New Era Construction Co. ***Check Id****
- Based in
- Sacramento
- On San Francisco permits
- Nov 2001 to Aug 2016
- Last 24 months
- 0 permits filed
149 permits since 2000: 108 completed, 27 never finaled, 14 expired or cancelled.
Of the 27 never-finaled permits, 27 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 149.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2016 | Never finaled issued Aug 2016, no final | 150 Gold Mine Dr | replace plmbing fixtures in 2 bathrooms. install new wall & floor tiles. replace exh fans in bathroom & light fixtures. no change on walls.Details
replace plmbing fixtures in 2 bathrooms. install new wall & floor tiles. replace exh fans in bathroom & light fixtures. no change on walls. | $10,000 |
| Jun 9, 2016 | Expired or cancelled expired Sep 2024 | 240 Flournoy St | 1)basement remodeling of a single family. 2) add 2 bedroom, one full bath and one family bedroom at basement. 3) electrical plumbing and mechanical under seperate permit.Details
1)basement remodeling of a single family. 2) add 2 bedroom, one full bath and one family bedroom at basement. 3) electrical plumbing and mechanical under seperate permit. | $30,000 |
| Jun 19, 2015 | Completed final sign-off Jul 2015 | 1125 Stockton St | up grade to ul 300Details
up grade to ul 300 | $3,000 |
| Jun 8, 2015 | Completed final sign-off Mar 2018 | 2025 Stockton St | soft story upgrade on ground floor incld. (n) shearwalls & foundation in compliance w/mandatory program, infill (1) window at front facadeDetails
soft story upgrade on ground floor incld. (n) shearwalls & foundation in compliance w/mandatory program, infill (1) window at front facade | $65,000 |
| May 6, 2015 | Never finaled issued May 2015, no final | 953 Key Av | install separate gas line for separate (two) buildings on one lot - gas & electrical work; work will benefit both units. front building 953 key/rear building 953a - work to be done in 953 front building.Details
install separate gas line for separate (two) buildings on one lot - gas & electrical work; work will benefit both units. front building 953 key/rear building 953a - work to be done in 953 front building. | $1,000 |
| Mar 13, 2015 | Completed final sign-off Mar 2015 | 352 Corbett Av | make new cement board on outside wall (100sq. ft)not visible from street to repair damaged sidingDetails
make new cement board on outside wall (100sq. ft)not visible from street to repair damaged siding | $2,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 2092 Thomas Av | at garage level 1st floor relocate extg bedroom, extg family room and laundry. new outlet, light fixtures and doors.Details
at garage level 1st floor relocate extg bedroom, extg family room and laundry. new outlet, light fixtures and doors. | $12,000 |
| Jan 7, 2015 | Never finaled issued Mar 2015, no final | 3528 Balboa St | interior tenant improvement for an existing restaurant, work includes upgrade the dining area & relocation of a food preparation/service area, and installation of a power door operator & rebuild an accessible restroom to comply with accessiblity requirements.Details
interior tenant improvement for an existing restaurant, work includes upgrade the dining area & relocation of a food preparation/service area, and installation of a power door operator & rebuild an accessible restroom to comply with accessiblity requirements. | $26,000 |
| Dec 17, 2014 | Completed final sign-off Aug 2015 | 1950 Page St | install new fire system total 313 fire sprinkler heads per nfpa-13. t.i. pa# 2013-0724-2667. n/a ordinance #155-13.Details
install new fire system total 313 fire sprinkler heads per nfpa-13. t.i. pa# 2013-0724-2667. n/a ordinance #155-13. | $100,000 |
