113 permits since 2000 (contractor on 111 permits, authorized agent-others on 7 permits): 86 completed, 22 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 113.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2022 | Completed final sign-off Jan 2025 | 341 Crestmont Dr | Jc Construction, Bassad Inc./Dba: Everlast Construction | remodel at 341-343 crestmont: lower level(343): new sheetrock throughout. remove and replace some int. walls. install insul. at ext walls. replace all elec. mech. remodel kitchen. remodel 2 bathrooms and add one bathroomDetails
remodel at 341-343 crestmont: lower level(343): new sheetrock throughout. remove and replace some int. walls. install insul. at ext walls. replace all elec. mech. remodel kitchen. remodel 2 bathrooms and add one bathroom | $28,000 |
| Oct 28, 2021 | Completed final sign-off Jun 2023 | 1461 Chestnut St | Baracke Dba Infinity Construction | revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room.Details
revision to bpa#202110180616.1461 chestnut st:bathroom: closing one door & opening ahother. relocate tub. master bathroom: single sink to doulble. instead of powder room, laundry room. | |
| Sep 24, 2021 | Completed final sign-off Nov 2021 | 15 Vasquez Av | Bassad Inc./Dba: Everlast Construction | replace insulatio, drywall and epoxy floor at the garage. add 6 outlets and recessed lights. 400 sqft.Details
replace insulatio, drywall and epoxy floor at the garage. add 6 outlets and recessed lights. 400 sqft. | $13,500 |
| Sep 24, 2021 | Completed final sign-off Jun 2022 | 1095 Pacheco St | Baracke Dba Infinity Construction, Bassad Inc./Dba: Everlast Construction | bathroom remodeling like to like. upgrade plumbing and electricalDetails
bathroom remodeling like to like. upgrade plumbing and electrical | $7,500 |
| Aug 30, 2021 | Never finaled filed Aug 2021, never issued | 167 07th Av | Bassad Inc./Dba: Everlast Construction | new deck at rear 24 x 36Details
new deck at rear 24 x 36 | $19,500 |
| Aug 24, 2021 | Completed final sign-off Nov 2021 | 70 Sanchez St | Bassad Inc./Dba: Everlast Construction | 1/f: convert closet to bathroom: install toilet, vanity shower pan, exhaust fan, & 2 recessed lightsDetails
1/f: convert closet to bathroom: install toilet, vanity shower pan, exhaust fan, & 2 recessed lights | $8,000 |
| Jul 29, 2021 | Never finaled issued Jul 2021, no final | 772 Noe St | Bassad Inc./Dba: Everlast Construction | bath remodel like to like: 2 bathrooms: non structuralDetails
bath remodel like to like: 2 bathrooms: non structural | $7,000 |
| Jul 29, 2021 | Completed final sign-off Jan 2022 | 3344 21st St | Bassad Inc./Dba: Everlast Construction | 1 & 1/2 bath remodel. convert tub to walk in shower, add toiletDetails
1 & 1/2 bath remodel. convert tub to walk in shower, add toilet | $9,500 |
| Jun 25, 2021 | Never finaled issued Sep 2021, no final | 815 40th Av | Sonny Builders Inc | replace wooden stairs in rearDetails
replace wooden stairs in rear | $20,000 |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 552 Roosevelt Wy | Bassad Inc./Dba: Everlast Construction | one bathroom remodeling like for like, convert tub to steam shower. no structural.Details
one bathroom remodeling like for like, convert tub to steam shower. no structural. | $15,000 |
| Jun 7, 2021 | Completed final sign-off Feb 2022 | 2708 Pine St | Bassad Inc./Dba: Everlast Construction | adding a bathroom at the living room. install toilet, walk-in shower and vanity. add recessed lights. replacing a tub at the (e) bathroom.Details
adding a bathroom at the living room. install toilet, walk-in shower and vanity. add recessed lights. replacing a tub at the (e) bathroom. | $17,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2021 | 73 Sumner St | Bassad Inc./Dba: Everlast Construction | one bathroom and one kitchen remodeling - like for like. non structuralDetails
one bathroom and one kitchen remodeling - like for like. non structural | $19,000 |
| May 18, 2021 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | one bathroom remodel like to like. non-structural. no change of layout.Details
one bathroom remodel like to like. non-structural. no change of layout. | $7,000 |
| May 18, 2021 | Never finaled issued May 2021, no final | 555 Junipero Serra Bl | Bassad Inc./Dba: Everlast Construction | bathroom remodel like to like. no change to layout or wall/opening.Details
