- On San Francisco permits
- Jun 2018 to Sep 2026
76 permits since 2000 (engineer on 72 permits, architect on 4 permits): 43 completed, 14 in progress, 14 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 250 Laurel St | Stroub Construction | unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork....Details
unit 401: interior alteration including selective demolition, modification of non-load bearing interior partitions, kitchen and bath remodel, new plumbing fixtures & asso. piping, electrical and lighting alterations. modifications to (e) heating system. replacement of int. finishes & millwork.... | $150,000 |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 2755 Scott St | revision to pa#202508284138. localized strengthening for lateral, gravity, and foundation systems provided. replacement of front door & sidelites. front door to be wood. door to be replaced with area of infill adjacent sidelites.Details
revision to pa#202508284138. localized strengthening for lateral, gravity, and foundation systems provided. replacement of front door & sidelites. front door to be wood. door to be replaced with area of infill adjacent sidelites. | $100,000 | |
| Jul 2, 2026 | In progress issued Jul 2026 | 50 Presidio Av | Farallon General Contractors Inc. | to comply with complaint 202651866 - partial removal of existing concrete retaining wall and support of the retaining wall with a new concrete buttress wall.Details
to comply with complaint 202651866 - partial removal of existing concrete retaining wall and support of the retaining wall with a new concrete buttress wall. | $100,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 4721 Lincoln Wy | revise permit 2025-1211-1599 to reflect the use of #4 horizontal bars rather than #5 bars as originally permitted.Details
revise permit 2025-1211-1599 to reflect the use of #4 horizontal bars rather than #5 bars as originally permitted. | ||
| Apr 23, 2026 | In progress issued May 2026 | 3001 Pacific Av | Rod Heisler Construction | temporary shoring for residence under pa# 202411054395. all shoring scope remain within the property and does not cross property lines.Details
temporary shoring for residence under pa# 202411054395. all shoring scope remain within the property and does not cross property lines. | $250,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 39 Beaumont Av | replacement of existing metal exterior stair with new wood framed stair.Details
replacement of existing metal exterior stair with new wood framed stair. | $6,500 | |
| Mar 6, 2026 | In progress issued Jun 2026 | 2512 Broadway | Proline Construction | the project is an infill addition of a new powder room and bar at level 2, w/ a new walkable skylight roof. the infill will be in between two (e) walls that extend one story above the roof of the infill. no structural upgrades or seismic retrofit will be required.Details
the project is an infill addition of a new powder room and bar at level 2, w/ a new walkable skylight roof. the infill will be in between two (e) walls that extend one story above the roof of the infill. no structural upgrades or seismic retrofit will be required. | $31,821 |
| Nov 20, 2025 | In progress issued Dec 2025 | 359 Lexington St | Continuum Construction | revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f.Details
revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f. | |
| Apr 8, 2025 | In progress issued May 2025 | 432 Jersey St | Andrew G Construction | repair of localized rotted wood framing in kind at e) 3 story residence, design of foundation at north east cornor of the bldgDetails
repair of localized rotted wood framing in kind at e) 3 story residence, design of foundation at north east cornor of the bldg | $5,000 |
| Apr 8, 2025 | In progress issued May 2025 | 430 Jersey St | Andrew G Construction | repair of localized rotted wood framing in kind at e) 3 story residence, design of foundation at north east cornor of the bldgDetails
repair of localized rotted wood framing in kind at e) 3 story residence, design of foundation at north east cornor of the bldg | $5,000 |
| Jan 21, 2025 | Completed final sign-off Dec 2025 | 10 Ina Ct | Orchard Construction | remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows.Details
remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows. | $100,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 406 30th St | Martin Paul Duggan Contracting | interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof.Details
interior renovation of 2nd floor lower unit (406a) with new kitchen, bathroom and powder room/laundry. new deck and stairs in rear yard from ground to floor 3. remove brick chimney from ground floor to roof. | $150,000 |
| Jul 31, 2024 | Completed final sign-off Apr 2025 | 2255 Clay St | Terence Mcmahon Construction | interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces.Details
interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces. | $115,000 |
| Jun 20, 2024 | Expired or cancelled expired Nov 2025 | 341 Hugo St | Huff Construction Company Inc | revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom.Details
revision to permit 202209011716. 1/f: reconfigure utility room and kitchen counter. relocate toilet. 2/f: reconfigure bathroom, fill in lightwell, remove closet. 3/f: reconfigure closet in master suite bedroom. | $30,000 |
| Jun 14, 2024 | In progress filed Jun 2024, not yet issued | 11 Santa Monica Wy | Woodteck Construction, Llc | interior remodel of 3 bathrooms, kitchen and pantry. seismic strenthening to include remodel of sfd to remove structural wall and installing new beams and post. lateral strenthening not triggered.Details
interior remodel of 3 bathrooms, kitchen and pantry. seismic strenthening to include remodel of sfd to remove structural wall and installing new beams and post. lateral strenthening not triggered. | $65,000 |
| Apr 30, 2024 | In progress issued May 2024 | 2153 Lake St | Jeff King And Company Inc | reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows.Details
reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows. | $100,000 |
| Mar 25, 2024 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | new non combustible roof deck, new stair to roof, new skylight, interior renovations on all levels, structural upgradesDetails
new non combustible roof deck, new stair to roof, new skylight, interior renovations on all levels, structural upgrades | $400,000 |
| Mar 8, 2024 | In progress issued Mar 2024 | 1679 35th Av | revision to pa# 2021-0629-3442; remove ground floor scoope of work from pa# 2021-06293442Details
revision to pa# 2021-0629-3442; remove ground floor scoope of work from pa# 2021-06293442 | ||
| Jan 31, 2024 | In progress issued Feb 2024 | 2755 Scott St | Ashbury Gen Constructing & Eng | widening of garage entry from 7'8" to 8'6Details
widening of garage entry from 7'8" to 8'6 | $25,000 |
| Sep 11, 2023 | In progress issued Sep 2024 | 2755 Scott St | Joel Mark, Ashbury Gen Constructing & Eng | revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions.Details
revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions. | $152,000 |
| Apr 3, 2023 | Completed final sign-off Aug 2023 | 2121 Bush St | Ideal Builders | replacement of retaining wall and wood fence at south west corner of bldgDetails
replacement of retaining wall and wood fence at south west corner of bldg | $30,000 |
| Dec 1, 2022 | Expired or cancelled expired Mar 2025 | 2529 Union St | Bbc Construction Inc. | replacement of existing and new rear yard retaining walls. new exterior stair and railing.Details
replacement of existing and new rear yard retaining walls. new exterior stair and railing. | $40,000 |
| Nov 18, 2022 | Expired or cancelled withdrawn Jan 2024 | 766 30th Av | American Builders | revision to permits 202208190914 and 202209212893. new sliding patio door at 2/f family room and new rear 2/f deck.Details
revision to permits 202208190914 and 202209212893. new sliding patio door at 2/f family room and new rear 2/f deck. | $15,000 |
| Nov 9, 2022 | Completed final sign-off Jan 2023 | 4752 17th St | Brendan Waters Construction Inc | voluntary strengthening of 1st floor framing above garage; sister new joists to existing joists, per plans.Details
voluntary strengthening of 1st floor framing above garage; sister new joists to existing joists, per plans. | $24,000 |
| Oct 18, 2022 | Completed final sign-off Dec 2023 | 440 36th Av | Gregory Loughran Construction | remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel.Details
remodel of sfd. new windows, doors, lighting, plumbing fixures, finishes. infill deck stair, new laundry room, new entry gate. bathroom and kitchen remodel. | $250,000 |
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 1877 Church St | Michael Clarke Construction | rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor.Details
rev to pa201909050773: second floor deck to be extended 10ft into rear yard as drawn. revised engineering included for larger deck design. change art studio to media room on the ground floor. | $5,000 |
| Jun 28, 2022 | Expired or cancelled cancelled Aug 2025 | 436 Eureka St | alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182Details
alter site permit# 2018-1009-2526-s to conform with exhibit 9 of appeal # 22-013 bpa# 2022-0527-5182 | ||
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 30 Walnut St | Arrow Builders Inc | 2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair.Details
2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair. | $50,000 |
