90 permits since 2000 (engineer on 79 permits, architect on 7 permits, authorized agent-others on 2 permits, designer on 2 permits, attorney on 1 permit): 60 completed, 3 in progress, 10 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 1477 06th Av | Patrick K G Co. | 1) remodel sunroom at 2/f. 2) add (n) bedroom & (n) bathroom at rear of 1/f. 3) 1/f garage level interior remodeling & relocate (e) stairs between 1/f & 2/f.Details
1) remodel sunroom at 2/f. 2) add (n) bedroom & (n) bathroom at rear of 1/f. 3) 1/f garage level interior remodeling & relocate (e) stairs between 1/f & 2/f. | $20,000 |
| Dec 12, 2025 | In progress issued Jan 2026 | 819 47th Av | First Step Builders Inc | revision to 202506309770 to delete the kitchen from original scope. revision to 202508223737 to add kitchen island and sink, remove wall a kitchen, and provided letter of integrity for notched beam per inspector request.Details
revision to 202506309770 to delete the kitchen from original scope. revision to 202508223737 to add kitchen island and sink, remove wall a kitchen, and provided letter of integrity for notched beam per inspector request. | $4,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 367 Christopher Dr | First Step Builders Inc | replace existing exterior stairs in kind.Details
replace existing exterior stairs in kind. | $8,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 121 Lawton St | comply with nov202541346 to replace the removed slab. reconfigure e habitable space to include 2 bedrooms, 3 fixture bath and closet space on 1st fl. construct new partitions in garage to enclsoe washer dryer,laundry sink, water heater.Details
comply with nov202541346 to replace the removed slab. reconfigure e habitable space to include 2 bedrooms, 3 fixture bath and closet space on 1st fl. construct new partitions in garage to enclsoe washer dryer,laundry sink, water heater. | $20,000 | |
| Jul 29, 2024 | Expired or cancelled expired Jul 2026 | 15 Bishop St | Renova Builders | to enlarge (e) upper deck @ the same height, to replace (e) lower deck of same size with stair reconfiguration. to install new hot tub outside.Details
to enlarge (e) upper deck @ the same height, to replace (e) lower deck of same size with stair reconfiguration. to install new hot tub outside. | $85,000 |
| Aug 30, 2023 | Completed final sign-off Oct 2024 | 121 Lawton St | reconfigure rear deck & stairs. turn (e) family room into officeDetails
reconfigure rear deck & stairs. turn (e) family room into office | $15,000 | |
| Aug 8, 2023 | Completed final sign-off Aug 2024 | 767 10th Av | Yao Star Construction | revision to pa#202209122251, widen driveway with permeable paver finish. new site retaining wall at north property line at driveway.Details
revision to pa#202209122251, widen driveway with permeable paver finish. new site retaining wall at north property line at driveway. | |
| Jul 10, 2023 | Never finaled filed Jul 2023, never issued | 950 Taraval St | convert front portion of current office space into an adu comprising (3) bedrooms, (2) three-fixture bathrooms, (1) living/dining area, and (1) kitchen on the second flr. no structural alterations.Details
convert front portion of current office space into an adu comprising (3) bedrooms, (2) three-fixture bathrooms, (1) living/dining area, and (1) kitchen on the second flr. no structural alterations. | $100,000 | |
| Jun 20, 2023 | Expired or cancelled cancelled Jan 2026 | 948 Taraval St | convert (e) office space on the 1st floor into an ada compliant all gender restroom. mep work will be resigned built. no structural alterationsDetails
convert (e) office space on the 1st floor into an ada compliant all gender restroom. mep work will be resigned built. no structural alterations | $30,000 | |