bathroom remodel like to like. no change to layout or wall/opening. | $7,000 |
| May 3, 2021 | Completed final sign-off Jun 2021 | 82 Lippard Av | Bassad Inc./Dba: Everlast Construction | kitchen remodeling - like for like. add 4 recessed lights , relocate refrigerator .Details
kitchen remodeling - like for like. add 4 recessed lights , relocate refrigerator . | $14,000 |
| Apr 22, 2021 | Completed final sign-off Jun 2021 | 799 La Playa | Bassad Inc./Dba: Everlast Construction | remodel bathroom: like for like, in-kind.Details
remodel bathroom: like for like, in-kind. | $7,000 |
| Apr 21, 2021 | Completed final sign-off Jan 2023 | 388 Dolores St | Bassad Inc./Dba: Everlast Construction | remove load bearing wall, relocate bedroom door, kitcen remodelDetails
remove load bearing wall, relocate bedroom door, kitcen remodel | $27,000 |
| Apr 9, 2021 | Completed final sign-off Jul 2021 | 167 07th Av | Bassad Inc./Dba: Everlast Construction | 2 bathrooms remodel in-kind. no new wall no exisitng wall relocation. fixtures to be remain the same location. new lighting comply w/ cec 150.1 (k) 5Details
2 bathrooms remodel in-kind. no new wall no exisitng wall relocation. fixtures to be remain the same location. new lighting comply w/ cec 150.1 (k) 5 | $14,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 28 El Sereno Ct | Bassad Inc./Dba: Everlast Construction | revision to bpa#202102114458, reduction of scope of work, (1) bathroom remodel like-to-likeDetails
revision to bpa#202102114458, reduction of scope of work, (1) bathroom remodel like-to-like | |
| Feb 17, 2021 | Expired or cancelled cancelled Dec 2021 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | unit legalization per ordinace 43-Details
unit legalization per ordinace 43- | |
| Feb 11, 2021 | Completed final sign-off Aug 2021 | 28 El Sereno Ct | Bassad Inc./Dba: Everlast Construction | kitchen remodeling like to like. 2 bathrooms remodeling like to like. rewire and upgrade electric panel to 200 amp.Details
kitchen remodeling like to like. 2 bathrooms remodeling like to like. rewire and upgrade electric panel to 200 amp. | $42,000 |
| Feb 11, 2021 | Never finaled issued Feb 2021, no final | 254 Dublin St | Bassad Inc./Dba: Everlast Construction | bathroom remodeling like to like. add 3 recessed lights.Details
bathroom remodeling like to like. add 3 recessed lights. | $8,000 |
| Jan 13, 2021 | Never finaled issued Jan 2021, no final | 241 Downey St | Bassad Inc./Dba: Everlast Construction | bathroom remodel, like for like.Details
bathroom remodel, like for like. | $8,000 |
| Jan 6, 2021 | Completed final sign-off Apr 2021 | 2359 Jackson St | Bassad Inc./Dba: Everlast Construction | unit #3: administrative permit - reference to pa #202010206931 - work shall occur in unit #3, not unit #4Details
unit #3: administrative permit - reference to pa #202010206931 - work shall occur in unit #3, not unit #4 | |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 239 23rd Av | Bassad Inc./Dba: Everlast Construction | bathroom remodeling. convert tub to a walk showerDetails
bathroom remodeling. convert tub to a walk shower | $8,000 |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 4279 22nd St | Bassad Inc./Dba: Everlast Construction | bathroom remodel - convert tub to a walk in showerDetails
bathroom remodel - convert tub to a walk in shower | $8,000 |
| Dec 2, 2020 | Completed final sign-off Jan 2021 | 606 Kansas St | Bassad Inc./Dba: Everlast Construction | bathroom remodeling: convert tub to a walk-in shower.Details
bathroom remodeling: convert tub to a walk-in shower. | $8,000 |
| Dec 2, 2020 | Completed final sign-off Feb 2021 | 1433 Balboa St | Bassad Inc./Dba: Everlast Construction | bathroom remodeling convert tub into a walk-in shower.Details
bathroom remodeling convert tub into a walk-in shower. | $8,000 |
| Nov 6, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | install plywood sheathing on first floor and garage portal frame, install water heater seismic strap and gas meter seismic shutoff valve.Details
install plywood sheathing on first floor and garage portal frame, install water heater seismic strap and gas meter seismic shutoff valve. | $41,000 |
| Nov 6, 2020 | Expired or cancelled cancelled Jan 2026 | 6446 Geary Bl | Bassad Inc./Dba: Everlast Construction | remove window and install new door at window location. existing header to remain. install 4ft glass shield on top of existing railing.Details