| Jun 17, 2022 | Never finaled issued Jun 2022, no final | 550 El Camino Del Mar | replace all exterior windows and doors (except front door). remove concrete steps at front facade and greenhouse on rear facade. patch, repair and replace stucco as required. voluntary seismic upgrade.Details
replace all exterior windows and doors (except front door). remove concrete steps at front facade and greenhouse on rear facade. patch, repair and replace stucco as required. voluntary seismic upgrade. | $75,000 | |
| Jun 15, 2022 | Never finaled issued Aug 2022, no final | 184 Avila St | new roof deck within bldg area, setback 3-5 feet from property lines, less than 500 sq ft. new roof hatch added. new railing, less than 42 inches added. wood railing at deckDetails
new roof deck within bldg area, setback 3-5 feet from property lines, less than 500 sq ft. new roof hatch added. new railing, less than 42 inches added. wood railing at deck | $50,000 | |
| Jun 7, 2022 | Completed final sign-off Jun 2024 | 733 Panorama Dr | refinish/ install flooring. replace furnace and all ductwork, windows in-kind. all finishes in kitchen and bathrooms. remove wall between kitchen and dining room. reconfigure of primary bath and closet. relocate door between garage and kitchen. new deck and guardrail at rear yard.Details
refinish/ install flooring. replace furnace and all ductwork, windows in-kind. all finishes in kitchen and bathrooms. remove wall between kitchen and dining room. reconfigure of primary bath and closet. relocate door between garage and kitchen. new deck and guardrail at rear yard. | $80,000 | |
| Jun 1, 2022 | Completed final sign-off Oct 2023 | 662 46th Av | Burke Construction | interior remodel to (e) bathroom. add new sink to (e) water closet. change (e) garage window to a door. enclose (e) covered entry. new interior stair. new lighting & electrical @ areas of (n) work only. legalize rooms at garage level to include family room with bar, laundry room and bathroomDetails
interior remodel to (e) bathroom. add new sink to (e) water closet. change (e) garage window to a door. enclose (e) covered entry. new interior stair. new lighting & electrical @ areas of (n) work only. legalize rooms at garage level to include family room with bar, laundry room and bathroom | $40,000 |
| May 3, 2022 | Completed final sign-off May 2025 | 112 Noe St | Rua Woods Construction Inc | replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts.Details
replace 3 windows. 1 new transom window above (e) backdoor. remove 2 interior partitions. new structural beams. kitchen renovation & new powder room including new finishes, millwork, plumbing fixtures, lighting fixtures, and appliances. new mep as required. new gas furnace & heating ducts. | $50,000 |
| May 2, 2022 | Completed final sign-off Mar 2023 | 742 27th Av | Kilrea Construction Inc. | temporary shoring of the (e) residence superstructure for work permitted by pa #201907035056. all shoring scope remains within the property and does not cross property lines.Details
temporary shoring of the (e) residence superstructure for work permitted by pa #201907035056. all shoring scope remains within the property and does not cross property lines. | $10,000 |
| Mar 31, 2022 | Never finaled issued Apr 2022, no final | 42 Jordan Av | Selvig Development | interior remodel to (e) single family residence. replacement of specific dry rotted windows and french doors 2.5 bathroom renovations, addition of an entry foyer (n) mech system supplement kithcne remodel under bpa 202112164568Details
interior remodel to (e) single family residence. replacement of specific dry rotted windows and french doors 2.5 bathroom renovations, addition of an entry foyer (n) mech system supplement kithcne remodel under bpa 202112164568 | $90,000 |
| Mar 24, 2022 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | replacement of (e) deteriorated property line retaining wall and fence.Details
replacement of (e) deteriorated property line retaining wall and fence. | $50,000 |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 550 El Camino Del Mar | interior remodel with newly renovated kitchenette on 1st fl. new mechanical equipment & electrical in affected areas. 3 (e) fireplaces to be converted to gas. new laundry room on 1st fl. enlarge door openings & move partitions on 2nd fl.Details
interior remodel with newly renovated kitchenette on 1st fl. new mechanical equipment & electrical in affected areas. 3 (e) fireplaces to be converted to gas. new laundry room on 1st fl. enlarge door openings & move partitions on 2nd fl. | $80,000 | |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 3565 Clay St | Clayton Timbrell & Co | (n) windows at front third floor to match (e) wood, true divided lites. (n) doors at rear. interior remodel, (n) fixtures & finishes with (n) interior partitions at 1st fl. (n) water feature, tub & finishes at rear yard.Details
