Block 0237, lot 007
212 California St
- City’s use
- Commercial Retail
- Built
- 1910
- Stories
- 2
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 9,236 sq ft
- Lot
- 4,142 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
61 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 212 California St | 2/f ti: demolish 12 offices to make open office area. reconfigure break room area. install 1 urinal in bathroom. install sun tunnels in roof.Details
2/f ti: demolish 12 offices to make open office area. reconfigure break room area. install 1 urinal in bathroom. install sun tunnels in roof. | $50,000 | |
| Sep 12, 2024 | In progress filed Sep 2024, not yet issued | 212 California St | permit is being obtained in connection w/ applicants transition from an article 33 permit (medical cannabis sales) to an article 16 (retail cannabis sales) permit. no construction proposed or authorized.Details
permit is being obtained in connection w/ applicants transition from an article 33 permit (medical cannabis sales) to an article 16 (retail cannabis sales) permit. no construction proposed or authorized. | ||
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 214 California St | admin permit only for dph request: plug in turbo chef hoodless oven to heat sandwiches (30 seconds) no grease. plug in a panini grill to heat press sandwiches. install grease trap.Details
admin permit only for dph request: plug in turbo chef hoodless oven to heat sandwiches (30 seconds) no grease. plug in a panini grill to heat press sandwiches. install grease trap. | ||
| Jun 15, 2023 | Completed final sign-off Aug 2023 | 212 California St | change of use suite 210 to cannabis wholesale distribution per ooc authorization. no onsite consumptionDetails
change of use suite 210 to cannabis wholesale distribution per ooc authorization. no onsite consumption | ||
| Jan 5, 2021 | Never finaled filed Jan 2021, never issued | 214 California St | ste 214 - converting the office space for cannabis distribution(wholesale). no onsite consumption.Details
ste 214 - converting the office space for cannabis distribution(wholesale). no onsite consumption. | ||
| Nov 13, 2019 | Expired or cancelled cancelled Jan 2026 | 212 California St | Rago Neon Inc. | install 1 projecting electric double faced wall sign "sticky fingers"Details
install 1 projecting electric double faced wall sign "sticky fingers" | $800 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 214 California St | Zarc Construction Inc | remove floor, millwork, sink and 1 wall. install (n) finishes, furniture, lighting, millwork and kitchen equipmentDetails
remove floor, millwork, sink and 1 wall. install (n) finishes, furniture, lighting, millwork and kitchen equipment | $80,000 |
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 213, change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 213, change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 202, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 202, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 208, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 208, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 209, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 209, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 203, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 203, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 211, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 211, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 200, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 200, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 216, first time change of use per section 190 of the planning code. no construction. medical cannibas dispensary to cannabis retail use. maher n/aDetails
ste 216, first time change of use per section 190 of the planning code. no construction. medical cannibas dispensary to cannabis retail use. maher n/a | ||
| Mar 29, 2018 | Expired or cancelled withdrawn Jun 2023 | 214 California St | ste 210, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 210, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 206, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 206, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 212, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 212, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 207, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 207, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 204, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 204, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Expired or cancelled withdrawn Dec 2020 | 214 California St | ste 214, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 214, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 205, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 205, first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 214 California St | ste 202,first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/aDetails