remove window and install new door at window location. existing header to remain. install 4ft glass shield on top of existing railing. | $8,500 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 4038 Folsom St | Bassad Inc./Dba: Everlast Construction | bathroom remodeling like for like. adding 4 recessed lightsDetails
bathroom remodeling like for like. adding 4 recessed lights | $10,500 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 2359 Jackson St | Bassad Inc./Dba: Everlast Construction | bathroom and kitchen remodeling. like to like. add 4 recessed lights at the bathroom. tankless water heater. relocate the washer and dryer. rewireDetails
bathroom and kitchen remodeling. like to like. add 4 recessed lights at the bathroom. tankless water heater. relocate the washer and dryer. rewire | $42,500 |
| Sep 9, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | replacement of 9 windows and sliding door. existing and proposed aluminum windows.Details
replacement of 9 windows and sliding door. existing and proposed aluminum windows. | $10,100 |
| Sep 9, 2020 | Completed final sign-off Feb 2021 | 1059 Oak St | Bassad Inc./Dba: Everlast Construction | kitchen & bath remodeling like for like, no structural work.Details
kitchen & bath remodeling like for like, no structural work. | $38,000 |
| Sep 1, 2020 | Completed final sign-off Jan 2021 | 6446 Geary Bl | Bassad Inc./Dba: Everlast Construction | bathroom remodeling/unit 3.Details
bathroom remodeling/unit 3. | $12,000 |
| Sep 1, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement.Details
complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement. | $101,720 |
| Jan 23, 2020 | Completed final sign-off Jun 2020 | 412 College Av | Bassad Inc./Dba: Everlast Construction | window replacement - like for like within the existing openings 23 windows total - at the front façade windows will be replaced in kind - wood to wood having three over one divided lites to match google-photo dated 2019Details
window replacement - like for like within the existing openings 23 windows total - at the front façade windows will be replaced in kind - wood to wood having three over one divided lites to match google-photo dated 2019 | $5,000 |
| Sep 19, 2019 | Completed final sign-off Jun 2020 | 412 College Av | Bassad Inc./Dba: Everlast Construction | kitchen remodel: close 2nd door to the basement. remodel extg kitchen, close 2 windows. remove walls according to the plan.relocate sink to island, install outlet on the island. replace cook top with gas line.Details
kitchen remodel: close 2nd door to the basement. remodel extg kitchen, close 2 windows. remove walls according to the plan.relocate sink to island, install outlet on the island. replace cook top with gas line. | $40,000 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 412 College Av | Bassad Inc./Dba: Everlast Construction | furnace replacement, repipe only water pipes, replace water heater to tanklessDetails
furnace replacement, repipe only water pipes, replace water heater to tankless | $15,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2019 | 53 Oakwood St | Bassad Inc./Dba: Everlast Construction | rev to pa# 201908138660; to replace 2 pocket door into a french door (interior) w/ transomDetails
rev to pa# 201908138660; to replace 2 pocket door into a french door (interior) w/ transom | |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 412 College Av | Bassad Inc./Dba: Everlast Construction | bathroom remodeling in-kind on 2/f. rewiring electrical up to code. no wall removal or modifications. layout remains unchanged.Details
bathroom remodeling in-kind on 2/f. rewiring electrical up to code. no wall removal or modifications. layout remains unchanged. | $34,000 |
| Aug 13, 2019 | Completed final sign-off Oct 2019 | 53 Oakwood St | Bassad Inc./Dba: Everlast Construction | remove and replace bedroom door like for like. adding lighting and replace valve.Details
remove and replace bedroom door like for like. adding lighting and replace valve. | $10,000 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 1549 Beach St | Bassad Inc./Dba: Everlast Construction | convert closet to toielet and sink (powder room)Details
convert closet to toielet and sink (powder room) | $5,000 |
