Block 3627, lot 036
931 Sanchez St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,371 sq ft
- Lot
- 2,247 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2025 | Completed final sign-off Feb 2025 | 931 Sanchez St | recommencement and completion of work approved under pa# 202104229125.Details
recommencement and completion of work approved under pa# 202104229125. | $30,000 | |
| Jan 8, 2025 | Completed final sign-off Feb 2025 | 931 Sanchez St | to repair leak on 3rd floor balcony. remove/replace guardrail waterproofing and reinstall same glass guardrail, comply with complaint 2022-92265.Details
to repair leak on 3rd floor balcony. remove/replace guardrail waterproofing and reinstall same glass guardrail, comply with complaint 2022-92265. | $3,750 | |
| Dec 26, 2024 | Completed final sign-off Dec 2024 | 931 Sanchez St | to obtain final inspection for work approved under pa# 201504153637. all work is complete.Details
to obtain final inspection for work approved under pa# 201504153637. all work is complete. | ||
| Apr 22, 2021 | Expired or cancelled expired Dec 2024 | 931 Sanchez St | bathroom remodel, fixtures, tiule, cabinet inkind, kitchen remdoel fixtures, tile cabinetsDetails
bathroom remodel, fixtures, tiule, cabinet inkind, kitchen remdoel fixtures, tile cabinets | $60,000 | |
| Aug 6, 2019 | Completed final sign-off Feb 2021 | 931 Sanchez St | Healthy Duct Cleaning | install split system into rooms. 3 total heads.condenser unit no more than 200 poundsDetails
install split system into rooms. 3 total heads.condenser unit no more than 200 pounds | $17,000 |
| Jul 25, 2019 | Completed final sign-off Nov 2019 | 931 Sanchez St | Bassad Inc./Dba: Everlast Construction | exploratory demo on balcony floor / tile to observe water damage to structural framing. submit separate permit for repair.Details
exploratory demo on balcony floor / tile to observe water damage to structural framing. submit separate permit for repair. | $600 |
| Oct 20, 2015 | Completed final sign-off Jul 2016 | 931 Sanchez St | Sf Twin Boys Corp. Dba Master Builders | remove powder room and closet at main floor per planDetails
remove powder room and closet at main floor per plan | $5,000 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 931 Sanchez St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Apr 15, 2015 | Expired or cancelled expired Dec 2024 | 931 Sanchez St | Aero Construction Inc | 1) as built revision #201210011013. 2) rearrange panry, powder room, interior partition within building envelope. no exterior changes per plan.Details
1) as built revision #201210011013. 2) rearrange panry, powder room, interior partition within building envelope. no exterior changes per plan. | $30,000 |
| Jan 20, 2015 | Completed final sign-off Aug 2015 | 931 Sanchez St | Jaysito Construction Group Inc. | install new fire sprinkler system per nfpa 13-d througout the building included underground fire service, total 39 heads. ref #2012.1001.1013.Details
install new fire sprinkler system per nfpa 13-d througout the building included underground fire service, total 39 heads. ref #2012.1001.1013. | $20,000 |
| Aug 5, 2014 | Completed final sign-off Nov 2014 | 931 Sanchez St | Protection Roofing Co, | reroofingDetails
reroofing | $6,000 |
| Jul 25, 2013 | Completed final sign-off Aug 2015 | 931 Sanchez St | Aero Construction Inc | 1)provide shoring beams to support extg structure. 2)proved soldier beam to retain soil for excavation for proved basement under app#201210011013.Details
1)provide shoring beams to support extg structure. 2)proved soldier beam to retain soil for excavation for proved basement under app#201210011013. | $20,000 |
| Jul 19, 2013 | Completed final sign-off Aug 2015 | 931 Sanchez St | Aero Construction Inc | remove interior doors, trim, mouldings, & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation.Details
remove interior doors, trim, mouldings, & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation. | $1,000 |
| Oct 1, 2012 | Completed final sign-off Aug 2015 | 931 Sanchez St | Aero Construction Inc | horizontal & vertical addition. horizontal extension at side & horizontal reduction at rear, vertical addition on (e) single story plus basement house. include addition of a new 2nd story.Details
horizontal & vertical addition. horizontal extension at side & horizontal reduction at rear, vertical addition on (e) single story plus basement house. include addition of a new 2nd story. | $250,000 |
| Jan 12, 2012 | Completed final sign-off Jun 2012 | 931 Sanchez St | Mark Scott Construction Inc | revision to 201111309779 (fire damage repair). install missing foundation, rebuild laundry room, remove and replace redwood decking and stair.Details
revision to 201111309779 (fire damage repair). install missing foundation, rebuild laundry room, remove and replace redwood decking and stair. | $5,000 |
| Nov 30, 2011 | Completed final sign-off Jun 2012 | 931 Sanchez St | Mark Scott Construction Inc | to comply with violation #201171014. complete fire restoration. all surfaces removed down to wood except 50% roofing. some new electrical, some new plumbing, hvac. replace (e) windows and doors.Details
to comply with violation #201171014. complete fire restoration. all surfaces removed down to wood except 50% roofing. some new electrical, some new plumbing, hvac. replace (e) windows and doors. | $140,000 |
| Jul 22, 2002 | Expired or cancelled cancelled Feb 2015 | 931 Sanchez St | change out 100a breaker box.Details
change out 100a breaker box. | $400 | |
| Oct 3, 2000 | Completed final sign-off Dec 2000 | 931 Sanchez St | Dan Mccarthy Roofing | reroofingDetails
reroofing | $10,000 |
| Jul 19, 2000 | Completed final sign-off Oct 2000 | 931 Sanchez St | repair dry rot in framing & sidingDetails
repair dry rot in framing & siding | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aero Construction Inc (4), Mark Scott Construction Inc (2), Bassad Inc./Dba: Everlast Construction, Dan Mccarthy Roofing, Healthy Duct Cleaning, Jaysito Construction Group Inc., Protection Roofing Co,, Sf Twin Boys Corp. Dba Master Builders
- Engineers
- Alex Lau