| Nov 17, 2014 | Completed final sign-off Feb 2015 | 833 Balboa St | revision to appl #2013.0827.5315: at garage level 1st floor replace (e) deteriorated posts & footing w/new posts & footing, relcoate door at hall wall per plan.Details
revision to appl #2013.0827.5315: at garage level 1st floor replace (e) deteriorated posts & footing w/new posts & footing, relcoate door at hall wall per plan. | $1,000 |
| Oct 2, 2014 | Completed final sign-off Apr 2016 | 658 03rd Av | install new fire system total 73 fire sprinklers head. ref app#200711198515 includes new 4-inch fire serviceDetails
install new fire system total 73 fire sprinklers head. ref app#200711198515 includes new 4-inch fire service | $7,500 |
| Sep 12, 2014 | Never finaled issued Sep 2014, no final | 432 03rd Av | complete work and obtain final inspection for work under 201112060138Details
complete work and obtain final inspection for work under 201112060138 | $20,000 |
| Jul 8, 2014 | Completed final sign-off Jun 2015 | 4114 Pacheco St | upgrade (e) bedroom, construct family room, one full bathroom & laundry at ground floor.Details
upgrade (e) bedroom, construct family room, one full bathroom & laundry at ground floor. | $34,000 |
| Jun 17, 2014 | Completed final sign-off Aug 2014 | 2127 Ocean Av | to obtain final inspection for work approved under pa# 201303081860. all work is complete.Details
to obtain final inspection for work approved under pa# 201303081860. all work is complete. | |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 710 Edinburgh St | remodel (2) bathroom on 1st and 2nd floorDetails
remodel (2) bathroom on 1st and 2nd floor | $7,000 |
| Jun 16, 2014 | Completed final sign-off Jan 2016 | 3978 18th St | removed and replaced existing rear deck and existing stairs.Details
removed and replaced existing rear deck and existing stairs. | $10,000 |
| Apr 11, 2014 | Completed final sign-off Aug 2014 | 615 Jackson St | modified 21 fire sprinkler heads for dining room remodel in existing restaurantDetails
modified 21 fire sprinkler heads for dining room remodel in existing restaurant | $4,200 |
| Apr 3, 2014 | Completed final sign-off Jul 2016 | 2537 22nd Av | kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work.Details
kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work. | $6,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 939 Clement St | repair siding at rear exterior of building (approx. 10-15 ft high). repair wall leaks 300 ft(2). no structural work.Details
repair siding at rear exterior of building (approx. 10-15 ft high). repair wall leaks 300 ft(2). no structural work. | $8,000 |
| Mar 27, 2014 | Never finaled issued Mar 2014, no final | 1422 Ocean Av | upgrade to ul-300Details
upgrade to ul-300 | $3,000 |
| Mar 18, 2014 | Completed final sign-off Aug 2014 | 3980 18th St | remodel kitchen and bath, add 1/2 bath with new window opening, replace windows, move deck door at enclosed porchDetails
remodel kitchen and bath, add 1/2 bath with new window opening, replace windows, move deck door at enclosed porch | $18,500 |
| Jan 23, 2014 | Completed final sign-off Apr 2014 | 809 Lyon St | ground floor - install 17 heads. ref pa #2012.0615.2694.Details
ground floor - install 17 heads. ref pa #2012.0615.2694. | $8,000 |
| Jan 21, 2014 | Completed final sign-off Aug 2014 | 183 Paris St | divide extg family room into 2 bedroom. construct one new bath room. storage room and legalize one extg bath room and laundry room. all work at ground floor.Details
divide extg family room into 2 bedroom. construct one new bath room. storage room and legalize one extg bath room and laundry room. all work at ground floor. | $38,000 |
| Jan 8, 2014 | Never finaled issued Jan 2014, no final | 1310 Geneva Av | ground floor install new fire sprinkler system w/new underground 1-1/2" combination service type k. ground floor: 18 heads. 1st floor:16 heads. 2nd floor:20 heads. ref app#201301047264Details
