Block 6555, lot 048
407 Clipper St
- City’s use
- Multi-Family Residential
- Built
- 1890
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,988 sq ft
- Lot
- 3,001 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | replace (7) windows & (1) sliding door. windows are visible on the side.Details
replace (7) windows & (1) sliding door. windows are visible on the side. | $9,000 |
| Dec 7, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30.Details
replace window in bathroom in-kind. not visible from street. same size, same location, max u-factor 0.30. | $1,200 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 407 Clipper St | Baracke Dba Infinity Construction | remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unitDetails
remodeling kitchen - will have dishwasher, sink, cabinets: rewiring entire unit | $20,000 |
| May 6, 2022 | Never finaled issued May 2022, no final | 407 Clipper St | Baracke Dba Infinity Construction | (2) bathroom remodel like for like. non structural.Details
(2) bathroom remodel like for like. non structural. | $67,000 |
| Jun 5, 2020 | Never finaled issued Sep 2020, no final | 407 Clipper St | Eol Builders | demolish and rebuild exterior retaining wallDetails
demolish and rebuild exterior retaining wall | $30,000 |
| Apr 29, 2019 | Never finaled issued Feb 2020, no final | 407 Clipper St | Eol Builders, Adu Builders | interior remodel, no change in floor area. back facade to be replaced. site improvement to front yard.Details
interior remodel, no change in floor area. back facade to be replaced. site improvement to front yard. | $150,000 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 407 Clipper St | street spaceDetails
street space | ||
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 407 Clipper St | Kashaneh Construction | interior exploratory openings at walls/ceiling to be observed by engineer, at local room locations, max 100 sq. ft. total, opening/patch back to original finishesDetails
interior exploratory openings at walls/ceiling to be observed by engineer, at local room locations, max 100 sq. ft. total, opening/patch back to original finishes | $4,000 |
| Oct 28, 2011 | Completed final sign-off Dec 2011 | 407 Clipper St | front stair lower porting below mid platform seven steps, stringer and the stucco wall are dryrotted. the stringers, stairs and stucco walls, need to be repaired or replaced in kind - less than 50%Details
front stair lower porting below mid platform seven steps, stringer and the stucco wall are dryrotted. the stringers, stairs and stucco walls, need to be repaired or replaced in kind - less than 50% | $6,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.