| Jul 29, 2019 | Completed final sign-off Oct 2019 | 412 College Av | Bassad Inc./Dba: Everlast Construction | retrofit (e) walls for dry rot repair in garageDetails
retrofit (e) walls for dry rot repair in garage | $7,000 |
| Jul 25, 2019 | Completed final sign-off Nov 2019 | 931 Sanchez St | Bassad Inc./Dba: Everlast Construction | exploratory demo on balcony floor / tile to observe water damage to structural framing. submit separate permit for repair.Details
exploratory demo on balcony floor / tile to observe water damage to structural framing. submit separate permit for repair. | $600 |
| Jul 5, 2019 | Completed final sign-off Jun 2021 | 146 Saint Charles Av | Bassad Inc./Dba: Everlast Construction | to comply w/ #201866361 (1) (n) adu per ord #95-17. remodel basement to become liveable area. install bathroom, bedroom, & office w/ all electrical & plumbing neccessary. install window for bedroom escape.Details
to comply w/ #201866361 (1) (n) adu per ord #95-17. remodel basement to become liveable area. install bathroom, bedroom, & office w/ all electrical & plumbing neccessary. install window for bedroom escape. | $60,000 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 180 07th St | Bassad Inc./Dba: Everlast Construction | (2) bathroom remodel like for like (no change of existing floor plan)Details
(2) bathroom remodel like for like (no change of existing floor plan) | $8,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 369 18th Av | Bassad Inc./Dba: Everlast Construction | bathroom remodeling - changing tub to showerDetails
bathroom remodeling - changing tub to shower | $5,000 |
| May 29, 2019 | Completed final sign-off Aug 2019 | 273 Lexington St | Bassad Inc./Dba: Everlast Construction | apt b. replace 2 skylights in kind.Details
apt b. replace 2 skylights in kind. | $2,000 |
| May 24, 2019 | Completed final sign-off Dec 2019 | 2415 Van Ness Av | Bassad Inc./Dba: Everlast Construction | bathroom remodel - changing tub to shower rewiring electrical up to code, replacing kitchen counter top, adding lights. no wall removal.Details
bathroom remodel - changing tub to shower rewiring electrical up to code, replacing kitchen counter top, adding lights. no wall removal. | $30,000 |
| Apr 10, 2019 | Completed final sign-off Nov 2019 | 278 Ralston St | Bassad Inc./Dba: Everlast Construction | kitchen and bathroom rmeodel like for like. rewire entire house.Details
kitchen and bathroom rmeodel like for like. rewire entire house. | $25,000 |
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 855 Folsom St | Bassad Inc./Dba: Everlast Construction | kitchen & half-bath remodel, like for like. replacing countertop backsplash at kitchen, electrc-plumb for half-bath and master bath.Details
kitchen & half-bath remodel, like for like. replacing countertop backsplash at kitchen, electrc-plumb for half-bath and master bath. | $15,000 |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 443 Andover St | Bassad Inc./Dba: Everlast Construction | bathroom remodel like for like.Details
bathroom remodel like for like. | $5,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 400 Clayton St | Bassad Inc./Dba: Everlast Construction | remodel master bath, hallway bath & watercloset room.Details
remodel master bath, hallway bath & watercloset room. | $35,000 |
| Oct 16, 2018 | Completed final sign-off Jul 2019 | 81 Lansing St | Bassad Inc./Dba: Everlast Construction | bathroom remodeling- like for like. replacing tub with motor tub install all new features, 4-6 recessed lights, new dry wall, move the wall near the tub a few inches add new wall for niches.Details
bathroom remodeling- like for like. replacing tub with motor tub install all new features, 4-6 recessed lights, new dry wall, move the wall near the tub a few inches add new wall for niches. | $10,000 |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 236 Corbett Av | Bassad Inc./Dba: Everlast Construction | replace existing front door with of nearly identical design and construction.Details
replace existing front door with of nearly identical design and construction. | $2,000 |
| Feb 20, 2018 | Expired or cancelled expired Jan 2020 | 403 Broderick St | Mark Brockley Construction, Bassad Inc./Dba: Everlast Construction | to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry.Details
to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry. | $20,000 |
