One Stop Shop Construction
- Based in
- Martinez
- On San Francisco permits
- Oct 2013 to Mar 2021
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2021 | Completed final sign-off Feb 2022 | 45 Crescent Av | revise app#201811266628 and 201903014172. 1) relocate kitchen and bathroom to approved permit #201811266628 and 201903014172. 2) revise structural drawings for arch. design changesDetails
revise app#201811266628 and 201903014172. 1) relocate kitchen and bathroom to approved permit #201811266628 and 201903014172. 2) revise structural drawings for arch. design changes | |
| Nov 25, 2019 | Completed final sign-off Feb 2020 | 7 Elsie St | replace two street-facing windows with marvin aluminum-clad sash. same size, same location, max u factor 0.32.Details
replace two street-facing windows with marvin aluminum-clad sash. same size, same location, max u factor 0.32. | $2,500 |
| Jun 12, 2019 | Completed final sign-off Nov 2019 | 595 Pacific Av | 3rd fl: interior t.i. sf office: installation of new cabinetry, new bearing partitions, break room, new floor & new ceiling.Details
3rd fl: interior t.i. sf office: installation of new cabinetry, new bearing partitions, break room, new floor & new ceiling. | $300,000 |
| Jan 15, 2019 | Completed final sign-off Mar 2019 | 595 Pacific Av | 5th flr. interior office demo only. remove suspended ceiling, floor finishes, cabinetry, lighting, outlets, controls, duct w/ mech equip, non-bearing walls and break room sink, cap utilities. t.i under separate permit cinl electr, mech and fire.Details
5th flr. interior office demo only. remove suspended ceiling, floor finishes, cabinetry, lighting, outlets, controls, duct w/ mech equip, non-bearing walls and break room sink, cap utilities. t.i under separate permit cinl electr, mech and fire. | $25,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 595 Pacific Av | suite 240tenant improvementof 3538 office. remove & replace (e) ceiling tile throughout the office, (n) non-bearing partitions, (n) doors, & some lighting upgrades.Details
suite 240tenant improvementof 3538 office. remove & replace (e) ceiling tile throughout the office, (n) non-bearing partitions, (n) doors, & some lighting upgrades. | $27,500 |
| Apr 10, 2017 | Completed final sign-off Jan 2018 | 595 Pacific Av | convert storage to office and unisex restroom, remodel 2 restrooms on 1st floor. no exterior work. two existing bathrooms to be upgraded to fully comply w/ adaDetails
convert storage to office and unisex restroom, remodel 2 restrooms on 1st floor. no exterior work. two existing bathrooms to be upgraded to fully comply w/ ada | $85,000 |
| Feb 27, 2017 | Completed final sign-off Sep 2017 | 595 Pacific Av | replace broken garage gate with same style and color, galvinized steel curtain gate (roll up), replace in-kindDetails
replace broken garage gate with same style and color, galvinized steel curtain gate (roll up), replace in-kind | $15,000 |
| Dec 14, 2016 | Completed final sign-off Feb 2017 | 595 Pacific Av | unit #120, ti: remove lay-in ceiling in open office space & extend (e)walls at perimeter of open office to underside of structure above,replace lighting with high efficacy fixtures,provide new power door opener & actuation bars.Details
unit #120, ti: remove lay-in ceiling in open office space & extend (e)walls at perimeter of open office to underside of structure above,replace lighting with high efficacy fixtures,provide new power door opener & actuation bars. | $30,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2016 | 214 California St | add (1) ada compliance cabinet and countertop & ada sink to (e) plumbing and (2) upper cabinets. rev. to pa#201603081495. n/a ordinance #155-13Details
add (1) ada compliance cabinet and countertop & ada sink to (e) plumbing and (2) upper cabinets. rev. to pa#201603081495. n/a ordinance #155-13 | $800 |
| Jul 8, 2016 | Expired or cancelled cancelled Jan 2026 | 214 California St | 2/f interior: add windows on top of the partition wall. windows approx 2x8ft. ref pa#20603081495. total of 17 windows.Details
2/f interior: add windows on top of the partition wall. windows approx 2x8ft. ref pa#20603081495. total of 17 windows. | $4,500 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 214 California St | rev. to pa#201508063612 to install 2 new mechanical systems for office t. i. on 2/f. n/a ordinance #155-13Details
rev. to pa#201508063612 to install 2 new mechanical systems for office t. i. on 2/f. n/a ordinance #155-13 | $7,500 |
| Mar 8, 2016 | Completed final sign-off Jun 2016 | 214 California St | revision to app#201508063612. eliminate conference room and one office. revise wall framing material. n/a for maherDetails
