West-Tec General Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2022 to Aug 2025
- Last 24 months
- 8 permits filed
34 permits since 2000: 23 completed, 7 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | In progress issued Aug 2025 | 759 09th Av | revision to pa # 202503041536: #759 & #761 kitchen remodel w/ open design. relocate door at laundry room. new led light throughout both units. electrical upgrade w/ new subpanel. bathroom remodel in #759 on 3/f.Details
revision to pa # 202503041536: #759 & #761 kitchen remodel w/ open design. relocate door at laundry room. new led light throughout both units. electrical upgrade w/ new subpanel. bathroom remodel in #759 on 3/f. | $35,000 |
| May 7, 2025 | Completed final sign-off Jun 2025 | 1450 Vallejo St | repair and replace dry rot on the deck behind, 2 beams under the deck to be replaced. not visible from streetDetails
repair and replace dry rot on the deck behind, 2 beams under the deck to be replaced. not visible from street | $5,000 |
| Apr 29, 2025 | Completed final sign-off May 2026 | 1032 Valencia St | comply with nov 202536689. replace windows. replace front windows, visible from street with wood. lower flat, 4 windows. 2nd floor. uf<=0.3Details
comply with nov 202536689. replace windows. replace front windows, visible from street with wood. lower flat, 4 windows. 2nd floor. uf<=0.3 | $1,500 |
| Mar 26, 2025 | Completed final sign-off Apr 2025 | 1814 Union St | replace minor dryrot on nw exterior wall of g/f replace siding and sheetrock (approx. 10x10 area). water intrusion caused by leaky damaged downspout which has since been replaced.Details
replace minor dryrot on nw exterior wall of g/f replace siding and sheetrock (approx. 10x10 area). water intrusion caused by leaky damaged downspout which has since been replaced. | $5,000 |
| Mar 20, 2025 | Completed final sign-off Jul 2025 | 2687 Mcallister St | document and correct rear yard stairs on p. l. previously re-build/replaced beyond scope of permit #201707111590 to comply with nov #201785071. landings posts, stringers treads/risers to be removed and replaced. footings to remain.Details
document and correct rear yard stairs on p. l. previously re-build/replaced beyond scope of permit #201707111590 to comply with nov #201785071. landings posts, stringers treads/risers to be removed and replaced. footings to remain. | $8,000 |
| Nov 7, 2024 | Completed final sign-off Jan 2025 | 347 Moscow St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $11,000 |
| Oct 16, 2024 | Completed final sign-off Oct 2025 | 26 Faxon Av | replace and repair roof window trim and posts in kind at staiway shaft. not street visibleDetails
replace and repair roof window trim and posts in kind at staiway shaft. not street visible | $3,000 |
| Oct 10, 2024 | Completed final sign-off Feb 2025 | 109 Lawton St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $15,000 |
| Sep 19, 2024 | Completed final sign-off Dec 2024 | 281 Baltimore Wy | remodeling existing bathroom w/ new tile, remove bath tub to shower pan, adding fan. replace new kitchen cabinet + two electrical switch. adding tube light living room and hallway.Details
remodeling existing bathroom w/ new tile, remove bath tub to shower pan, adding fan. replace new kitchen cabinet + two electrical switch. adding tube light living room and hallway. | $13,000 |
| Sep 4, 2024 | In progress issued Sep 2024 | 963 Valencia St | -replace a portion of the siding on the right hand of the building. not visible from street.Details
-replace a portion of the siding on the right hand of the building. not visible from street. | $3,000 |
| Aug 21, 2024 | In progress issued Aug 2024 | 610 Long Bridge St | replace 1 new window. (at the cafe) not street visibleDetails
replace 1 new window. (at the cafe) not street visible | $1,000 |
| Jun 6, 2024 | In progress issued Jul 2024 | 324 Clement St | mechanical design for improvement of space for new restaurant. ref pa# 202405162315Details
mechanical design for improvement of space for new restaurant. ref pa# 202405162315 | $200,000 |
| May 16, 2024 | In progress issued Jul 2024 | 324 Clement St | ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permitDetails
ref pa# 2016-1110-2464 remodel existing restaurant tenant space. to comply with nov #202297730 for awning. mep under separate permit | $120,000 |
| May 14, 2024 | Expired or cancelled withdrawn Aug 2026 | 223 09th St | comply w/ nov 202307567 - remove storage shelves.Details
comply w/ nov 202307567 - remove storage shelves. | $3,000 |
| May 7, 2024 | In progress filed May 2024, not yet issued | 620 Kearny St | relocate front doorDetails
relocate front door | $3,000 |
| Mar 28, 2024 | Completed final sign-off Nov 2024 | 208 Ward St | re-roofingDetails
re-roofing | $5,000 |
| Feb 20, 2024 | Completed final sign-off Jun 2024 | 112 Marietta Dr | to comply with nov 202418969Details
to comply with nov 202418969 | $2,000 |
| Dec 5, 2023 | Completed final sign-off Jun 2024 | 721 Dartmouth St | build a new wood deck in the rear of building.Details
build a new wood deck in the rear of building. | $25,000 |
