Block 3729, lot 079
223 09th St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 4
- Rooms
- 10 bathrooms
- Building
- 4,755 sq ft
- Lot
- 1,999 sq ft
- Zoning
- SLR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | Completed final sign-off Sep 2026 | 223 09th St | Kwong Associates | comply with nov#202307567. ti improvement, remodel (e) restroom to ada compliance.Details
comply with nov#202307567. ti improvement, remodel (e) restroom to ada compliance. | $8,000 |
| May 14, 2024 | Expired or cancelled withdrawn Aug 2026 | 223 09th St | West-Tec General Engineering Inc | comply w/ nov 202307567 - remove storage shelves.Details
comply w/ nov 202307567 - remove storage shelves. | $3,000 |
| Feb 8, 2022 | Completed final sign-off Apr 2022 | 225 09th St | Huey Const Mngmt Co Inc - Dba M H Const. | repair damaged apt unit from fire 2 roomsDetails
repair damaged apt unit from fire 2 rooms | $40,000 |
| May 20, 2016 | Never finaled issued May 2016, no final | 223 09th St | street spaceDetails
street space | ||
| Sep 17, 2013 | Completed final sign-off Oct 2013 | 223 09th St | Ac And Company | per nov# 201305841 item #3, #4c & #2: framing repairs and incomplete handrails- remove framing and trap door leading to basement, provide handrails at front and rear stairway.Details
per nov# 201305841 item #3, #4c & #2: framing repairs and incomplete handrails- remove framing and trap door leading to basement, provide handrails at front and rear stairway. | $1,200 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 223 09th St | Ac And Company | to obtain final inspection for work approved under pa #9618585. all work is complete.Details
to obtain final inspection for work approved under pa #9618585. all work is complete. | |
| Mar 26, 2013 | Completed final sign-off Mar 2013 | 223 09th St | Ac And Company | to obtain final inspection for work approved under pa 9618585; all work is completeDetails
to obtain final inspection for work approved under pa 9618585; all work is complete | |
| Mar 6, 2013 | Completed final sign-off Apr 2013 | 225 09th St | Ac And Company | #3- bathroom demo as needed, provide & install 20 amp g.f.i. with one receptacle, light fixtures, switch leg at kitchen, level floor and install tile, replace 7 light fixtures with like kind. bathroom: new toilet, lav. sink and shower pan. bathroom lighting shallcomply w/cec150(k)10,Details
#3- bathroom demo as needed, provide & install 20 amp g.f.i. with one receptacle, light fixtures, switch leg at kitchen, level floor and install tile, replace 7 light fixtures with like kind. bathroom: new toilet, lav. sink and shower pan. bathroom lighting shallcomply w/cec150(k)10, | $13,500 |
| Mar 27, 2009 | Completed final sign-off Aug 2009 | 223 09th St | disabled access features to establish medical cannabis dispensary; revision to complete work and obtain final inspection for work approved under pa 200503298691.Details
disabled access features to establish medical cannabis dispensary; revision to complete work and obtain final inspection for work approved under pa 200503298691. | $1,000 | |
| Mar 29, 2005 | Expired or cancelled expired Nov 2007 | 223 09th St | to establish the us of cannabis. power door operator in lieu of level landing & exterior door side clearance.Details
to establish the us of cannabis. power door operator in lieu of level landing & exterior door side clearance. | ||
| Apr 21, 2004 | Expired or cancelled expired Jan 2006 | 223 09th St | remodel bathroom, in unit 225, no structural workDetails
remodel bathroom, in unit 225, no structural work | $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.