ste 202,first time change of use per section 190 of the planning code. no construction. medical cannabis dispensary to cannibis retail use. maher n/a | ||
| Mar 12, 2018 | Expired or cancelled withdrawn Apr 2018 | 212 California St | no physical work. change of use permit applicatoin to add adult retail to (e) mcd (medical cannabis dispensory)Details
no physical work. change of use permit applicatoin to add adult retail to (e) mcd (medical cannabis dispensory) | ||
| Aug 8, 2017 | Expired or cancelled withdrawn Feb 2018 | 212 California St | Zebra Awning Co Inc | signage on awning kindcourier maher not reqDetails
signage on awning kindcourier maher not req | $600 |
| Aug 8, 2017 | Expired or cancelled withdrawn Feb 2018 | 212 California St | Zebra Awning Co Inc | recover existing awningDetails
recover existing awning | $2,100 |
| Jul 20, 2016 | Completed final sign-off Sep 2016 | 214 California St | One Stop Shop Construction | add (1) ada compliance cabinet and countertop & ada sink to (e) plumbing and (2) upper cabinets. rev. to pa#201603081495. n/a ordinance #155-13Details
add (1) ada compliance cabinet and countertop & ada sink to (e) plumbing and (2) upper cabinets. rev. to pa#201603081495. n/a ordinance #155-13 | $800 |
| Jul 8, 2016 | Expired or cancelled cancelled Jan 2026 | 214 California St | One Stop Shop Construction | 2/f interior: add windows on top of the partition wall. windows approx 2x8ft. ref pa#20603081495. total of 17 windows.Details
2/f interior: add windows on top of the partition wall. windows approx 2x8ft. ref pa#20603081495. total of 17 windows. | $4,500 |
| May 18, 2016 | Completed final sign-off Jun 2016 | 212 California St | Battalion One Fire Protection | sprinkler waterflow and supervisory system. install new control panel, radio communicator, smoke det. above & pull station near panel in the basement.install monitor modules to tie-in extg sprinkler devices to new panel. ref app#201605177613. n/a maher.Details
sprinkler waterflow and supervisory system. install new control panel, radio communicator, smoke det. above & pull station near panel in the basement.install monitor modules to tie-in extg sprinkler devices to new panel. ref app#201605177613. n/a maher. | $3,200 |
| May 17, 2016 | Completed final sign-off Jun 2016 | 212 California St | Battalion One Fire Protection | remove (e) pre action system valve, panel & compressor. install new waterflow switch, gauge & drain assembly making the (e) system wet. relocate tie in point of (e) fdc to the system side of cont vlv. (5-year cert to be completed concurrently). maher naDetails
remove (e) pre action system valve, panel & compressor. install new waterflow switch, gauge & drain assembly making the (e) system wet. relocate tie in point of (e) fdc to the system side of cont vlv. (5-year cert to be completed concurrently). maher na | |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 214 California St | street spaceDetails
street space | ||
| Apr 4, 2016 | Completed final sign-off Oct 2016 | 214 California St | change of use from existing retail to a full restaurant, (e) mechancial to be remain, kitchen hood and fire suppression system under seperate permit. none to block front window. n/a maher ord. 155-13Details
change of use from existing retail to a full restaurant, (e) mechancial to be remain, kitchen hood and fire suppression system under seperate permit. none to block front window. n/a maher ord. 155-13 | $20,000 | |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 214 California St | One Stop Shop Construction | rev. to pa#201508063612 to install 2 new mechanical systems for office t. i. on 2/f. n/a ordinance #155-13Details
rev. to pa#201508063612 to install 2 new mechanical systems for office t. i. on 2/f. n/a ordinance #155-13 | $7,500 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 214 California St | street spaceDetails
street space | ||
| Mar 8, 2016 | Completed final sign-off Jun 2016 | 214 California St | One Stop Shop Construction | revision to app#201508063612. eliminate conference room and one office. revise wall framing material. n/a for maherDetails
revision to app#201508063612. eliminate conference room and one office. revise wall framing material. n/a for maher | |
| Feb 3, 2016 | Never finaled issued Feb 2016, no final | 214 California St | street spaceDetails
street space | ||
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 214 California St | One Stop Shop Construction | 2nd floor: remodel existing office at 214 california street. add a restroom and conference room. ground floor under pa#201503241772. maher n/a.Details
2nd floor: remodel existing office at 214 california street. add a restroom and conference room. ground floor under pa#201503241772. maher n/a. | $50,000 |
| Mar 24, 2015 | Completed final sign-off Aug 2015 | 212 California St | One Stop Shop Construction | ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'dDetails
ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'd | $500 |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 212 California St | street spaceDetails
street space | ||