| May 11, 2023 | Completed final sign-off Oct 2024 | 121 Lawton St | reconfigure interior stair, adding a den on 1st flr and installing a skylight at 2nd flr. no exterior or front facade alteration work.Details
reconfigure interior stair, adding a den on 1st flr and installing a skylight at 2nd flr. no exterior or front facade alteration work. | $30,000 | |
| Mar 8, 2023 | Completed final sign-off Oct 2023 | 812 25th Av | Goodman Construction & Design Co | 3/f unit# 2(812): 1) conversion of an existing shower room w/vanity into a full bath w/ 3-fixtures and replacement of 1-window. 2) remodeling of the toilet room. 3) kitchen remodeling, which includes the removal of non-bearing walls. 4) new enclosure for the water boiler.Details
3/f unit# 2(812): 1) conversion of an existing shower room w/vanity into a full bath w/ 3-fixtures and replacement of 1-window. 2) remodeling of the toilet room. 3) kitchen remodeling, which includes the removal of non-bearing walls. 4) new enclosure for the water boiler. | $35,000 |
| Dec 19, 2022 | Expired or cancelled withdrawn Jan 2023 | 121 Lawton St | 1st/flr: bathroom remodel w/ double vanities, toilet & shower, add 1 walk-in-closet, 1 powder rm, storage closets & 1 laundry rm, upgrade electrical service to 200amp. 2nd/flr: new open visal stairwell to create internal connection, relocated deck & stair at rear, new skylight at foyer.Details
1st/flr: bathroom remodel w/ double vanities, toilet & shower, add 1 walk-in-closet, 1 powder rm, storage closets & 1 laundry rm, upgrade electrical service to 200amp. 2nd/flr: new open visal stairwell to create internal connection, relocated deck & stair at rear, new skylight at foyer. | $60,000 | |
| Oct 24, 2022 | Completed final sign-off Sep 2025 | 346 Byxbee St | Tao's Construction Inc. | 1st fl. 1) add gym and offi, (2) 3-fixture baths & a media rm. 2) replace ext. stair in-kind due to dryrot. 3) replace garage door. 2nd fl. 4) reconfigure int. layout with (3) bedrooms, (2) 3-fixture baths, (1) kitchen, dining & living rm. 5) enclose two story lightwell on soutDetails
1st fl. 1) add gym and offi, (2) 3-fixture baths & a media rm. 2) replace ext. stair in-kind due to dryrot. 3) replace garage door. 2nd fl. 4) reconfigure int. layout with (3) bedrooms, (2) 3-fixture baths, (1) kitchen, dining & living rm. 5) enclose two story lightwell on sout | $95,000 |
| Apr 5, 2022 | Never finaled issued Aug 2022, no final | 644 Russia Av | Goodman Construction & Design Co | addition of one adu unit at the first floor under the state adu program.Details
addition of one adu unit at the first floor under the state adu program. | $65,000 |
| Dec 22, 2017 | Completed final sign-off Apr 2018 | 810 Rockdale Dr | The Great Ocean General Contractor | provide shoring beams for temporary support of (e) structure and to level the floor as needed. ref pa#201703232210.Details
provide shoring beams for temporary support of (e) structure and to level the floor as needed. ref pa#201703232210. | |
| Sep 19, 2017 | Completed final sign-off Nov 2018 | 240 26th Av | Aero Construction Inc | 2/f: add one laundry room and one bathroom per plans in (e) closets. kitchen alteration. relocate fixtures. relocate furnace.Details
2/f: add one laundry room and one bathroom per plans in (e) closets. kitchen alteration. relocate fixtures. relocate furnace. | $25,000 |
| Aug 10, 2017 | Completed final sign-off Aug 2017 | 545 Oxford St | Aero Construction Inc | revision to pa #201706209847 - convert (e) crawl space to storage, cover exposed mech duct work & apply finish coating to walls & ceiling w/low voc per calgreen measure.Details
revision to pa #201706209847 - convert (e) crawl space to storage, cover exposed mech duct work & apply finish coating to walls & ceiling w/low voc per calgreen measure. | |
| Jul 10, 2017 | Completed final sign-off Dec 2021 | 2277 Mission St | Paramount Construction | commercial t.i., remodel & convert existing mezz. and 2/f into dental office, approximately 1746 sq.ft., create new entrance, add one new ada elevator and upgrade restroom.Details
