Block 0497, lot 009A
1461 Chestnut St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 3,544 sq ft
- Lot
- 3,425 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 11, 2024 | Completed final sign-off Feb 2026 | 1461 Chestnut St | Diego Nieva | work in #1461: conversion of g/f storage to family room serving rear yard. new 3/4 bath, replace west window, replace southern window w/ new slider & new header, delete window in passageway. new electrical & mech under separate permit.Details
work in #1461: conversion of g/f storage to family room serving rear yard. new 3/4 bath, replace west window, replace southern window w/ new slider & new header, delete window in passageway. new electrical & mech under separate permit. | $20,000 |
| Apr 17, 2023 | Completed final sign-off May 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side,Details
permit set of decks rebuilt in-kind w/out permit. decks 2 levels @66 sf ea. replace decking, joists, guard posts, &attachment to bldg. all in place but at ea level: 1 added holdown &blking for guard 4x4post. added timber scrws &a23 guard connection to bldg each side, | $12,000 |
| May 31, 2022 | Expired or cancelled withdrawn Apr 2023 | 1461 Chestnut St | permit a deck that was rebuilt in-kind w/out permit. decks are 2 level @ 665 sf each; scope includes replacement of decking, joists, guards & posts and attacment to bldg. all work in in place but additional added items of 1 added hold down & blkg for 4x4 guard post; added timber screws & a23 clipsDetails
permit a deck that was rebuilt in-kind w/out permit. decks are 2 level @ 665 sf each; scope includes replacement of decking, joists, guards & posts and attacment to bldg. all work in in place but additional added items of 1 added hold down & blkg for 4x4 guard post; added timber screws & a23 clips | $12,000 | |
| Oct 28, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room.Details
revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room. | |
| Oct 18, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | 1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/dDetails
1st fl unit 1461: convert closet to powder rm. convert 1 powder rm to install w/d. build 1 (n) closet in bedroom. remodel (e) kitchen and bath. 2nd fl unit 1463: convert 1 closet to bath, remodel kitchen and bathroom. install w/d | $82,000 |
| Feb 11, 2020 | Expired or cancelled cancelled Jun 2023 | 1461 Chestnut St | Super Roofing Company | reroofingDetails
reroofing | $12,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Baracke Dba Infinity Construction (3), Diego Nieva, Super Roofing Company
- Architects
- Brent Mcdonald (3)
- Authorized agent-otherss
- Danielle Bohnik
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.