| Dec 29, 2014 | Never finaled issued Dec 2014, no final | 212 California St | street spaceDetails
street space | ||
| Dec 26, 2014 | Completed final sign-off Jun 2015 | 212 California St | One Stop Shop Construction | install new lighting for ti for medical cannabis dispensary. ref bpa#201407242082. compliance with maher ordinance no 155-13 not required.Details
install new lighting for ti for medical cannabis dispensary. ref bpa#201407242082. compliance with maher ordinance no 155-13 not required. | $28,000 |
| Sep 30, 2014 | Never finaled issued Sep 2014, no final | 212 California St | street space and mta parkingDetails
street space and mta parking | ||
| Jul 24, 2014 | Completed final sign-off May 2015 | 212 California St | One Stop Shop Construction | revision appl 201208308628. revise interior layout per plans. no change to building facade. maher n/a.Details
revision appl 201208308628. revise interior layout per plans. no change to building facade. maher n/a. | $20,000 |
| Sep 3, 2013 | Expired or cancelled cancelled Jan 2026 | 214 California St | add 2 addition offices and 2 new break rooms.Details
add 2 addition offices and 2 new break rooms. | $150,000 | |
| Aug 30, 2012 | Completed final sign-off Jun 2015 | 212 California St | J T Bannan Construction | upgrade entry door & door hardward. upgrade existing restrooms @ 1st fl. install new non-load bering partitions & new retail fixtures as required for new dispensary. (mcd)Details
upgrade entry door & door hardward. upgrade existing restrooms @ 1st fl. install new non-load bering partitions & new retail fixtures as required for new dispensary. (mcd) | $90,000 |
| May 25, 2006 | Expired or cancelled expired Jun 2011 | 212 California St | renew pa#2004/04/02/0327, 2000/06/07/2016, 2005/10/13/5498 for final inspectionDetails
renew pa#2004/04/02/0327, 2000/06/07/2016, 2005/10/13/5498 for final inspection | ||
| May 25, 2006 | Expired or cancelled expired Aug 2011 | 212 California St | renew pa#9924181s,2000/07/12/4875, 2001/10/12/0537, 2001/11/13/2974 for final insp.Details
renew pa#9924181s,2000/07/12/4875, 2001/10/12/0537, 2001/11/13/2974 for final insp. | ||
| Oct 13, 2005 | Expired or cancelled expired Aug 2011 | 212 California St | renew 200110120537, 200111132974, 200204123865 for finalDetails
renew 200110120537, 200111132974, 200204123865 for final | ||
| Apr 2, 2004 | Expired or cancelled expired Nov 2005 | 212 California St | renew appl#200110120537, 200111132974 & 200204123865Details
renew appl#200110120537, 200111132974 & 200204123865 | ||
| Jun 21, 2002 | Expired or cancelled expired Mar 2004 | 212 California St | Geo M Robinson & Co | renew 200103063533 to complete workDetails
renew 200103063533 to complete work | $500 |
| May 28, 2002 | Expired or cancelled expired Mar 2004 | 212 California St | California Suppresion Dba Calif. Protect | to renew app#2000/09/12/0248 for final inspection.Details
to renew app#2000/09/12/0248 for final inspection. | |
| Apr 12, 2002 | Expired or cancelled expired Sep 2002 | 212 California St | Sausal Corporation | review drawings to show "as is" improvements.Details
review drawings to show "as is" improvements. | |
| Apr 5, 2002 | Expired or cancelled expired Mar 2004 | 212 California St | Sausal Corporation | Details
| |
| Nov 13, 2001 | Expired or cancelled expired Mar 2004 | 212 California St | Cje Construction | revision to app #9924181 & 200110120537Details
revision to app #9924181 & 200110120537 | $25,000 |
| Oct 12, 2001 | Expired or cancelled expired Mar 2004 | 212 California St | Cje Construction | addendum to appl#9924181s, revise steel k. frame to concrete shear wallDetails
addendum to appl#9924181s, revise steel k. frame to concrete shear wall | $10,000 |
| Mar 6, 2001 | Expired or cancelled expired Oct 2001 | 212 California St | Geo M Robinson & Co | demo extg wet fire spsrinkler system in the bsmntDetails
demo extg wet fire spsrinkler system in the bsmnt | $23,975 |
| Oct 26, 2000 | Completed final sign-off Nov 2000 | 212 California St | Ad Art Electronic Sign Corporation | renewal of application 9706842 for final inspectionDetails
renewal of application 9706842 for final inspection | |
| Sep 18, 2000 | Expired or cancelled withdrawn Sep 2002 | 212 California St | provide generator and battery roomDetails
provide generator and battery room | ||
| Sep 12, 2000 | Expired or cancelled expired Sep 2001 | 212 California St | California Suppresion Dba Calif. Protect | install fm-200 suppression system in equipment rm/install panelDetails
install fm-200 suppression system in equipment rm/install panel | $40,000 |
| Jul 12, 2000 | Expired or cancelled expired Jul 2001 | 212 California St | revision on #9924181 revise struct detailDetails
revision on #9924181 revise struct detail | $35,000 | |
| Jun 7, 2000 | Expired or cancelled expired Jun 2001 | 212 California St | Vahdani Construction Co Inc | voluntary upgrade & strengthening, previous bldg retrofit-9418816Details
voluntary upgrade & strengthening, previous bldg retrofit-9418816 | $100,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.