commercial t.i., remodel & convert existing mezz. and 2/f into dental office, approximately 1746 sq.ft., create new entrance, add one new ada elevator and upgrade restroom. | $150,000 |
| Jun 20, 2017 | Expired or cancelled expired Mar 2022 | 545 Oxford St | Aero Construction Inc | convert (e) playroom into the guest room, one bedroom, one media room on g/fDetails
convert (e) playroom into the guest room, one bedroom, one media room on g/f | $8,000 |
| Jun 14, 2017 | Expired or cancelled expired Sep 2021 | 3732 Rivera St | repair foundation at ground floor only per plan.Details
repair foundation at ground floor only per plan. | $5,000 | |
| May 8, 2017 | Completed final sign-off Jul 2017 | 194 Emmet Ct | add new retaining wall and concrete patio in rear yard to comply nov#201773711.Details
add new retaining wall and concrete patio in rear yard to comply nov#201773711. | $5,000 | |
| Aug 18, 2016 | Never finaled issued Nov 2020, no final | 786 Green St | legalize a 2nd dwelling unit at the ground floor of an (e) 2-family 2-story dwelling (per sec 207.3 ord 43-14).Details
legalize a 2nd dwelling unit at the ground floor of an (e) 2-family 2-story dwelling (per sec 207.3 ord 43-14). | $20,000 | |
| May 6, 2016 | Never finaled issued Jul 2017, no final | 550 Octavia St | convert current space to beauty salon, add 1 unisex ada bathroom, add wheelchair accessible ramp and entrance.Details
convert current space to beauty salon, add 1 unisex ada bathroom, add wheelchair accessible ramp and entrance. | $35,000 | |
| May 3, 2016 | Completed final sign-off Jul 2018 | 1367 Rhode Island St | Sincere Construction Company Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $20,000 |
| Apr 4, 2016 | Completed final sign-off Oct 2016 | 214 California St | change of use from existing retail to a full restaurant, (e) mechancial to be remain, kitchen hood and fire suppression system under seperate permit. none to block front window. n/a maher ord. 155-13Details
change of use from existing retail to a full restaurant, (e) mechancial to be remain, kitchen hood and fire suppression system under seperate permit. none to block front window. n/a maher ord. 155-13 | $20,000 | |
| Oct 23, 2014 | Expired or cancelled cancelled Jan 2026 | 150 Urbano Dr | repair foundation at detached garage. replace 3 windows in kind. repair siding at garage and storage. repair dryrot at garage and storage roomDetails
repair foundation at detached garage. replace 3 windows in kind. repair siding at garage and storage. repair dryrot at garage and storage room | $5,000 | |
| Oct 29, 2013 | Completed final sign-off Mar 2014 | 2809 San Bruno Av | W. Wong Construction Co. Inc. | to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms.Details
to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms. | $60,000 |
| May 30, 2013 | Never finaled issued May 2013, no final | 750 Kearny St | W. Wong Construction Co. Inc. | install partition wall & door for storage room on 3rd floor mezzanine plan.Details
install partition wall & door for storage room on 3rd floor mezzanine plan. | $1,500 |
| May 13, 2013 | Completed final sign-off Jun 2014 | 534 Woolsey St | De Well Construction Inc | 1)add one bedroom, one bathroom, laundry room and game room in 1st floor per plan. 2)add one bathroom, kitchen and bathroom remodel on 2nd floor per plan.Details
1)add one bedroom, one bathroom, laundry room and game room in 1st floor per plan. 2)add one bathroom, kitchen and bathroom remodel on 2nd floor per plan. | $78,000 |
| May 7, 2013 | Completed final sign-off Oct 2013 | 2051 35th Av | revision to appl #2013.02.27.1049 - remove posts at garage ( structural work only).Details
revision to appl #2013.02.27.1049 - remove posts at garage ( structural work only). | $900 | |
