Baracke Dba Infinity Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Dec 2023
- Last 24 months
- 0 permits filed
50 permits since 2000: 41 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2023 | Expired or cancelled expired Jan 2026 | 763 Ulloa St | rev to pa 2023-0516-7900: revise width of window #3, not street visible.Details
rev to pa 2023-0516-7900: revise width of window #3, not street visible. | |
| May 16, 2023 | Expired or cancelled expired Jan 2026 | 763 Ulloa St | remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study roomDetails
remodel (e) 850 sf of ground floor space, relocate laundry & bathroom. no change in fixture count, alter windows, non visible from street. provide voluntary plywood sht'g & epoxy set anchor bolts to opened walls. convert rec room to bedroom, add study room | $80,000 |
| May 2, 2023 | Completed final sign-off Oct 2023 | 2211 28th Av | in-kind remodel of bathroom and kitchen. add bath tub in bathroomDetails
in-kind remodel of bathroom and kitchen. add bath tub in bathroom | $30,000 |
| Apr 17, 2023 | Completed final sign-off May 2023 | 1461 Chestnut St | permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side,Details
permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side, | $12,000 |
| Dec 30, 2022 | Completed final sign-off Dec 2023 | 105 Yale St | remove load bearing wall bewteen kitchen & living room, remodel kitchen & (2) bathroomsDetails
remove load bearing wall bewteen kitchen & living room, remodel kitchen & (2) bathrooms | $55,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | replace (7) windows & (1) sliding door. windows are visible on the side.Details
replace (7) windows & (1) sliding door. windows are visible on the side. | $9,000 |
| Dec 8, 2022 | Completed final sign-off Feb 2023 | 811 Moultrie St | revision to 202210255109: remodel 3 fixture bathroom, relocate fixtures. relocate laundry. demo 1 window, add 1 window, reduction of glazing area. (invisible from st)Details
revision to 202210255109: remodel 3 fixture bathroom, relocate fixtures. relocate laundry. demo 1 window, add 1 window, reduction of glazing area. (invisible from st) | |
| Dec 7, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30.Details
replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30. | $1,200 |
| Dec 1, 2022 | Completed final sign-off Apr 2023 | 2077 Jackson St | 1)bathroom remodel changing shower locations. 2)bathroom remodel changing tub location. 3)kitchen remodel like to like inkind.4)heating system. 5)changing hardwood floor. 6)rewiring whole house.Details
1)bathroom remodel changing shower locations. 2)bathroom remodel changing tub location. 3)kitchen remodel like to like inkind.4)heating system. 5)changing hardwood floor. 6)rewiring whole house. | $50,000 |
| Nov 29, 2022 | Completed final sign-off Jan 2023 | 126 Cayuga Av | remodel kitchen like for like to comply with pa #2022 0216 8097Details
remodel kitchen like for like to comply with pa #2022 0216 8097 | $12,000 |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 505 Joost Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $14,000 |
| Nov 14, 2022 | Never finaled issued Nov 2022, no final | 1181 York St | revision of 202205265036 adequately depict work & (e) condition, work descript of 202205265035 "retrofit foundation" work description: provide collyndr structrual strengthening to (e) lowest fl to included replace 3 pier 16' of (n) concrete fle (n) concrete slab & plywood shearwallsDetails
revision of 202205265036 adequately depict work & (e) condition, work descript of 202205265035 "retrofit foundation" work description: provide collyndr structrual strengthening to (e) lowest fl to included replace 3 pier 16' of (n) concrete fle (n) concrete slab & plywood shearwalls | |
| Oct 25, 2022 | Completed final sign-off Feb 2023 | 811 Moultrie St | in kind remodeling 1 bathroom. in kind remodeling 1 laundry.Details
in kind remodeling 1 bathroom. in kind remodeling 1 laundry. | $15,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | revision to pa 2020-0830-1577 kitchen: remove 1 partition wall & move appliances; bathroom: remove 1 partition walls; extend other partition wall by 2 ft, closed 2 doors to bathroom, added 1 door, moved toilet, sink, closed 1 window, replaced 1 window; converted bath to shower.Details
revision to pa 2020-0830-1577 kitchen: remove 1 partition wall & move appliances; bathroom: remove 1 partition walls; extend other partition wall by 2 ft, closed 2 doors to bathroom, added 1 door, moved toilet, sink, closed 1 window, replaced 1 window; converted bath to shower. | |
| Aug 30, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | revision to pa# 202205063708. revise before and after plan removing partiton wall between kitchen and living room, replace two windows in kind, not visible from street.Details
