bedroom and appliances in kitchen. | $12,000 |
| Jul 29, 2024 | Expired or cancelled withdrawn May 2025 | 608 Taraval St | revision to 202210275318 establish ages for the classrooms (change bldg use from e to i-4) ages 0-3 years old. delect door btw entry & daycare area on 1st flDetails
revision to 202210275318 establish ages for the classrooms (change bldg use from e to i-4) ages 0-3 years old. delect door btw entry & daycare area on 1st fl | ||
| Jul 23, 2024 | Completed final sign-off Apr 2025 | 322 Flood Av | to comply with nov# 202423404, convert bedroom to media room, relocate bathrooms, powder room, laundry and closets, replace front windows in-kind, repair front wall and guardrail from termite damage in-kind, add bbq sink/counter in backyard.Details
to comply with nov# 202423404, convert bedroom to media room, relocate bathrooms, powder room, laundry and closets, replace front windows in-kind, repair front wall and guardrail from termite damage in-kind, add bbq sink/counter in backyard. | $50,000 | |
| Jul 1, 2024 | In progress issued Sep 2024 | 31 Landers St | revision of approved permit pa#202405222728. in 1st floor change laundry/storage space to have a family room with wetbar, exercise area for unit #2 above.Details
revision of approved permit pa#202405222728. in 1st floor change laundry/storage space to have a family room with wetbar, exercise area for unit #2 above. | $30,000 | |
| Jun 28, 2024 | In progress filed Jun 2024, not yet issued | 420 Buchanan St | interior remodel: add two bedrooms, a study room, a full bathroom in 1st floor.Details
interior remodel: add two bedrooms, a study room, a full bathroom in 1st floor. | $120,000 | |
| Jun 25, 2024 | In progress issued Jul 2024 | 608 Taraval St | Global Standard Construction Inc | remodel (e) rear stairDetails
remodel (e) rear stair | $8,000 |
| Jun 20, 2024 | Expired or cancelled expired Nov 2025 | 341 Hugo St | Huff Construction Company Inc | revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom.Details
revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom. | $30,000 |
| Jun 14, 2024 | Completed final sign-off Mar 2026 | 2176 16th Av | Newsontec General | interior remodel: 1st floor to add 2 bedrooms, an exercise room, a bathroom. 2nd floor:remodel existing bedroom and bathroom.Details
interior remodel: 1st floor to add 2 bedrooms, an exercise room, a bathroom. 2nd floor:remodel existing bedroom and bathroom. | $90,000 |
| May 31, 2024 | Completed final sign-off Apr 2025 | 314 Utah St | Huey Construction Inc | rev to pa# 2024-0403-9241; relocate bath room and wet barDetails
rev to pa# 2024-0403-9241; relocate bath room and wet bar | |
| May 22, 2024 | In progress issued May 2024 | 31 Landers St | interior remodel on 1st fl. remodel existing laundry/storage room and bathDetails
interior remodel on 1st fl. remodel existing laundry/storage room and bath | $30,000 | |
| May 16, 2024 | In progress issued Jul 2024 | 324 Clement St | West-Tec General Engineering Inc | ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permitDetails
ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permit | $120,000 |
| Apr 3, 2024 | Completed final sign-off Apr 2025 | 314 Utah St | Huey Construction Inc | add a family room, a study room, a bathroom in 1st fl garage area. as part of unit 314 utah st on 2nd flDetails
add a family room, a study room, a bathroom in 1st fl garage area. as part of unit 314 utah st on 2nd fl | $90,000 |
| Apr 2, 2024 | Completed final sign-off Sep 2025 | 2455 22nd Av | He & Kuang Inc | interior remodel: 1/f- add a bedroom, family room, office, and relocate bathroom. 2/f- remodel (e) bathroom, add a bathroom. add a stair at rear yard.Details
interior remodel: 1/f- add a bedroom, family room, office, and relocate bathroom. 2/f- remodel (e) bathroom, add a bathroom. add a stair at rear yard. | $120,000 |
