Rishab Gakhar
- License
- C94497
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C94497 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Calseven Consultants
- Based in
- Elk Grove
- On San Francisco permits
- Nov 2025 to Oct 2026
5 permits since 2000 (engineer on 5 permits): 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- American Building Development (3), Mora Architect Construction
- Architects
- Patrick Mora
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 14, 2026 | In progress filed Oct 2026, not yet issued | 407 Clipper St | American Building Development | existing main floor interior remodel. upper floor addition (bedroom# 3, bedroom# 4 (master suite, 2 full bathrooms, den / lot area, meditation room) propose proposes the addition of 3rd story to and (e) 2 story, 2 family dawelling.Details
existing main floor interior remodel. upper floor addition (bedroom# 3, bedroom# 4 (master suite, 2 full bathrooms, den / lot area, meditation room) propose proposes the addition of 3rd story to and (e) 2 story, 2 family dawelling. | $300,000 |
| Oct 7, 2026 | In progress issued Nov 2026 | 3520 21st St | American Building Development | remove and replace (e) deck sheathing with new 3/4" plywood sheathing. remove and replace (e) concrete decking with new westcoat pro alx waterproofing. remove and replace (e) guard railing with new guard railing. like for like.Details
remove and replace (e) deck sheathing with new 3/4" plywood sheathing. remove and replace (e) concrete decking with new westcoat pro alx waterproofing. remove and replace (e) guard railing with new guard railing. like for like. | $27,952 |
| Jul 13, 2026 | In progress issued Aug 2026 | 2222 Vallejo St | American Building Development | balcony appx 90sf corrosion and rust repair. remove and replace (e) balcony framing with (n) balcony framing, remove and replace (e) concrete deck with (n) westcoat pro waterproofing and plywood sheating. remove , reuse, and repaint (e) balcony railingDetails
balcony appx 90sf corrosion and rust repair. remove and replace (e) balcony framing with (n) balcony framing, remove and replace (e) concrete deck with (n) westcoat pro waterproofing and plywood sheating. remove , reuse, and repaint (e) balcony railing | $50,360 |
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 1150 Gilman Av | comply nov20180922.provide stair access to rear yard fr main unit of 1/f. provide 1hr sep btwn units.change back unpermitted pitched to flat roof.reconfig entry stair.minor alt on 2/f main unit. legalize (e) unit on g/f per ord no. 43-14Details
comply nov20180922.provide stair access to rear yard fr main unit of 1/f. provide 1hr sep btwn units.change back unpermitted pitched to flat roof.reconfig entry stair.minor alt on 2/f main unit. legalize (e) unit on g/f per ord no. 43-14 | $237,000 | |
| Nov 17, 2025 | In progress filed Nov 2025, not yet issued | 1342 Gilman Av | Mora Architect Construction | comply nov202071694: convert udu to adu on 1/f ca 65852.2. demo (e) wetbar in rear of garage.provide 1hr sep to unit, floor/ceilig and garage partition and sep heating/electrical to unit.remove (e) ext stairs and construct (n) to rear yard. legalize addition on 2/f.Details
comply nov202071694: convert udu to adu on 1/f ca 65852.2. demo (e) wetbar in rear of garage.provide 1hr sep to unit, floor/ceilig and garage partition and sep heating/electrical to unit.remove (e) ext stairs and construct (n) to rear yard. legalize addition on 2/f. | $222,000 |