revision to app#201508063612. eliminate conference room and one office. revise wall framing material. n/a for maher | |
| Jan 29, 2016 | Completed final sign-off Mar 2016 | 595 Pacific Av | #115: demolish existing non bearing partitions to connect storage room to #115,remove plumbing at sink and at plumbing prep. & cap utilities as necessary in vacant tenant space,no new construction,demo per sfbc ab-017. full accessibility will be submitted under future t.i. permit when space occupy.Details
#115: demolish existing non bearing partitions to connect storage room to #115,remove plumbing at sink and at plumbing prep. & cap utilities as necessary in vacant tenant space,no new construction,demo per sfbc ab-017. full accessibility will be submitted under future t.i. permit when space occupy. | $2,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 214 California St | 2nd floor: remodel existing office at 214 california street. add a restroom and conference room. ground floor under pa#201503241772. maher n/a.Details
2nd floor: remodel existing office at 214 california street. add a restroom and conference room. ground floor under pa#201503241772. maher n/a. | $50,000 |
| Mar 24, 2015 | Completed final sign-off Aug 2015 | 212 California St | ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'dDetails
ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'd | $500 |
| Dec 26, 2014 | Completed final sign-off Jun 2015 | 212 California St | install new lighting for ti for medical cannabis dispensary. ref bpa#201407242082. compliance with maher ordinance no 155-13 not required.Details
install new lighting for ti for medical cannabis dispensary. ref bpa#201407242082. compliance with maher ordinance no 155-13 not required. | $28,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 170 Columbus Av | suite #280: t.i. replace (e) light fixutures with led. remove and replace (e) breakroom cabinetes, remove 1 private office, remove (e) wall at conference room, replace with tempered glass. minor ada improvement at restroom. new electrical outlets & power poles.Details
suite #280: t.i. replace (e) light fixutures with led. remove and replace (e) breakroom cabinetes, remove 1 private office, remove (e) wall at conference room, replace with tempered glass. minor ada improvement at restroom. new electrical outlets & power poles. | $65,000 |
| Jul 24, 2014 | Completed final sign-off May 2015 | 212 California St | revision appl 201208308628. revise interior layout per plans. no change to building facade. maher n/a.Details
revision appl 201208308628. revise interior layout per plans. no change to building facade. maher n/a. | $20,000 |
| Jul 14, 2014 | Completed final sign-off Dec 2014 | 170 Columbus Av | #280- demolition of non-bearing partitions at private offices in suite 280 per ab-017Details
#280- demolition of non-bearing partitions at private offices in suite 280 per ab-017 | $5,000 |
| Mar 31, 2014 | Completed final sign-off Apr 2014 | 170 Columbus Av | tenant improvement: remove 2 walls & built in workstations, (n) non rated wall to create 2 offices in (e) single office. install salvaged (e) door. revise light switching, add 5 power outlets,plus 6 data outlets. revise door swing in womens restroom stall, move toilet partition in mens room.Details
tenant improvement: remove 2 walls & built in workstations, (n) non rated wall to create 2 offices in (e) single office. install salvaged (e) door. revise light switching, add 5 power outlets,plus 6 data outlets. revise door swing in womens restroom stall, move toilet partition in mens room. | $60,717 |
| Dec 9, 2013 | Completed final sign-off Jun 2014 | 150 Columbus Av | t.i. at lower level - remodel existing restrooms, add breakroom including cabinets and sink. new walls to create 2 small rooms. add glas wall with 2 doors at now loungeDetails
t.i. at lower level - remodel existing restrooms, add breakroom including cabinets and sink. new walls to create 2 small rooms. add glas wall with 2 doors at now lounge | $125,000 |
| Oct 25, 2013 | Completed final sign-off Dec 2013 | 170 Columbus Av | suite #300-t.i within (e) office bldg-2 new non rated partitions to create conference rm, re-use light swtiches, add 3 power outlets, 2 data outlets. new door within (e) wall. ada upgrades-new cabinets @sink to replace (e), repl grab bars @both restrms, re-use door swing into h.c stall @both restrmsDetails
suite #300-t.i within (e) office bldg-2 new non rated partitions to create conference rm, re-use light swtiches, add 3 power outlets, 2 data outlets. new door within (e) wall. ada upgrades-new cabinets @sink to replace (e), repl grab bars @both restrms, re-use door swing into h.c stall @both restrms | $17,500 |