(n) windows at front third floor to match (e) wood, true divided lites. (n) doors at rear. interior remodel, (n) fixtures & finishes with (n) interior partitions at 1st fl. (n) water feature, tub & finishes at rear yard. | $200,000 |
| Feb 4, 2022 | Completed final sign-off Dec 2022 | 77 Christopher Dr | structural revision to permit 202103176728. vault ceiling at living room area.Details
structural revision to permit 202103176728. vault ceiling at living room area. | $2,000 | |
| Oct 8, 2021 | Completed final sign-off Mar 2022 | 3 Clarendon Av | O'dwyer Construction Inc | new bison pedestal system roof deck over existing roof structure. new lighting & electrial at area of work only. no change to building envelope.Details
new bison pedestal system roof deck over existing roof structure. new lighting & electrial at area of work only. no change to building envelope. | $55,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2023 | 2123 Bush St | Ideal Builders | convert rear detached studio space to (n) garage at rear of building and extend and renovate rear deck.Details
convert rear detached studio space to (n) garage at rear of building and extend and renovate rear deck. | $100,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 1227 Guerrero St | Youda Builders Inc | revision to 2021-0614-2321. to delete concrete foundation where there is existing foundation.Details
revision to 2021-0614-2321. to delete concrete foundation where there is existing foundation. | |
| Jun 29, 2021 | Never finaled issued Jun 2023, no final | 1679 35th Av | ground floor - remodel office & utility room w/laundry, add storage room; 2nd fl - remodel (1) full bath, remodel 1/4 bath to be full bath; add deck & door from dining, relocate closetDetails
ground floor - remodel office & utility room w/laundry, add storage room; 2nd fl - remodel (1) full bath, remodel 1/4 bath to be full bath; add deck & door from dining, relocate closet | $38,000 | |
| Jun 24, 2021 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | 1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fenceDetails
1st floor: new full bath, new partitions, electrical, lighting, plumbing, mech, floor & ceiling surfaces, new doors and window as well. 2nd floor: gas fire place, nw front door. (in extg location). new deck, stair, fence | $150,000 |
| Apr 26, 2021 | Completed final sign-off Apr 2024 | 1122 Wawona St | Unicon Construction Solutions Llc | revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level.Details
revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level. | $50,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 15 Presidio Tr | The Toboni Group | new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow.Details
new exterior deck at 2nd level less than 10' above grade. removel of railing from (e) door. work is within required rear + side yard. no facade work. no work in prow. | $75,000 |
| Apr 6, 2021 | Completed final sign-off Jul 2022 | 8 Russian Hill Pl | Stingray Builders Inc. | unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898.Details
unit #2: interior remodel of kitchen, 2 bathrooms, lighting, floor wall and ceiling finishes, hvac. structural work under pa 201902042041 and pa 202009103898. | $200,000 |
| Apr 5, 2021 | Completed final sign-off Aug 2022 | 1843 35th Av | Richard De Nola | main level: kitchen and bath remodel. close roof over staircase. ground level: finish interiors with new bath, bedroom and family room, laundry closet. replace forced air heating system with new one.Details
main level: kitchen and bath remodel. close roof over staircase. ground level: finish interiors with new bath, bedroom and family room, laundry closet. replace forced air heating system with new one. | $175,000 |
| Mar 17, 2021 | Completed final sign-off Dec 2022 | 77 Christopher Dr | Zarc Construction Inc | 2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen.Details
2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen. | $189,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1717 Baker St | Arrow Builders Inc | (n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front.Details
(n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front. | $213,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2024 | 184 Avila St | Amn Construction | interior remodel to upper level & seismic upgrade bldg to include (n) ensuite main bath at south main bedroom.remodel kitchen to open to front dining and living room. provide (n) 1/2 bath, reconfigure bath #2 at north. adu under pa202101283536.Details
interior remodel to upper level & seismic upgrade bldg to include (n) ensuite main bath at south main bedroom.remodel kitchen to open to front dining and living room. provide (n) 1/2 bath, reconfigure bath #2 at north. adu under pa202101283536. | $521,000 |