| Jan 25, 2018 | Completed final sign-off Oct 2018 | 273 Lexington St | Bassad Inc./Dba: Everlast Construction | revision to 201710040406: convert 2 closets into a 3/4 bathroom with shower, toilet, sink.Details
revision to 201710040406: convert 2 closets into a 3/4 bathroom with shower, toilet, sink. | $14,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 260 King St | Bassad Inc./Dba: Everlast Construction | 2 bathroom remodels like for likeDetails
2 bathroom remodels like for like | $12,000 |
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 4622 17th St | Bassad Inc./Dba: Everlast Construction | kitchen remodel like for likeDetails
kitchen remodel like for like | $18,000 |
| Dec 14, 2017 | Completed final sign-off Dec 2018 | 236 Corbett Av | Bassad Inc./Dba: Everlast Construction | replace four (4) existing, deteriorated wood double-hung windows to match with new all-wood double-hung windows (1-over-1, with ogee lug trim detail.); no change to rough opening; no work to surrounding window trim beyond spot-repair with wood filler as needed.Details
replace four (4) existing, deteriorated wood double-hung windows to match with new all-wood double-hung windows (1-over-1, with ogee lug trim detail.); no change to rough opening; no work to surrounding window trim beyond spot-repair with wood filler as needed. | $10,000 |
| Nov 7, 2017 | Completed final sign-off Jul 2018 | 221 Page St | Bassad Inc./Dba: Everlast Construction | bathroom remodel - replace tile on walls and floor, re-load shower head plumbing , replace vanity, install new switches in bathroom, install new light fixture, paint mater bathroom, upper unit.Details
bathroom remodel - replace tile on walls and floor, re-load shower head plumbing , replace vanity, install new switches in bathroom, install new light fixture, paint mater bathroom, upper unit. | $5,000 |
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 2444 Chestnut St | Bassad Inc./Dba: Everlast Construction | bathroom remodel like for like - replace vanity, replace 2 toilets, exhaust fan, light fixtures, shower; kitchen remodel like for like - replace cabinet doors & countertopDetails
bathroom remodel like for like - replace vanity, replace 2 toilets, exhaust fan, light fixtures, shower; kitchen remodel like for like - replace cabinet doors & countertop | $7,000 |
| Oct 4, 2017 | Completed final sign-off Oct 2018 | 273 Lexington St | Bassad Inc./Dba: Everlast Construction | apt b: bathroom 1:remodel, like for like -replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace tub. bathroom 2: remodel like for like - replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace shower.Details
apt b: bathroom 1:remodel, like for like -replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace tub. bathroom 2: remodel like for like - replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace shower. | $14,000 |
| Sep 13, 2017 | Expired or cancelled cancelled Nov 2017 | 825 25th Av | Bassad Inc./Dba: Everlast Construction | full bathroom remodel, everything stays in same location just being upgraded, new tub, new tile on walls & floors, new vanity, light fixts. no structural work.Details
full bathroom remodel, everything stays in same location just being upgraded, new tub, new tile on walls & floors, new vanity, light fixts. no structural work. | $13,900 |
| Aug 10, 2017 | Completed final sign-off Nov 2017 | 524 10th Av | Bassad Inc./Dba: Everlast Construction | 2nd fl: bathroom remodel/update fixtures & electrical. change fixtures. remove non-bearing wall in bathroom.Details
2nd fl: bathroom remodel/update fixtures & electrical. change fixtures. remove non-bearing wall in bathroom. | $25,000 |
| May 18, 2017 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | Bassad Inc./Dba: Everlast Construction | revision to 201611293698 legalize (e) laundry room to tv room. relocate in w/d to garage. ele outlet for exhaust fan. revision to 201701247783 - new flooring, casework, vanity, countertop, 3 sink for baths & tubs, 1 shower, remodel 2 baths, remove load bearing wall. remodelDetails
revision to 201611293698 legalize (e) laundry room to tv room. relocate in w/d to garage. ele outlet for exhaust fan. revision to 201701247783 - new flooring, casework, vanity, countertop, 3 sink for baths & tubs, 1 shower, remodel 2 baths, remove load bearing wall. remodel | $70,000 |
| Apr 26, 2017 | Completed final sign-off May 2017 | 6 Gerke Al | Bassad Inc./Dba: Everlast Construction | repair decking and some of the deck joists (less than 50%). not visible from the street.Details