ground floor install new fire sprinkler system w/new underground 1-1/2" combination service type k. ground floor: 18 heads. 1st floor:16 heads. 2nd floor:20 heads. ref app#201301047264 | $8,000 |
| Jan 2, 2014 | Completed final sign-off Jul 2014 | 26 Saint Charles Av | convert (e) study room. family room into 2 (n) bedrooms one (n) full bath & one (n) storage at rear portion of (e) garage. add one full and one 1/2 bath at second floor.Details
convert (e) study room. family room into 2 (n) bedrooms one (n) full bath & one (n) storage at rear portion of (e) garage. add one full and one 1/2 bath at second floor. | $20,000 |
| Dec 27, 2013 | Never finaled issued Dec 2013, no final | 2358 29th Av | revision to approved pa#2013-1115-2072. remodel (e) kitchen & revise (e) bathrm. layout at 2nd fl per plan.Details
revision to approved pa#2013-1115-2072. remodel (e) kitchen & revise (e) bathrm. layout at 2nd fl per plan. | $11,000 |
| Dec 18, 2013 | Never finaled issued Dec 2013, no final | 3978 18th St | repair siding (150 sq ft) in rearDetails
repair siding (150 sq ft) in rear | $2,500 |
| Dec 6, 2013 | Completed final sign-off Jan 2014 | 1548 Ocean Av | upgrade to ul 300. ansul systemDetails
upgrade to ul 300. ansul system | $3,000 |
| Nov 25, 2013 | Completed final sign-off Dec 2013 | 2728 San Bruno Av | hood and duct system, upgrade to ul300. ansul systemDetails
hood and duct system, upgrade to ul300. ansul system | $3,500 |
| Nov 22, 2013 | Never finaled issued Nov 2013, no final | 1355 Leavenworth St | to comply with nov 201316181. replace one window to fire escape apt #7 with metal-clad double hung sash.Details
to comply with nov 201316181. replace one window to fire escape apt #7 with metal-clad double hung sash. | $500 |
| Sep 16, 2013 | Completed final sign-off Dec 2013 | 1980 Sutter St | #302: remodel kitchen (re-purpose cabinets, kitchen sink, counter top).Details
#302: remodel kitchen (re-purpose cabinets, kitchen sink, counter top). | $3,500 |
| Sep 11, 2013 | Completed final sign-off Oct 2013 | 852 Pacheco St | take existing stucco off and install new 1" x 8" redwood siding at front of bldg.Details
take existing stucco off and install new 1" x 8" redwood siding at front of bldg. | $3,500 |
| Sep 5, 2013 | Completed final sign-off Nov 2013 | 3420 Ortega St | replacement stucco at front wall in kind (60%)Details
replacement stucco at front wall in kind (60%) | $3,000 |
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 1391 08th Av | #15- replacement cabinet & counter top at kitchen only.Details
#15- replacement cabinet & counter top at kitchen only. | $3,000 |
| Aug 27, 2013 | Completed final sign-off Feb 2015 | 833 Balboa St | to add two bedrooms, one half bathroom on existing gorund floor per plan.Details
to add two bedrooms, one half bathroom on existing gorund floor per plan. | $38,000 |
| Aug 5, 2013 | Completed final sign-off Oct 2013 | 136 Moneta Wy | rplacement of stucco at front and right side of buildingDetails
rplacement of stucco at front and right side of building | $6,000 |
| Jul 5, 2013 | Never finaled issued Jun 2014, no final | 2886 Geary Bl | install fire sprinkler system to sprinkler entire 2/f thru 4th floors to make the entire building fully sprinklered. ref arch submittil 2011/06/02/7305 for conversion of two office spaces to residential units.Details
install fire sprinkler system to sprinkler entire 2/f thru 4th floors to make the entire building fully sprinklered. ref arch submittil 2011/06/02/7305 for conversion of two office spaces to residential units. | $30,000 |
| Jul 5, 2013 | Completed final sign-off Aug 2014 | 2127 Ocean Av | revision to pa# 2013-0308-1860-replace (e) footing & slab in (e) garageDetails