| Jan 29, 2021 | Never finaled issued Apr 2021, no final | 1904 Baker St | Add A Garage Inc. | installation of emergency replcement floor beams supporting 2/f joist. installation of temp power emergency shoring posts and beams supporting second floor joists. no exterior work under this permit.Details
installation of emergency replcement floor beams supporting 2/f joist. installation of temp power emergency shoring posts and beams supporting second floor joists. no exterior work under this permit. | $35,000 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 45 Almaden Ct | Colindres & Associates | interior remodel at 2nd fl (main floor): remodel and expand kitchen. replace all windows and stucco.Details
interior remodel at 2nd fl (main floor): remodel and expand kitchen. replace all windows and stucco. | $50,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2023 | 4095 Cesar Chavez St | Millsap Degnan & Associates | comply with nov #201999598: repair of existing site wall between 2 properties. reference pa #202110190767 4085 cesar chavez st.Details
comply with nov #201999598: repair of existing site wall between 2 properties. reference pa #202110190767 4085 cesar chavez st. | $100,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 137 03rd Av | Andrew Gallagher Construction | remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks.Details
remove (e) wall between kitchen and dining room, new kitchen island, lighting and gfci receptacles, relocate hvac air register, new sliding patio doors to rear deck, replce bath vanity & sinks. | $45,000 |
| Nov 20, 2020 | Completed final sign-off Sep 2022 | 3398 Baker St | Cairn Construction | priority processing ab-004. remodel kitchen & 3 bathrooms.partial renovation of 1/f. renovation of levels 2 and 3. repair stucco in-kind, replacement of all mech/electrical/plmbing.no horizontal/vertical changes.Details
priority processing ab-004. remodel kitchen & 3 bathrooms.partial renovation of 1/f. renovation of levels 2 and 3. repair stucco in-kind, replacement of all mech/electrical/plmbing.no horizontal/vertical changes. | $800,000 |
| Nov 18, 2020 | Never finaled issued Apr 2021, no final | 2542 15th Av | Siteline Construction | addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stairDetails
addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stair | $150,000 |
| Oct 26, 2020 | Completed final sign-off Oct 2021 | 790 Lyon St | Sasso Construction Inc. | remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney.Details
remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney. | $75,000 |
| Oct 23, 2020 | Completed final sign-off May 2022 | 198 Laidley St | Altman & Co General Contractors | replace existing beams with new beams and steel hanger. add framing tie backs. reuse existing joists and decking.Details
replace existing beams with new beams and steel hanger. add framing tie backs. reuse existing joists and decking. | $24,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2026 | 2420 Pacific Av | The Toboni Group | interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevatorDetails
interior remodel & modifications including (n) elevator & foundation retrofit; minor relocation (without area reduction) of (e) housekeeper's unit to accommodate (n) elevator | $862,000 |
| Aug 17, 2020 | Expired or cancelled withdrawn Jan 2022 | 1522 07th Av | horizontal addition at first floor below existing deck and kitchen remodel.Details
horizontal addition at first floor below existing deck and kitchen remodel. | $20,000 | |
| Jun 11, 2020 | Completed final sign-off Aug 2021 | 412 Capistrano Av | replace (e) brick stair due to rot at wood substrate and support structure. no other work under this permit.Details
replace (e) brick stair due to rot at wood substrate and support structure. no other work under this permit. | $5,000 | |
| May 13, 2020 | Completed final sign-off Apr 2023 | 2832 Sacramento St | Ben Hardy & Company | remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street.Details
remodel existing kitchen at first floor and bathrooms at first and second floor. beam added in living room posting to lower floor. no change to occupancy and exiting. no change to exterior visible from the street. | $100,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2024 | 2862 Bush St | Redoak Construction | excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above.Details
excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above. | $800,000 |
| Mar 5, 2020 | Completed final sign-off Apr 2022 | 3010 Pacific Av | Cook Construction | temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes.Details
temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes. | $50,000 |