revision to pa# 202205063708. revise before and after plan removing partiton wall between kitchen and living room, replace two windows in kind, not visible from street. | $20,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unitDetails
remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unit | $20,000 |
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 814 Hayes St | unit 1: amend to pa202206136152 for additional work. remodel of 2 (e) bathrooms. in kind. no structural work. replace all flooring. rewiring entire house. no additional alteration of wall, window or door. ledDetails
unit 1: amend to pa202206136152 for additional work. remodel of 2 (e) bathrooms. in kind. no structural work. replace all flooring. rewiring entire house. no additional alteration of wall, window or door. led | $30,000 |
| Jul 27, 2022 | Completed final sign-off Sep 2022 | 2017 19th St | bathroom in kind renovation, it contains electrical & plumbing works like to like. replace all tiles, replace shower pan, replace toilet, replace sink.Details
bathroom in kind renovation, it contains electrical & plumbing works like to like. replace all tiles, replace shower pan, replace toilet, replace sink. | $22,000 |
| Jul 25, 2022 | Completed final sign-off Oct 2022 | 1200 Rhode Island St | remodeling kitchen: and replacing cabinets, new tile, new sink , new lights, remodeling new baths: deplacing tile new vanity and new tile. shower pan. remodel in kindDetails
remodeling kitchen: and replacing cabinets, new tile, new sink , new lights, remodeling new baths: deplacing tile new vanity and new tile. shower pan. remodel in kind | $55,543 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | (1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings.Details
(1) 50 sq ft 3/4-bath on ground floor, in-kind. replace (e) with new curbless shower, toilet, vanity. all new fixtures and finishes. no structural, no changes to walls or openings. | $14,500 |
| Jun 30, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | (1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings.Details
(1) 35 sq ft hall bath on 2nd floor. replace extg with new tub/shower, toilet/bidet, and replace extg with new fixtures and finishes. no structural no changes to walls or openings. | $14,500 |
| Jun 16, 2022 | Completed final sign-off Feb 2023 | 1040 Filbert St | kitchen and two bathrooms remodel, like for like. no structural work and no change to wall layout or floor plan. replace tiles, cabinets, vanities in kind.Details
kitchen and two bathrooms remodel, like for like. no structural work and no change to wall layout or floor plan. replace tiles, cabinets, vanities in kind. | $97,250 |
| Jun 13, 2022 | Completed final sign-off Sep 2024 | 814 Hayes St | unit #1: remodel kitchen. delete half bath (toilet & sink). modify guardrails at mezzanine. add door at entry within non-bearing wall. replace all windows & skylights at same size & location. tankless water heater. new hydronic radiant heat and flooring throughout.Details
unit #1: remodel kitchen. delete half bath (toilet & sink). modify guardrails at mezzanine. add door at entry within non-bearing wall. replace all windows & skylights at same size & location. tankless water heater. new hydronic radiant heat and flooring throughout. | $75,000 |
| Jun 7, 2022 | Completed final sign-off Mar 2023 | 57 Martha Av | one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings.Details
one 41 sqft master bathroom on 2nd fl in-kind remodel. replace (e) with (n) curbless shower toilet/ bidet, single vanity. all (e) fixtures + finishes. no structural. no change to walls or openings. | $14,500 |
| May 26, 2022 | Never finaled issued Jun 2022, no final | 1181 York St | retrofit foundationDetails
retrofit foundation | $17,000 |
| May 6, 2022 | Never finaled issued May 2022, no final | 407 Clipper St | (2) bathroom remodel like for like. non structural.Details
(2) bathroom remodel like for like. non structural. | $67,000 |
| May 6, 2022 | Completed final sign-off Dec 2022 | 2039 Green St | 1 kitchen remodel and 1 full bath remodel. non structural.Details
1 kitchen remodel and 1 full bath remodel. non structural. | $56,600 |
| Apr 18, 2022 | Completed final sign-off Oct 2025 | 1741 Stockton St | 1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas.Details
1st flr - lower grade, (n) door & windows at facade w/ (n) sunken patio. 2nd flr - 1 story ltwell in-fill, remodel 1 bath, add 1 full bath, relocate laundry. 3rd flr - kitchen remodel w/ bar, full bath remodel, replace 1 window. (n) electrical & plumbing at construction areas. | $75,000 |
| Mar 15, 2022 | Completed final sign-off Feb 2023 | 1371 Masonic Av | remodel 600 sq ft of interior space primarily consisting of 1 kitchen, 1 full bath, and 1 1/2 bath. 1 north lightwell window being replaced(not visible from the street) new ceiling joists being added to allow partial bearing wall removal.Details