| May 7, 2013 | Completed final sign-off Aug 2013 | 530 Ellsworth St | Xinh Hua Construction | revision to appl #2013.04.17.4744 - replace foundation per plan to create min. legal headroom for new habitable space.Details
revision to appl #2013.04.17.4744 - replace foundation per plan to create min. legal headroom for new habitable space. | |
| Apr 12, 2013 | Completed final sign-off May 2013 | 1307 Castro St | repair rear deck & stair (for residential use). replacement in kind.Details
repair rear deck & stair (for residential use). replacement in kind. | $2,000 | |
| Apr 10, 2013 | Completed final sign-off Sep 2016 | 962 Capitol Av | horizontal and vertical addition - (2 living rm, 3 bdrm, 1 visitor rm @ 1/f) (2 bedrm, 2 m. bedrm, 1 study, 1 kitchen, 1 bath @ 2/f per plan)Details
horizontal and vertical addition - (2 living rm, 3 bdrm, 1 visitor rm @ 1/f) (2 bedrm, 2 m. bedrm, 1 study, 1 kitchen, 1 bath @ 2/f per plan) | $100,000 | |
| Apr 10, 2013 | Never finaled issued Jul 2017, no final | 219 Maynard St | horizontal addition at westerly of front. enlarge (e) living room.Details
horizontal addition at westerly of front. enlarge (e) living room. | $20,000 | |
| Apr 10, 2013 | Completed final sign-off Aug 2016 | 2143 46th Av | horizontal addition. enlarge hobby room on 1st floor per plan & add new office & master bedroom on 2nd floor per plan.Details
horizontal addition. enlarge hobby room on 1st floor per plan & add new office & master bedroom on 2nd floor per plan. | $80,000 | |
| Mar 20, 2013 | Expired or cancelled expired Nov 2017 | 170 10th Av | Aero Construction Inc | to comply nov3200715611. front & rear horizontal extension at side & convert pitch roof to flat roof.Details
to comply nov3200715611. front & rear horizontal extension at side & convert pitch roof to flat roof. | $250,000 |
| Mar 20, 2013 | Completed final sign-off May 2014 | 161 27th Av | Aero Construction Inc | add powder room and relocate kitchen on 2nd floor per plan. remove walls to create large opening at new kitchen.Details
add powder room and relocate kitchen on 2nd floor per plan. remove walls to create large opening at new kitchen. | $38,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 750 Kearny St | W. Wong Construction Co. Inc. | to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th flDetails
to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th fl | $5,000 |
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 608 Missouri St | Wei's Construction Co | convert powder room to full bath on 2nd fl. relocate laundry room.Details
convert powder room to full bath on 2nd fl. relocate laundry room. | $20,000 |
| Mar 8, 2013 | Never finaled issued Mar 2013, no final | 3018 Washington St | Artcore Construction | replace concrete pad per plan total 1 pads at side of property. structural work onlyDetails
replace concrete pad per plan total 1 pads at side of property. structural work only | $2,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 3020 Washington St | Artcore Construction | replace garden wall per plan approx 66'Details
replace garden wall per plan approx 66' | $10,000 |
| Mar 5, 2013 | Expired or cancelled expired Oct 2015 | 150 Urbano Dr | revision to appl #2013.0201.9332 - revise foundation detail.Details
revision to appl #2013.0201.9332 - revise foundation detail. | ||
| Mar 1, 2013 | Completed final sign-off May 2014 | 3326 Steiner St | Goodman Construction & Design Co | 1)enclose window in kitchen. 2)replace window in kind on 2nd floor per plan, not visable from street. 3)kitchen remodel on 2nd floor per plan. 4)bathroom remodel on 2nd floor per plan. 5)water heater and furnace installations.Details
1)enclose window in kitchen. 2)replace window in kind on 2nd floor per plan, not visable from street. 3)kitchen remodel on 2nd floor per plan. 4)bathroom remodel on 2nd floor per plan. 5)water heater and furnace installations. | $20,000 |