repair decking and some of the deck joists (less than 50%). not visible from the street. | $7,500 |
| Jan 31, 2017 | Completed final sign-off May 2017 | 2159 47th Av | Bassad Inc./Dba: Everlast Construction | rev to pa#2017-0103-6428: revise foundation, revise (n) sliding door, remove storage room behind the building.Details
rev to pa#2017-0103-6428: revise foundation, revise (n) sliding door, remove storage room behind the building. | $20,000 |
| Jan 24, 2017 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | Bassad Inc./Dba: Everlast Construction | 2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layoutDetails
2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layout | $30,000 |
| Jan 12, 2017 | Completed final sign-off Feb 2017 | 1721 Cabrillo St | Bassad Inc./Dba: Everlast Construction | replacing the back windows of the house, 2xbedroom, 4xkitchen & living room. replacing existing heat/light/fan fixture with new fan/light. replacing handrail & decking at the back deck (12'x10'). like for like. deck framing to remain.Details
replacing the back windows of the house, 2xbedroom, 4xkitchen & living room. replacing existing heat/light/fan fixture with new fan/light. replacing handrail & decking at the back deck (12'x10'). like for like. deck framing to remain. | $8,000 |
| Jan 3, 2017 | Completed final sign-off May 2017 | 2159 47th Av | Bassad Inc./Dba: Everlast Construction | convert habitable space on garage floor. remove extg conc floor and new concrete floor 8' below ceiling.Details
convert habitable space on garage floor. remove extg conc floor and new concrete floor 8' below ceiling. | $20,000 |
| Dec 12, 2016 | Never finaled issued Dec 2016, no final | 4495 17th St | Bassad Inc./Dba: Everlast Construction | ref 201508073684. install new construction windows (vinyl) at new addition as shown in plans, replace 2 windows 2/f bathroom). u-factor 0.32 max.Details
ref 201508073684. install new construction windows (vinyl) at new addition as shown in plans, replace 2 windows 2/f bathroom). u-factor 0.32 max. | $2,400 |
| Nov 29, 2016 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | Bassad Inc./Dba: Everlast Construction | new bathroom floor tile, new tile walls,n ew tub instaltion, one recessed light above the tub, new lighting above the sink. install new fan. no change on walls.Details
new bathroom floor tile, new tile walls,n ew tub instaltion, one recessed light above the tub, new lighting above the sink. install new fan. no change on walls. | $4,000 |
| Nov 29, 2016 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | Bassad Inc./Dba: Everlast Construction | remodel interior stairway, living room, kitchen and bath. legalize laundry rm to entertainment roomDetails
remodel interior stairway, living room, kitchen and bath. legalize laundry rm to entertainment room | $40,000 |
| Nov 18, 2016 | Never finaled issued Nov 2016, no final | 1119 Cayuga Av | Bassad Inc./Dba: Everlast Construction | install r-19 batt insulation on garage ceiling. sheet rock 5/8" type x interior garage wall & ceiling.Details
install r-19 batt insulation on garage ceiling. sheet rock 5/8" type x interior garage wall & ceiling. | $5,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 1119 Cayuga Av | Bassad Inc./Dba: Everlast Construction | remove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement.Details
remove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement. | $30,000 |
| Sep 29, 2016 | Completed final sign-off Nov 2016 | 758 Haight St | Bassad Inc./Dba: Everlast Construction | unit #4: revision to app #2016-09-08-7160 new plumbing and electrical connection to laundry washer and dryer units. connect to existing drain. replace (2) skylights in-kind, no change in size.Details
unit #4: revision to app #2016-09-08-7160 new plumbing and electrical connection to laundry washer and dryer units. connect to existing drain. replace (2) skylights in-kind, no change in size. | $6,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 758 Haight St | Bassad Inc./Dba: Everlast Construction | apt 4: hall bathroom remodel: remove (e) tile and fixtures. replace vanity, install new lights, new paint.Details
apt 4: hall bathroom remodel: remove (e) tile and fixtures. replace vanity, install new lights, new paint. | $14,000 |