remodel 600 sq ft of interior space primarily consisting of 1 kitchen, 1 full bath, and 1 1/2 bath. 1 north lightwell window being replaced(not visible from the street) new ceiling joists being added to allow partial bearing wall removal. | $60,000 |
| Mar 11, 2022 | Completed final sign-off Nov 2022 | 1639 18th St | 1 kitchen remodel - like to likeDetails
1 kitchen remodel - like to like | $15,000 |
| Mar 11, 2022 | Completed final sign-off Aug 2022 | 166 Sylvan Dr | 1 kitchen renovation.Details
1 kitchen renovation. | $49,000 |
| Mar 11, 2022 | Completed final sign-off Sep 2023 | 2104 23rd St | one bathroom remodel and floor refinish (like to like). non structuralDetails
one bathroom remodel and floor refinish (like to like). non structural | $16,000 |
| Mar 11, 2022 | Completed final sign-off Sep 2022 | 976 Clayton St | kitchen & bathroom remodel/renovation.Details
kitchen & bathroom remodel/renovation. | $16,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 126 Cayuga Av | bathroom remodel. like for like. @ 1st floor.Details
bathroom remodel. like for like. @ 1st floor. | $31,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 578 16th Av | kitchen renovation - like to like and bathroom renovation remodel. unit 580.Details
kitchen renovation - like to like and bathroom renovation remodel. unit 580. | $60,000 |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 63 Lafayette St | unit #5: bathroom remodel - like to likeDetails
unit #5: bathroom remodel - like to like | $12,500 |
| Jan 12, 2022 | Completed final sign-off Mar 2022 | 338 20th Av | bathroom remodel, like for like. one bathroom. no structural modifications. comply w/cec 150Details
bathroom remodel, like for like. one bathroom. no structural modifications. comply w/cec 150 | $25,500 |
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 166 Sylvan Dr | (1) bathroom remodelDetails
(1) bathroom remodel | $49,000 |
| Dec 22, 2021 | Completed final sign-off May 2022 | 2733 Harrison St | bathroom remodeling. no structural work. no wall /framing modification.Details
bathroom remodeling. no structural work. no wall /framing modification. | $20,000 |
| Nov 4, 2021 | Expired or cancelled expired Feb 2025 | 2781 Filbert St | one kitchen and one bathroom remodel, like to like. rewire. non structural.Details
one kitchen and one bathroom remodel, like to like. rewire. non structural. | $60,000 |
| Nov 4, 2021 | Completed final sign-off Apr 2022 | 959 Corbett Av | apt 11: one bathroom remodel, like to like.Details
apt 11: one bathroom remodel, like to like. | $9,000 |
| Nov 4, 2021 | Completed final sign-off Feb 2022 | 1015 Carolina St | one bathroom remodeling - like to like. counter top replacement.Details
one bathroom remodeling - like to like. counter top replacement. | $14,000 |
| Oct 28, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room.Details
revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room. | |
| Oct 28, 2021 | Completed final sign-off Feb 2022 | 225 Mullen Av | remodel bathroom and wet bar. like for like, non structural. flooring vinyl 400sf. paint interior.Details
remodel bathroom and wet bar. like for like, non structural. flooring vinyl 400sf. paint interior. | $22,000 |
| Oct 18, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | 1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/dDetails
1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/d | $82,000 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 1118 Eddy St | unit c: kitchen remodeling like to like. remodel 2.5 bathrooms like to like. rewire entire dwelling unit. patch walls and ceilings opened up for re-wire with in kind materials. maintain fire ratings.Details
unit c: kitchen remodeling like to like. remodel 2.5 bathrooms like to like. rewire entire dwelling unit. patch walls and ceilings opened up for re-wire with in kind materials. maintain fire ratings. | $80,000 |
| Sep 24, 2021 | Completed final sign-off Jun 2022 | 1095 Pacheco St | bathroom remodeling like to like. upgrade plumbing and electricalDetails
bathroom remodeling like to like. upgrade plumbing and electrical | $7,500 |
| Sep 16, 2021 | Completed final sign-off Jun 2022 | 1821 Stockton St | add a bathroom to the (e) laundry area & skylight on flat roof. converting closet to laundry room. redesigning closet in bedroom.Details
add a bathroom to the (e) laundry area & skylight on flat roof. converting closet to laundry room. redesigning closet in bedroom. | $30,000 |
| Feb 10, 2021 | Completed final sign-off Feb 2024 | 711 46th Av | 1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor.Details
1st story infill under 2nd story portion at rear. remodel master suite & bedroom at 2nd story. add interior stair. add family room at 1st floor. remodel bedroom, bathroom & laundry at 1st floor. | $148,000 |
| May 1, 2018 | Never finaled issued Jun 2023, no final | 2755 Harrison St | permit to comply w/ nov #201396191 legalize an illegal unit in basementDetails
permit to comply w/ nov #201396191 legalize an illegal unit in basement | $85,000 |