| Mar 28, 2024 | Completed final sign-off Feb 2025 | 115 Upland Dr | He & Kuang Inc | interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind.Details
interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind. | $180,000 |
| Mar 21, 2024 | Expired or cancelled withdrawn Mar 2024 | 115 Upland Dr | interior remodel- basement crawl space to be converted into excercise room. 1st floor remodel (e) habitable space into guest room, office, and media room with two bathrooms. in 2nd floor remodel (e) space to have three bedrooms, two bathrooms and replace (3) windows in front of house in kind. addDetails
interior remodel- basement crawl space to be converted into excercise room. 1st floor remodel (e) habitable space into guest room, office, and media room with two bathrooms. in 2nd floor remodel (e) space to have three bedrooms, two bathrooms and replace (3) windows in front of house in kind. add | $280,000 | |
| Feb 26, 2024 | Completed final sign-off Mar 2025 | 401 Anderson St | Prosper Construction Dev Inc. | replace termite damage siding with new siding.Details
replace termite damage siding with new siding. | $15,000 |
| Feb 14, 2024 | In progress filed Feb 2024, not yet issued | 3858 24th St | replace 3 termite damage windows and siding in kind. to comply with nov# 201981211(item 2 and 3 for winow) and 20198491(item 2 for siding)Details
replace 3 termite damage windows and siding in kind. to comply with nov# 201981211(item 2 and 3 for winow) and 20198491(item 2 for siding) | $18,000 | |
| Feb 8, 2024 | Completed final sign-off Jan 2025 | 3858 24th St | to remodel (e) bathroom.Details
to remodel (e) bathroom. | $10,000 | |
| Jan 25, 2024 | Completed final sign-off Jan 2025 | 185 Corona St | Boaz Mor Design & Construction | 1/f replace damaged concrete footing and slab at family room and garage. remove fire place and chimney at family room, add a exterior door off garage. replace window at garage w/new window. repair section of garage roof and patch garage parapet. add a canopy over garage door. 2/f remove porch andDetails
1/f replace damaged concrete footing and slab at family room and garage. remove fire place and chimney at family room, add a exterior door off garage. replace window at garage w/new window. repair section of garage roof and patch garage parapet. add a canopy over garage door. 2/f remove porch and | $80,000 |
| Jan 23, 2024 | Completed final sign-off Dec 2024 | 4229 Cesar Chavez St | repair rear stucco wall in kind. replace rear windows and sliding doors in kindDetails
repair rear stucco wall in kind. replace rear windows and sliding doors in kind | $20,000 | |
| Jan 23, 2024 | Completed final sign-off Nov 2024 | 1978 46th Av | Quality General Construction Co Inc | fire damage repair of the entire bldg. add a powder room on 2/f. add a shower stall in existing toilet on 1/f. upgrade existing electrical panel to 200 amp. comply with nov 202297877.Details
fire damage repair of the entire bldg. add a powder room on 2/f. add a shower stall in existing toilet on 1/f. upgrade existing electrical panel to 200 amp. comply with nov 202297877. | $150,000 |
| Nov 27, 2023 | Completed final sign-off Dec 2024 | 746 Great Hy | 415 Design+Build, Fresh Homes | interior remodel in unit 2. 3rd fl: remodel e kitchen and bath in kindDetails
interior remodel in unit 2. 3rd fl: remodel e kitchen and bath in kind | $65,767 |
| Nov 16, 2023 | In progress issued Dec 2024 | 3452 Cabrillo St | Turley Construction | interior remodel in 1st fl unit: add a media room and remodel two (e) bathrooms. remove portion of (e) non-bearing wall, and infill window.Details
interior remodel in 1st fl unit: add a media room and remodel two (e) bathrooms. remove portion of (e) non-bearing wall, and infill window. | $40,000 |
| Nov 13, 2023 | In progress issued Feb 2024 | 207 Congo St | Iy Development & Renovation Inc | 1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl.Details