| Feb 19, 2013 | Completed final sign-off Aug 2013 | 3597 Mission St | A Plus Builder | add 2 bedrooms, 1 entertainment room and 1 bath on 1st floor. relocate existing kitchen and bedroom, 1 bath on 2nd fl, convert existing storage room to den on 3rd flDetails
add 2 bedrooms, 1 entertainment room and 1 bath on 1st floor. relocate existing kitchen and bedroom, 1 bath on 2nd fl, convert existing storage room to den on 3rd fl | $56,000 |
| Jan 29, 2013 | Never finaled issued Mar 2019, no final | 471 24th Av | vertical & horizontal addition to (e) building to become 4 story, 2 family type v-a dwellings. sprinkler deferred. reference to environmental evaluation review app#2012.0132e. maher n/a.Details
vertical & horizontal addition to (e) building to become 4 story, 2 family type v-a dwellings. sprinkler deferred. reference to environmental evaluation review app#2012.0132e. maher n/a. | $500,000 | |
| Nov 30, 2012 | Never finaled issued Nov 2012, no final | 70 Castillo St | revision to appl #2012.1106.3611 - repalce footing instead of underpining.Details
revision to appl #2012.1106.3611 - repalce footing instead of underpining. | ||
| Nov 27, 2012 | Completed final sign-off Feb 2013 | 5668 03rd St | build partition between customer and drink area. install supply plumbing to water heater & sink. install water heater, refrigerator, microwave & coffee maker. install 3 compartment sinks, hand sink and mop sink.Details
build partition between customer and drink area. install supply plumbing to water heater & sink. install water heater, refrigerator, microwave & coffee maker. install 3 compartment sinks, hand sink and mop sink. | $10,000 | |
| Nov 2, 2012 | Completed final sign-off Feb 2013 | 165 Jefferson St | W. Wong Construction Co. Inc. | change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons.Details
change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons. | $350,000 |
| Oct 11, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | Shun Construction Inc. | replace dryrotted main stair in kind approx 160 sq. ft.Details
replace dryrotted main stair in kind approx 160 sq. ft. | $8,000 |
| Oct 11, 2012 | Completed final sign-off May 2013 | 542 Myra Wy | Tam Woot Remodeling | add entertainment rm @ basement, add full bath & master bedrm on ground flr, bath & kitchen remodel, add powder rm, repair wood deck at rear in-kind on 2nd flr. replace windows @ front (same size, location, wood-clad fiberglass/alum frame), replace siding at rear of bldg. repair dry rot at frontDetails
add entertainment rm @ basement, add full bath & master bedrm on ground flr, bath & kitchen remodel, add powder rm, repair wood deck at rear in-kind on 2nd flr. replace windows @ front (same size, location, wood-clad fiberglass/alum frame), replace siding at rear of bldg. repair dry rot at front | $58,000 |
| Oct 1, 2012 | Completed final sign-off Aug 2015 | 931 Sanchez St | Aero Construction Inc | horizontal & vertical addition. horizontal extension at side & horizontal reduction at rear, vertical addition on (e) single story plus basement house. include addition of a new 2nd story.Details
horizontal & vertical addition. horizontal extension at side & horizontal reduction at rear, vertical addition on (e) single story plus basement house. include addition of a new 2nd story. | $250,000 |
| Sep 20, 2012 | Completed final sign-off Dec 2012 | 2424 Yorba St | I W Construction | enlarge front garage door from 7'6 to 8'6 per plan. driveway remains unchangedDetails
enlarge front garage door from 7'6 to 8'6 per plan. driveway remains unchanged | $8,000 |
| Sep 13, 2012 | Completed final sign-off Apr 2015 | 337 Franconia St | comply w/nov #200863693 - repair/replace rearyard retaining wall per plans.Details
comply w/nov #200863693 - repair/replace rearyard retaining wall per plans. | $10,000 | |