| Jul 12, 2016 | Completed final sign-off Aug 2016 | 3731 Fillmore St | Bassad Inc./Dba: Everlast Construction | hall bathroom remodel - remove (e) corner shower, convert (e) tub to shower, relocate sink & vanity. new lights & gfci, new wall cabinet. replace existing window (same size and location). does not face street.Details
hall bathroom remodel - remove (e) corner shower, convert (e) tub to shower, relocate sink & vanity. new lights & gfci, new wall cabinet. replace existing window (same size and location). does not face street. | $15,000 |
| Jul 6, 2016 | Completed final sign-off Nov 2016 | 208 Tara St | Bassad Inc./Dba: Everlast Construction | kitchen remodel- retrofit window (replace in kind) replace sink, new dishwasher, replace stove & fan, 4 led lights & 4 outlets.Details
kitchen remodel- retrofit window (replace in kind) replace sink, new dishwasher, replace stove & fan, 4 led lights & 4 outlets. | $20,000 |
| Jul 6, 2016 | Completed final sign-off Apr 2017 | 218 Holloway Av | Bassad Inc./Dba: Everlast Construction | replace extg landing with deck and stairs at rear of house 120sq ft. install interior spiral staircase to (e) attic.Details
replace extg landing with deck and stairs at rear of house 120sq ft. install interior spiral staircase to (e) attic. | $18,000 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 1040 Noe St | Bassad Inc./Dba: Everlast Construction | kitchen remodel, retrofit repalce (e) slider door, replace (e) sink, dishwasher, garbage disposal, stove, add 6 lights, & upgrade 6 outlets no chages to location , no changes to walls, new counters & cabinetsDetails
kitchen remodel, retrofit repalce (e) slider door, replace (e) sink, dishwasher, garbage disposal, stove, add 6 lights, & upgrade 6 outlets no chages to location , no changes to walls, new counters & cabinets | $24,000 |
| Jun 9, 2016 | Completed final sign-off Aug 2017 | 4431 24th St | Bassad Inc./Dba: Everlast Construction | kitchen remodel no changes to walls or windows, same location replace (e) sink, dishwasher, garbage disposal, stove, upgreade outlets replace cabinets & countertops.Details
kitchen remodel no changes to walls or windows, same location replace (e) sink, dishwasher, garbage disposal, stove, upgreade outlets replace cabinets & countertops. | $20,000 |
| May 25, 2016 | Completed final sign-off Dec 2016 | 294 Upper Tr | T M K Builders Inc, Bassad Inc./Dba: Everlast Construction | repair (e) roof deck and guardrails at rearDetails
repair (e) roof deck and guardrails at rear | $30,000 |
| May 6, 2016 | Completed final sign-off Jul 2016 | 2727 42nd Av | Bassad Inc./Dba: Everlast Construction | 2nd story hall bathroom remodel. tub becomes shower. replace toilet, sink. upgrade all electrical, ass 1 outlet, 1 ledDetails
2nd story hall bathroom remodel. tub becomes shower. replace toilet, sink. upgrade all electrical, ass 1 outlet, 1 led | $17,000 |
| Apr 12, 2016 | Completed final sign-off Jul 2016 | 1317 Judah St | Bassad Inc./Dba: Everlast Construction | removal of load bearing wall in kitchen/dining 3rd flr, adding support on lower units (adding posts) maher naDetails
removal of load bearing wall in kitchen/dining 3rd flr, adding support on lower units (adding posts) maher na | $10,000 |
| Apr 11, 2016 | Completed final sign-off Jan 2017 | 218 Holloway Av | Bassad Inc./Dba: Everlast Construction | 1)construct interior non bearing and nonstructural walls. 2)full kitchen, 3) bathroom, and 4) bedroom, ground floor unit legalizationDetails
1)construct interior non bearing and nonstructural walls. 2)full kitchen, 3) bathroom, and 4) bedroom, ground floor unit legalization | $25,000 |
| Apr 6, 2016 | Completed final sign-off Jan 2017 | 310 Townsend St | Bassad Inc./Dba: Everlast Construction | bathroom remodel: replace all fixtures like to like. upgrade electrical and plumbing, add (6) recessed leds to bathroom and (4) to adjacent bedroom. install exhaust fan, tile floor and wall, tub becomes shower. note: provide humidistatDetails
bathroom remodel: replace all fixtures like to like. upgrade electrical and plumbing, add (6) recessed leds to bathroom and (4) to adjacent bedroom. install exhaust fan, tile floor and wall, tub becomes shower. note: provide humidistat | $6,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 127 Knollview Wy | Bassad Inc./Dba: Everlast Construction | install (2) exhaust fans to bathroom, one in shower and one in bathroom general area. provide humidistat like for like. bathroom remodel; upgrade all plumbing and electrical, shower pan, replace fixtures.Details