1st fl. add a family room, two bedrooms, a bathroom, a laundry room, replace (e) garage door w/new garage door, 2nd fl. add a interior stair to connect to 1st fl. | $98,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 1495 31st Av | Prosper Construction Dev Inc. | remodel (e) bottom of bay windowDetails
remodel (e) bottom of bay window | $5,000 |
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 3643 Folsom St | to add a full bathroom in lower fl.Details
to add a full bathroom in lower fl. | $20,000 | |
| Oct 27, 2023 | Completed final sign-off Sep 2024 | 4308 Judah St | K F L Construction Inc. | repair front stucco wall in kind. replace (e)header with (n) header in front of the building.Details
repair front stucco wall in kind. replace (e)header with (n) header in front of the building. | $20,000 |
| Oct 25, 2023 | Completed final sign-off Jan 2025 | 1330 Sanchez St | revision of permit# 201905211306: revise heating system from central heating to radiant floor heating.Details
revision of permit# 201905211306: revise heating system from central heating to radiant floor heating. | ||
| Oct 19, 2023 | Completed final sign-off Jan 2024 | 100 Dorado Tr | Kong Lai Construction | repair termit damage exterior wall (east side) in-kindDetails
repair termit damage exterior wall (east side) in-kind | $10,000 |
| Oct 17, 2023 | Completed final sign-off Jul 2024 | 166 Desmond St | Harmony Design & Development Inc | remodel (e) bathroom on 2nd fl, per plans.Details
remodel (e) bathroom on 2nd fl, per plans. | $10,000 |
| Sep 19, 2023 | Completed final sign-off Apr 2024 | 2583 28th Av | Sunset Builders Llc. | interior remodel: 1st flr- add a bedroom, a family room, a media room, and a bathroom; 2nd flr- remodel existing kitchen, bathroom, add a powder room.Details
interior remodel: 1st flr- add a bedroom, a family room, a media room, and a bathroom; 2nd flr- remodel existing kitchen, bathroom, add a powder room. | $120,000 |
| Sep 19, 2023 | Completed final sign-off Nov 2023 | 2545 Turk Bl | repair < 50% roof deck on third floor. to comply with n.ov. 20 202305135Details
repair < 50% roof deck on third floor. to comply with n.ov. 20 202305135 | $8,000 | |
| Sep 13, 2023 | In progress issued Nov 2024 | 62 Tingley St | All Bay Cities Construction | legalize 1st flr unit per state adu program. replace existing front windows in kind. to comply with nov no. 202309442. (single family + adu)Details
legalize 1st flr unit per state adu program. replace existing front windows in kind. to comply with nov no. 202309442. (single family + adu) | $100,000 |
| Aug 23, 2023 | Completed final sign-off Jan 2024 | 1495 31st Av | Prosper Construction Dev Inc. | revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove.Details
revision to pa# 202209142446. remodel existing kitchen, remove island and relocate stove. | |
| Aug 23, 2023 | Completed final sign-off Jan 2024 | 100 Dorado Tr | Kong Lai Construction | to add 5 windows on the east wallDetails
to add 5 windows on the east wall | $20,000 |
| Aug 18, 2023 | Completed final sign-off Mar 2025 | 1578 47th Av | Prosper Construction Dev Inc. | interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms.Details
interior remodel of (e) living space. relocate kitchen (from 2/f to g/f), living room, and dining room. remodel bedrooms and bathrooms. | $150,000 |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 634 Edna St | Prosper Construction Dev Inc. | revision to 202302282743 & 202306069377. revise ceiling height for laundry area on 1st fl.Details
revision to 202302282743 & 202306069377. revise ceiling height for laundry area on 1st fl. | |
| Jul 25, 2023 | Expired or cancelled withdrawn Jun 2024 | 1983 Palou Av | to comply w/ nov #201831281; to remove underpermited rooms on 1st fl. and addition at rear, restore house to it's original shapeDetails
to comply w/ nov #201831281; to remove underpermited rooms on 1st fl. and addition at rear, restore house to it's original shape | $9,000 |