| Sep 7, 2012 | Completed final sign-off Sep 2012 | 1282 Treat Av | to comply with complaint # 201261448 -replace windows at rear on 2nd floor per plan. replace exising header and framing at 2 window opening. sam2r size and location for openings.Details
to comply with complaint # 201261448 -replace windows at rear on 2nd floor per plan. replace exising header and framing at 2 window opening. sam2r size and location for openings. | $2,000 | |
| Aug 30, 2012 | Completed final sign-off Apr 2013 | 1669 07th Av | Jhy Construction Inc | foundation work due to increasing headroom on ground floor per planDetails
foundation work due to increasing headroom on ground floor per plan | $4,000 |
| Aug 21, 2012 | Completed final sign-off Oct 2012 | 33 Downey St | A Plus Builder | 1) replace dry rotted walls and flooring per plan. 2) replace dry wall & install insulation at wall per plan.Details
1) replace dry rotted walls and flooring per plan. 2) replace dry wall & install insulation at wall per plan. | $40,000 |
| Aug 10, 2012 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement.Details
vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement. | $180,000 |
| Jul 27, 2012 | Completed final sign-off Mar 2013 | 742 04th Av | Goodman Construction & Design Co | revision to appl #2012.0606.1949 - structural work only.Details
revision to appl #2012.0606.1949 - structural work only. | |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 1335 Pacific Av | convert vestibule to administrative office per plan for residential unit. remove planter at lobby per plan.Details
convert vestibule to administrative office per plan for residential unit. remove planter at lobby per plan. | $8,000 | |
| Jul 3, 2012 | Expired or cancelled cancelled Jan 2026 | 55 Salmon St | install beams at garage ceiling to eliminate posts per plan (structural work only).Details
install beams at garage ceiling to eliminate posts per plan (structural work only). | $30,000 | |
| Jul 3, 2012 | Expired or cancelled cancelled Jan 2026 | 55 Salmon St | replace damaged foundation per plan (structural work only).Details
replace damaged foundation per plan (structural work only). | $28,000 | |
| Jun 26, 2012 | Completed final sign-off Aug 2012 | 524 Castro St | J & L Construction Co. | add one non-accessible restroom & remodel accessible restroom on ground floor (less than 50 occupancy), interior remodel per plan.Details
add one non-accessible restroom & remodel accessible restroom on ground floor (less than 50 occupancy), interior remodel per plan. | $10,000 |
| Jun 11, 2012 | Completed final sign-off Mar 2013 | 3829 Mission St | J & L Construction Roofing | repair/replace damaged front facade on ground floor per plan.Details
repair/replace damaged front facade on ground floor per plan. | $20,000 |
| Jun 6, 2012 | Completed final sign-off Jun 2012 | 518 Grant Av | remove partition wall per plan. to comply with complaint # 201229281. remove partition wall - non bearing wall per plan.Details
remove partition wall per plan. to comply with complaint # 201229281. remove partition wall - non bearing wall per plan. | $1,000 | |
| Jun 6, 2012 | Completed final sign-off Mar 2013 | 742 04th Av | Goodman Construction & Design Co | add bathroom, 2 bedrooms, 1 guest room, study room on ground fl. remodel 2 baths on 3rd fl per plan. foundation work per plan. install beams over kitchen and new mudroom per planDetails
add bathroom, 2 bedrooms, 1 guest room, study room on ground fl. remodel 2 baths on 3rd fl per plan. foundation work per plan. install beams over kitchen and new mudroom per plan | $70,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 765 Brussels St | New Era Construction Co. ***Check Id**** | replace extg wood stair and deck with new in like kind and same size at rear yard.Details
