Kristen Johnson Haller
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Haller Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2011 to Oct 2025
21 permits since 2000 (architect on 19 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 11 completed, 2 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2025 | In progress issued Nov 2025 | 2911 Jackson St | Upcycle Builders Inc. | revision to 202411084653: adding bathroom at 4th/f, remodel of e) 4th/f bathroom, addition of 4th/f wet bar. replace 25 windows on 3rd & 4th fl, like for like on jackson st.Details
revision to 202411084653: adding bathroom at 4th/f, remodel of e) 4th/f bathroom, addition of 4th/f wet bar. replace 25 windows on 3rd & 4th fl, like for like on jackson st. | $99,000 |
| Dec 6, 2024 | In progress issued Apr 2025 | 2911 Jackson St | Upcycle Builders Inc. | 4/f - new dormer roof at existing rear roof; deck replacement with new 60 inch high windscreen; new wood flooring throughout the 4th floor. update electrical and plumbing in area of work.Details
4/f - new dormer roof at existing rear roof; deck replacement with new 60 inch high windscreen; new wood flooring throughout the 4th floor. update electrical and plumbing in area of work. | $117,274 |
| Jan 5, 2024 | Expired or cancelled cancelled Mar 2024 | 2911 Jackson St | fourth floor - new dormer roof at existing rear roof; deck replacement with new 60 inch high windscreen; new wood flooring throughout the 4th floor. update electrical and plumbing in area of work.Details
fourth floor - new dormer roof at existing rear roof; deck replacement with new 60 inch high windscreen; new wood flooring throughout the 4th floor. update electrical and plumbing in area of work. | $117,274 | |
| Dec 29, 2023 | Completed final sign-off May 2025 | 1616 Shrader St | Kadon Construction | renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egressDetails
renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egress | $84,000 |
| May 1, 2023 | Completed final sign-off May 2023 | 1616 Shrader St | revision to 202106243177, new opening at dining rm wall, removal of rotted storage cabinet at base of chimney. revision 2Details
revision to 202106243177, new opening at dining rm wall, removal of rotted storage cabinet at base of chimney. revision 2 | ||
| Jun 17, 2022 | Never finaled issued Jun 2022, no final | 550 El Camino Del Mar | replace all exterior windows and doors (except front door). remove concrete steps at front facade and greenhouse on rear facade. patch, repair and replace stucco as required. voluntary seismic upgrade.Details
replace all exterior windows and doors (except front door). remove concrete steps at front facade and greenhouse on rear facade. patch, repair and replace stucco as required. voluntary seismic upgrade. | $75,000 | |
| Apr 18, 2022 | Completed final sign-off Oct 2025 | 1741 Stockton St | Baracke Dba Infinity Construction, Boman Deign & Construction Inc, Don Rene Alvarado General Construction | 1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas.Details
1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas. | $75,000 |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 550 El Camino Del Mar | interior remodel with newly renovated kitchenette on 1st fl. new mechanical equipment & electrical in affected areas. 3 (e) fireplaces to be converted to gas. new laundry room on 1st fl. enlarge door openings & move partitions on 2nd fl.Details
interior remodel with newly renovated kitchenette on 1st fl. new mechanical equipment & electrical in affected areas. 3 (e) fireplaces to be converted to gas. new laundry room on 1st fl. enlarge door openings & move partitions on 2nd fl. | $80,000 | |
| Mar 24, 2022 | Completed final sign-off May 2023 | 1616 Shrader St | Kadon Construction | replacement of (e) deteriorated property line retaining wall and fence.Details
replacement of (e) deteriorated property line retaining wall and fence. | $50,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 658 Wisconsin St | Straightedge Construction | renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade.Details
renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade. | $15,000 |
| Feb 2, 2021 | Expired or cancelled withdrawn May 2023 | 2750 Lake St | 2nd story addition & terrace over garage. interior remodel of kitchen, pantry, (2) full baths & (1/2) bath & (n) stair to basement. exterior door & partial window expansion and/or replacement in areas to be remodeled. no change to occupancyDetails
2nd story addition & terrace over garage. interior remodel of kitchen, pantry, (2) full baths & (1/2) bath & (n) stair to basement. exterior door & partial window expansion and/or replacement in areas to be remodeled. no change to occupancy | $95,000 | |
| Jan 30, 2020 | Completed final sign-off Oct 2020 | 625 47th Av | Kadon Construction | replacement of one full bahtroom. expansion of 49 sq feet of conditioned space into existing garage, new lighting electrical and plumbing on ground floor.Details
replacement of one full bahtroom. expansion of 49 sq feet of conditioned space into existing garage, new lighting electrical and plumbing on ground floor. | $75,000 |
| Jan 21, 2020 | Expired or cancelled withdrawn Apr 2023 | 1145 Vallejo St | garage expansion, studio of reduction, alteration of front facade, three-story addition in rear of bldg, addition of one full bath. new windows in rear facade.Details
garage expansion, studio of reduction, alteration of front facade, three-story addition in rear of bldg, addition of one full bath. new windows in rear facade. | $200,000 | |
| Dec 31, 2019 | Completed final sign-off Jun 2023 | 4227 24th St | Straightedge Construction | interior & exterior alterations include adding one story to the (e) 2 story home,expanding of all floors toward rear property line, news and doors, three additional bathrooms, all new electrical, plumbing & heating systems upgraded structural work. no change to use or occupancy.Details
interior & exterior alterations include adding one story to the (e) 2 story home,expanding of all floors toward rear property line, news and doors, three additional bathrooms, all new electrical, plumbing & heating systems upgraded structural work. no change to use or occupancy. | $400,000 |
| Dec 7, 2016 | Completed final sign-off Mar 2018 | 3660 Jackson St | Van Acker Const Assoc Inc | removal of (e)window at 2 facade. in fill of (e)opening to match (e)brick. changes to east garden for sport court @ grade.Details
removal of (e)window at 2 facade. in fill of (e)opening to match (e)brick. changes to east garden for sport court @ grade. | $10,000 |
| Dec 2, 2014 | Completed final sign-off Apr 2018 | 3660 Jackson St | Clayton Timbrell & Co | interior alterations on all floors including renovation of all bathrooms, master suite, (n) mep. (n) structural work at foundation, garage, seismic upgrade, (n) roof @ garage, main roof, no change of use.Details
interior alterations on all floors including renovation of all bathrooms, master suite, (n) mep. (n) structural work at foundation, garage, seismic upgrade, (n) roof @ garage, main roof, no change of use. | $750,000 |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 542 03rd Av | Straightedge Construction | replace windows at front with marvin wood sash within existing opennings.Details
replace windows at front with marvin wood sash within existing opennings. | $3,500 |
| Jul 22, 2014 | Completed final sign-off Feb 2015 | 542 03rd Av | Straightedge Construction | interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind.Details
interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind. | $96,500 |
| Feb 7, 2014 | Expired or cancelled expired May 2017 | 625 47th Av | Straightedge Construction, Schrobsdorff Construction | remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing.Details
remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing. | $150,000 |
| Mar 5, 2012 | Completed final sign-off May 2012 | 1745 Stockton St | Kelly Brother's Construction | new gate enclosures, decorative ceiling at breezeway. new safety and path lightingDetails
new gate enclosures, decorative ceiling at breezeway. new safety and path lighting | $5,000 |
| Nov 21, 2011 | Completed final sign-off Dec 2012 | 1019 Church St | Kasten Builders/Creative Contr.Of Calif, Kelly Brother's Construction | remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnaceDetails
remodel bathroom, add bay windows to rear, structural work in garage, new interior stairs, relocate water heater & furnace | $119,000 |