revision to pa# 2013-0308-1860-replace (e) footing & slab in (e) garage | $5,000 |
| Jun 19, 2013 | Completed final sign-off Aug 2013 | 1548 Page St | repair fire in attic, replace existing warm air furnace and repair drywall @ ceiling & walls as required.Details
repair fire in attic, replace existing warm air furnace and repair drywall @ ceiling & walls as required. | $5,000 |
| May 28, 2013 | Expired or cancelled expired Dec 2014 | 1391 08th Av | remodel kitchen and bath.Details
remodel kitchen and bath. | $6,000 |
| Mar 8, 2013 | Completed final sign-off Aug 2014 | 2127 Ocean Av | add new bedroom, family room, bathroom, laundry area at ground floor. replace e footing and slab, posts, and beam at gr floor perm planDetails
add new bedroom, family room, bathroom, laundry area at ground floor. replace e footing and slab, posts, and beam at gr floor perm plan | $60,000 |
| Feb 8, 2013 | Completed final sign-off Feb 2013 | 658 26th Av | remove &(e) replacement new heather system in garage, in same locationDetails
remove &(e) replacement new heather system in garage, in same location | $5,000 |
| Jan 2, 2013 | Completed final sign-off Oct 2013 | 4324 Anza St | install (n) fire sprinkler system per nfpa 13r for new unit addition on 3rd fl. total 20 heads. includes underground. reference to pa # 201101118224Details
install (n) fire sprinkler system per nfpa 13r for new unit addition on 3rd fl. total 20 heads. includes underground. reference to pa # 201101118224 | $10,000 |
| Nov 6, 2012 | Completed final sign-off Jan 2013 | 56 Crane St | add one (n) bath, two (n) bedrooms, one (n) family, & one (n) laundry on ground floor. replace (e) furnace & water heater.Details
add one (n) bath, two (n) bedrooms, one (n) family, & one (n) laundry on ground floor. replace (e) furnace & water heater. | $38,000 |
| Sep 19, 2012 | Completed final sign-off Dec 2012 | 755 Cayuga Av | remodel one full bathroom on ground floor. all new plumbing fixts & finishes. bathroom permitted previously#9321161. no change on walls.Details
remodel one full bathroom on ground floor. all new plumbing fixts & finishes. bathroom permitted previously#9321161. no change on walls. | $8,000 |
| Sep 17, 2012 | Completed final sign-off Feb 2016 | 2191 Irving St | upgrade to ul-300 for "happy bakery"Details
upgrade to ul-300 for "happy bakery" | $3,500 |
| Aug 6, 2012 | Completed final sign-off Aug 2012 | 51 Riverton Dr | replace 2x3 window and painting at restroom. repair roof less than 10%Details
replace 2x3 window and painting at restroom. repair roof less than 10% | $2,000 |
| Aug 3, 2012 | Completed final sign-off Aug 2012 | 701 Clement St | repair and painting stair. less than 50%Details
repair and painting stair. less than 50% | $3,000 |
| Jun 22, 2012 | Completed final sign-off Jan 2013 | 360 Yerba Buena Av | new bathroom storage & entertainment room to be constructed at ground floor per plan. replace (e) windows per plan. new rear deck at 2nd. floor.Details
new bathroom storage & entertainment room to be constructed at ground floor per plan. replace (e) windows per plan. new rear deck at 2nd. floor. | $38,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 765 Brussels St | replace extg wood stair and deck with new in like kind and same size at rear yard.Details
replace extg wood stair and deck with new in like kind and same size at rear yard. | $16,000 |
| Mar 23, 2012 | Completed final sign-off May 2012 | 2271 31st Av | replace cabinets & remove two restroom. no structural work. new lighting comply w/cec 150(k).Details
replace cabinets & remove two restroom. no structural work. new lighting comply w/cec 150(k). | $28,000 |
| Mar 12, 2012 | Completed final sign-off Apr 2012 | 4411 Geary Bl | revise approved app 201107079655 to add sauna room in e accessible shower areaDetails