replace extg wood stair and deck with new in like kind and same size at rear yard. | $16,000 |
| May 11, 2012 | Completed final sign-off Sep 2012 | 2900 Judah St | Rayford Technical Services And Construct | add new restroom on ground floor per plan.Details
add new restroom on ground floor per plan. | $13,000 |
| May 11, 2012 | Completed final sign-off Jul 2014 | 2201 Irving St | revision to pa #2012.04.17.8521 - correct of use from office to spa/massage. convert accessible shower to regular shower, new storage @ reception area for spa massage.Details
revision to pa #2012.04.17.8521 - correct of use from office to spa/massage. convert accessible shower to regular shower, new storage @ reception area for spa massage. | ||
| May 11, 2012 | Expired or cancelled expired Aug 2025 | 1655 Folsom St | Shi Ho Constraction | add new restroom on ground floor per plan.Details
add new restroom on ground floor per plan. | $13,000 |
| May 4, 2012 | Never finaled issued Jun 2012, no final | 491 Post St | W. Wong Construction Co. Inc. | no work to be done under this permit. establish occupancy load for assembly occupancy onlyDetails
no work to be done under this permit. establish occupancy load for assembly occupancy only | |
| Apr 17, 2012 | Expired or cancelled expired Jul 2014 | 2201 Irving St | interior renovation - demolish & install partition walls & new bathroomDetails
interior renovation - demolish & install partition walls & new bathroom | $30,000 | |
| Apr 17, 2012 | Expired or cancelled suspend Apr 2013 | 1748 Oakdale Av | replace damage foundation per plan (structural work only).Details
replace damage foundation per plan (structural work only). | $28,000 | |
| Apr 17, 2012 | Expired or cancelled expired Dec 2013 | 620 Green St | Sik Hoi Wong Construction, T J Constr Inc***Ck Id,Tie Liu Only***** | replace brick foundation with concrete foundation per plan (structural work only), work in common area only.Details
replace brick foundation with concrete foundation per plan (structural work only), work in common area only. | $15,000 |
| Mar 14, 2012 | Completed final sign-off Sep 2018 | 906 Cortland Av | Tam Woot Remodeling | erect 3 stories of 2 dwelling units.Details
erect 3 stories of 2 dwelling units. | $280,000 |
| Mar 14, 2012 | Completed final sign-off Dec 2016 | 906 Cortland Av | Tam Woot Remodeling | demolish a commercial spaceDetails
demolish a commercial space | $10,000 |
| Mar 2, 2012 | Completed final sign-off Jun 2012 | 20 Paloma Av | add one bedroom, bathroom & laundry / storage on the 1st floor per plan.Details
add one bedroom, bathroom & laundry / storage on the 1st floor per plan. | $34,000 | |
| Feb 24, 2012 | Completed final sign-off Mar 2012 | 1125 Clement St | upgrade existing restroom to meet accessiblity standardDetails
upgrade existing restroom to meet accessiblity standard | $13,000 | |
| Feb 23, 2012 | Completed final sign-off Oct 2012 | 545 Spruce St | Goodman Construction & Design Co | add 1 bedroom, bath, storage, laundry room, den on 1st floor per plan. baths and kitchen remodel on 2nd fl per plan. replace windows in kind. same size and location per plan. aluminum match configuration of front windows.Details
add 1 bedroom, bath, storage, laundry room, den on 1st floor per plan. baths and kitchen remodel on 2nd fl per plan. replace windows in kind. same size and location per plan. aluminum match configuration of front windows. | $57,000 |
| Feb 2, 2012 | Completed final sign-off Apr 2012 | 2127 Irving St | Hao Qiang Construction | install 2 shampoo units with proper drainage connect to existing sewer lateral per plan.Details
install 2 shampoo units with proper drainage connect to existing sewer lateral per plan. | $1,500 |
| Jan 18, 2012 | Completed final sign-off Jul 2012 | 1317 20th Av | remodel, convert retail space to day spa. remove (e) non-load bearing partitions. construct (n) non-load bearing partitions. add full ada bath, steam rm. 5-shower rms., laundry room & break room.Details