install (2) exhaust fans to bathroom, one in shower and one in bathroom general area. provide humidistat like for like. bathroom remodel; upgrade all plumbing and electrical, shower pan, replace fixtures. | $10,000 |
| Mar 9, 2016 | Completed final sign-off Jul 2016 | 756 Thornton Av | Bassad Inc./Dba: Everlast Construction | 2nd fl bathroom remodel. replace shower wall tile. replace fixts like for like. new exhaust fan. no structural work. same configuration. n/a for maher.Details
2nd fl bathroom remodel. replace shower wall tile. replace fixts like for like. new exhaust fan. no structural work. same configuration. n/a for maher. | $10,000 |
| Feb 16, 2016 | Completed final sign-off May 2016 | 1321 Revere Av | Bassad Inc./Dba: Everlast Construction | convert bedroom to bathroom, walk in closet and office removal of non structural closet walls and construction of partition walls- installastion of all fixtures & appliances.Details
convert bedroom to bathroom, walk in closet and office removal of non structural closet walls and construction of partition walls- installastion of all fixtures & appliances. | $20,000 |
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 1317 Judah St | Bassad Inc./Dba: Everlast Construction | replace all windows to vinyl, size remain the same, total 11 windows for upper unit only. at the front windows shall be either aluminum or fiberglass.Details
replace all windows to vinyl, size remain the same, total 11 windows for upper unit only. at the front windows shall be either aluminum or fiberglass. | $10,000 |
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 1317 Judah St | Bassad Inc./Dba: Everlast Construction | replace skylights same size & location. add 20 recessed lights throughout unit, add solor tube to laundry room, remodel kitchen and master bath like for like. maher not reqDetails
replace skylights same size & location. add 20 recessed lights throughout unit, add solor tube to laundry room, remodel kitchen and master bath like for like. maher not req | $50,000 |
| Feb 11, 2016 | Completed final sign-off Jun 2016 | 495 Los Palmos Dr | Bassad Inc./Dba: Everlast Construction | demo non load bearing wall, full kitchen remodel, like for like, add hood and 1 outletDetails
demo non load bearing wall, full kitchen remodel, like for like, add hood and 1 outlet | $20,000 |
| Jan 6, 2016 | Completed final sign-off Jan 2016 | 941 Broderick St | Bassad Inc./Dba: Everlast Construction | like for like replace toilet, shower, sink, upgrade electrical, plumbing in work area galv to copper.Details
like for like replace toilet, shower, sink, upgrade electrical, plumbing in work area galv to copper. | $17,000 |
| Dec 30, 2015 | Completed final sign-off Jan 2020 | 4622 17th St | Bassad Inc./Dba: Everlast Construction | hall bath remodel 2nd fl. add a new toilet. replace tub/shower in new location. replace e fixturesDetails
hall bath remodel 2nd fl. add a new toilet. replace tub/shower in new location. replace e fixtures | $20,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 4495 17th St | Bassad Inc./Dba: Everlast Construction | retrofit (7) windows at front of house. materials: wood hung, recreate ogeelug, u-factor shall not exceed 0.32 as shown on photos.Details
retrofit (7) windows at front of house. materials: wood hung, recreate ogeelug, u-factor shall not exceed 0.32 as shown on photos. | $1,400 |
| Aug 7, 2015 | Never finaled issued Aug 2016, no final | 4495 17th St | Bassad Inc./Dba: Everlast Construction | demo (e) sun room & laundry room in rear of building. add nook and extend kitchen with deck above.Details
demo (e) sun room & laundry room in rear of building. add nook and extend kitchen with deck above. | $40,000 |
| Jul 10, 2015 | Never finaled issued Jul 2015, no final | 2040 Sutter St | Bassad Inc./Dba: Everlast Construction | unit 404: kitchen remodel - like-t0-like, 8'x11'= 88 sq. ft. replace (e) sink, garbage disposall, fan, switch, dishwasher, stove, upgrade outlets. no changes to windows or walls.Details
unit 404: kitchen remodel - like-t0-like, 8'x11'= 88 sq. ft. replace (e) sink, garbage disposall, fan, switch, dishwasher, stove, upgrade outlets. no changes to windows or walls. | $20,000 |