| Nov 7, 2023 | Completed final sign-off Apr 2024 | 721 Dartmouth St | upgrade bathroom, kitchen and electrical.Details
upgrade bathroom, kitchen and electrical. | $30,000 |
| Aug 24, 2023 | Completed final sign-off Mar 2024 | 616 19th Av | remodel (1) bathroom and (1) kitchenDetails
remodel (1) bathroom and (1) kitchen | $25,000 |
| Aug 3, 2023 | Completed final sign-off May 2024 | 2795 41st Av | install deck and stair in backyard.Details
install deck and stair in backyard. | $10,000 |
| Jun 15, 2023 | Completed final sign-off Jul 2023 | 2071 Fulton St | one rear window replacement in kind. u=.30 max. complaint number #202179391 "egress stair." repair in kind. (less than 50%)Details
one rear window replacement in kind. u=.30 max. complaint number #202179391 "egress stair." repair in kind. (less than 50%) | $6,000 |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 162 Waverly Pl | selective interior demolition of 1st floor retail (1736 s.f.). 1. remove flooring, display slat wall, lighting fixtures. 2. demolish existing restroom fixtures and finishes. bathroom fixture count shall be determined on the tenant improvement permit application. tenant improvement on separate permitDetails
selective interior demolition of 1st floor retail (1736 s.f.). 1. remove flooring, display slat wall, lighting fixtures. 2. demolish existing restroom fixtures and finishes. bathroom fixture count shall be determined on the tenant improvement permit application. tenant improvement on separate permit | $4,500 |
| May 19, 2023 | Expired or cancelled withdrawn Jun 2023 | 1265 48th Av | revision to bpa# 202205234751: to correct address from 1267 48th ave to 1265 a 48th ave.Details
revision to bpa# 202205234751: to correct address from 1267 48th ave to 1265 a 48th ave. | $10,374 |
| May 3, 2023 | Completed final sign-off Jun 2023 | 244 Moncada Wy | remodel 1 kitchen, replace cabinets and countertop & remodel 4 bathrooms to replace vantiy, tub and toilets in kind.Details
remodel 1 kitchen, replace cabinets and countertop & remodel 4 bathrooms to replace vantiy, tub and toilets in kind. | $30,000 |
| May 2, 2023 | Completed final sign-off Sep 2023 | 507 Oxford St | construct new deck at first floor with stairs to rear yardDetails
construct new deck at first floor with stairs to rear yard | $4,000 |
| Apr 21, 2023 | Expired or cancelled withdrawn Apr 2023 | 1400 Ortega St | soft demolition for exploratory and clean up prepare for future improvement.Details
soft demolition for exploratory and clean up prepare for future improvement. | $2,000 |
| Feb 10, 2023 | Completed final sign-off Jun 2023 | 701 Clement St | remove the roll down date to comply with nov# 202297737Details
remove the roll down date to comply with nov# 202297737 | $1,200 |
| Dec 16, 2022 | In progress issued Oct 2024 | 674 Broadway | rev to 2021-0716-4549: t.i. at 2nd fl office space. change commercial to residential: additon of a 5 bedrooms, 6 bathrooms (4 full baths, 2 half baths), new kitchen & living room & dining room; add skylight to bedrooms, expand (e) lightwell. (original work started under 2016-0203-8720)Details
rev to 2021-0716-4549: t.i. at 2nd fl office space. change commercial to residential: additon of a 5 bedrooms, 6 bathrooms (4 full baths, 2 half baths), new kitchen & living room & dining room; add skylight to bedrooms, expand (e) lightwell. (original work started under 2016-0203-8720) | $40,000 |
| Dec 6, 2022 | Never finaled filed Dec 2022, never issued | 701 Clement St | to comply w/ces nov#202297737 date 11/1/2022. legalize (e) metal gate.Details
to comply w/ces nov#202297737 date 11/1/2022. legalize (e) metal gate. | $1,000 |
| Sep 13, 2022 | Completed final sign-off May 2023 | 27 Saint Louis Al | to comply wth nov 2011-62089. remove/demo existing roof deck.Details
to comply wth nov 2011-62089. remove/demo existing roof deck. | $30,000 |
| Aug 17, 2022 | Completed final sign-off Feb 2023 | 5821 Geary Bl | interior t.i. for new outlet and equipment. to comply with nov202291862.replace plumbing fixtures to new. no walls or layout changes.Details
interior t.i. for new outlet and equipment. to comply with nov202291862.replace plumbing fixtures to new. no walls or layout changes. | $50,000 |
| May 23, 2022 | Completed final sign-off Jul 2023 | 1267 48th Av | install new fire sprinkler system throughout ground floor per nfpa 13 including new 2" dedicated fire service per nfpa 24 (total sprinklers=19) ref pa# 202012241725.Details
install new fire sprinkler system throughout ground floor per nfpa 13 including new 2" dedicated fire service per nfpa 24 (total sprinklers=19) ref pa# 202012241725. | $10,374 |
| May 9, 2022 | Completed final sign-off Mar 2023 | 1737 Post St | suite 383: propose beverage store (drink shop) pink pink tea shop to existing space. to add the equipments needs with associate mechanical, plumbing and electrical work.Details
suite 383: propose beverage store (drink shop) pink pink tea shop to existing space. to add the equipments needs with associate mechanical, plumbing and electrical work. | $90,000 |