| Feb 28, 2020 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | Bergquist Builders | replace kitchen cabinets, appliance & plumbing remain in extg locations. new electrical. remodel master bath. voluntary strengthening of west kitchen wall. plumbing counts remain same.Details
replace kitchen cabinets, appliance & plumbing remain in extg locations. new electrical. remodel master bath. voluntary strengthening of west kitchen wall. plumbing counts remain same. | $100,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2020 | 41 Miraloma Dr | Better Homes Construction | ground floor: 2 new bedrooms, new full bath, nw laundry and hall. nw conc. slab for habitable spaces as drawn. 2nd fl: nw half bath. extg load bearing wall to be removed as drawn with new posts beam and foundations as drawn.Details
ground floor: 2 new bedrooms, new full bath, nw laundry and hall. nw conc. slab for habitable spaces as drawn. 2nd fl: nw half bath. extg load bearing wall to be removed as drawn with new posts beam and foundations as drawn. | $48,000 |
| Dec 30, 2019 | Completed final sign-off Jun 2020 | 619 Noriega St | Wolk Development Company Llc | (e) kitchen remodel on 2nd floor. install psl to open kitchen to living room, replace cabinet, counters, appliances, install recessed lighting.Details
(e) kitchen remodel on 2nd floor. install psl to open kitchen to living room, replace cabinet, counters, appliances, install recessed lighting. | $60,000 |
| Dec 20, 2019 | Never finaled issued Mar 2021, no final | 181 Collins St | Selvig Development | remodel of single family residence. replace windows shashes in kind. widen garage door. interior remodel throughoutDetails
remodel of single family residence. replace windows shashes in kind. widen garage door. interior remodel throughout | $100,000 |
| Dec 18, 2019 | Completed final sign-off Apr 2024 | 1122 Wawona St | Unicon Construction Solutions Llc | renovation of (e) dwelling, new entry and conversion of (e) balcony to bay window, relocate ( 1 ) full bathroo, replace roof with 2 new skylights, convert to radiant heat.Details
renovation of (e) dwelling, new entry and conversion of (e) balcony to bay window, relocate ( 1 ) full bathroo, replace roof with 2 new skylights, convert to radiant heat. | $40,000 |
| Oct 11, 2019 | Completed final sign-off Feb 2020 | 2529 Union St | Jeremy Pickett | interior remodel of single family swelling, include reconfiguration of existing non-load bearing walls, (n) structural shearwall & foundation, and minor electrical work.Details
interior remodel of single family swelling, include reconfiguration of existing non-load bearing walls, (n) structural shearwall & foundation, and minor electrical work. | $40,000 |
| Sep 6, 2019 | Completed final sign-off Oct 2024 | 190 Saint Germain Av | replace (e) 1st & 2nd level decks with new decks & new non-egress stair.Details
replace (e) 1st & 2nd level decks with new decks & new non-egress stair. | $120,000 | |
| Jun 18, 2019 | Completed final sign-off Oct 2020 | 116 Stanyan St | Professional Home Designs | interior remodel at all 3 e stories. work includes new skylights, demo walls and doors, new walls, partitoins, doors, relocation of laundry rm, bath and kitchen, replace front facade window in kind. new small deck in rear yardDetails
interior remodel at all 3 e stories. work includes new skylights, demo walls and doors, new walls, partitoins, doors, relocation of laundry rm, bath and kitchen, replace front facade window in kind. new small deck in rear yard | $100,000 |
| May 15, 2019 | Never finaled issued Sep 2020, no final | 667 Hearst Av | interior remodel w/ rear yard addition at ground flr only. ground flr will have guest room w/ added full bath. 2nd flr will have a (n) deck over (n) enclosed addition area.Details
interior remodel w/ rear yard addition at ground flr only. ground flr will have guest room w/ added full bath. 2nd flr will have a (n) deck over (n) enclosed addition area. | $48,000 | |
| Oct 9, 2018 | Never finaled issued Feb 2022, no final | 436 Eureka St | Perez Construction Llc. | horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchenDetails
horizontal expansion @ rear of all levels.(n) interior stair to connect all levels. remodel & reconfigure interior walls throughout per plans. excavate & expand existing garage.(n) doors and windows per elevations, new 2 beds & 2 baths.in ground hot tub location in rear yard.remodel kitchen | $800,000 |
| Jun 6, 2018 | Never finaled issued Sep 2022, no final | 63 Rico Wy | Forma Construction | renovation of (e) 2 story single family residence. vertical addition of (n) 3rd story. roof terrace & stair penthouse. 3rd floor includes master suite, office, bathroom & bedrooms. **maher n/a**Details
renovation of (e) 2 story single family residence. vertical addition of (n) 3rd story. roof terrace & stair penthouse. 3rd floor includes master suite, office, bathroom & bedrooms. **maher n/a** | $125,000 |