remodel, convert retail space to day spa. remove (e) non-load bearing partitions. construct (n) non-load bearing partitions. add full ada bath, steam rm. 5-shower rms., laundry room & break room. | $60,000 | |
| Dec 21, 2011 | Expired or cancelled expired Mar 2013 | 434 Broadway | Topline Builders Corp | add restroom at 1st floor & grease trap at kitchen. add new power door operator at front door.Details
add restroom at 1st floor & grease trap at kitchen. add new power door operator at front door. | $10,000 |
| Dec 21, 2011 | Completed final sign-off Nov 2016 | 12 Brentwood Av | Ho Bok Construction | kitchen & bathroom remodel on 2nd floor per plan. add laundry room on 2nd floor per plan and bathroom remodel on 1st floor per plan. replace windows (4) at front with same size and location per plan.Details
kitchen & bathroom remodel on 2nd floor per plan. add laundry room on 2nd floor per plan and bathroom remodel on 1st floor per plan. replace windows (4) at front with same size and location per plan. | $38,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 535 Ulloa St | Soon Ye Louie/Dba Soon Louie Const. | 1. add one family room, bedroom and bathroom on 1st floor per plan. 2. add new windows (3) on 1st floor at front.Details
1. add one family room, bedroom and bathroom on 1st floor per plan. 2. add new windows (3) on 1st floor at front. | $30,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | Shun Construction Inc. | add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair.Details
add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair. | $60,000 |
| Jun 13, 2011 | Completed final sign-off Jul 2011 | 1485 41st Av | Soon Ye Louie/Dba Soon Louie Const. | repair damaged footing at westerly & southerly side of the building.Details
repair damaged footing at westerly & southerly side of the building. | $10,000 |
| May 16, 2011 | Completed final sign-off Dec 2011 | 84 Coventry Ct | replace windows with same size & location, legalize one bathroom & add one bedroom & wet bar on 1st floor. remodel one bathroom & add new window at kitchen on 2nd floor. add roof deck above entertainment room. repair dryrot, stucco & foundation as noted on plan.Details
replace windows with same size & location, legalize one bathroom & add one bedroom & wet bar on 1st floor. remodel one bathroom & add new window at kitchen on 2nd floor. add roof deck above entertainment room. repair dryrot, stucco & foundation as noted on plan. | $45,000 | |
| Apr 8, 2011 | Expired or cancelled expired Jul 2015 | 471 Bright St | Alliance Plumbing Works Inc | removel 2 baths on 2nd fl and kitchen. relocate skylight. add game room, bedroom, bath on 1st fl. add bedroom,bath, exercise room, laundry, storate at basement. relocate stair. add wood deck and stair at rear. add plywd wall for voluntary strengtheningDetails
removel 2 baths on 2nd fl and kitchen. relocate skylight. add game room, bedroom, bath on 1st fl. add bedroom,bath, exercise room, laundry, storate at basement. relocate stair. add wood deck and stair at rear. add plywd wall for voluntary strengthening | $88,000 |
| Mar 1, 2011 | Completed final sign-off Nov 2011 | 21 Almaden Ct | Goodman Construction & Design Co | enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement.Details
enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement. | $50,000 |
| Feb 14, 2011 | Expired or cancelled cancelled Jul 2020 | 33 Harvard St | rear horizontial addition (two stories), also to comply w/compliant #199602642 to fix drainage issue.Details
rear horizontial addition (two stories), also to comply w/compliant #199602642 to fix drainage issue. | $80,000 | |
| Jan 24, 2011 | Completed final sign-off May 2013 | 566 Elizabeth St | garage addition: add new garage on street level.Details