revise approved app 201107079655 to add sauna room in e accessible shower area | $3,000 |
| Mar 8, 2012 | Completed final sign-off Jul 2012 | 383 Rhode Island St | new handrails for main stair, all 3 floors, and replace front glass door in like kind.Details
new handrails for main stair, all 3 floors, and replace front glass door in like kind. | $9,500 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 1391 08th Av | replace cabinet and sink.Details
replace cabinet and sink. | $3,500 |
| Jan 3, 2012 | Completed final sign-off Jun 2012 | 164 21st Av | unit #164-legalize kitchen & bathrm remodel, remove/repl furnace & windows in kind, new flooring. unit #166-remodel kitchen & bathrm, repl furnace & rear exterior stairs, (e) windows in kind. max ufactor .40 demo (e) construction on ground fl & return to storage, windows not visible from streetDetails
unit #164-legalize kitchen & bathrm remodel, remove/repl furnace & windows in kind, new flooring. unit #166-remodel kitchen & bathrm, repl furnace & rear exterior stairs, (e) windows in kind. max ufactor .40 demo (e) construction on ground fl & return to storage, windows not visible from street | $45,000 |
| Dec 20, 2011 | Completed final sign-off Apr 2012 | 555 Huron Av | remodel ground floor to have 1 bedroom, 1 family room, 1 full bathroom & storageDetails
remodel ground floor to have 1 bedroom, 1 family room, 1 full bathroom & storage | $21,500 |
| Dec 6, 2011 | Expired or cancelled cancelled Jan 2024 | 432 03rd Av | remodel (e) ground flr.: add one storage (note: (e) building (front) has only parking space to remain.Details
remodel (e) ground flr.: add one storage (note: (e) building (front) has only parking space to remain. | $20,000 |
| Oct 31, 2011 | Never finaled issued Oct 2011, no final | 2499 Lombard St | upgrade to ul 300 fire suppression hood and duct systemDetails
upgrade to ul 300 fire suppression hood and duct system | $4,500 |
| Oct 26, 2011 | Never finaled issued Nov 2011, no final | 801 Kearny St | install new fire sprinkler system in accordance with nfpa 13 for a new restaurant, 109 sprinkler heads; and new 4" underground.Details
install new fire sprinkler system in accordance with nfpa 13 for a new restaurant, 109 sprinkler heads; and new 4" underground. | $30,000 |
| Oct 24, 2011 | Completed final sign-off Jan 2012 | 1814 Anza St | replace the building front wall dryrot and replace new stucco (300 sq. ft.) less than 50% repair at rear stairs.Details
replace the building front wall dryrot and replace new stucco (300 sq. ft.) less than 50% repair at rear stairs. | $3,000 |
| Aug 23, 2011 | Completed final sign-off Apr 2012 | 3876 California St | interior remodel of unit #4 only:1)convert (e) living room to new bedroom and convert (e) bedroom to new master bedroom with full bath.2) eliminate hallway to enlarge dining room and bathroom 3)remodel kitchen with new cabinets and fixtures. 4)replace and upgrade electric and plmg system.Details
interior remodel of unit #4 only:1)convert (e) living room to new bedroom and convert (e) bedroom to new master bedroom with full bath.2) eliminate hallway to enlarge dining room and bathroom 3)remodel kitchen with new cabinets and fixtures. 4)replace and upgrade electric and plmg system. | $50,000 |
| Jul 7, 2011 | Completed final sign-off Apr 2012 | 4411 Geary Bl | suite 100 - convert a chiropractic doctor office into a foot & body massage establishment center. no lock doors, 4 employees, open daily from 10 am to 10 pm. "heaven wellness center".Details
suite 100 - convert a chiropractic doctor office into a foot & body massage establishment center. no lock doors, 4 employees, open daily from 10 am to 10 pm. "heaven wellness center". | $12,000 |
| Jul 1, 2011 | Completed final sign-off Oct 2011 | 3420 Judah St | upgrade commercial hood to ul-300.Details
upgrade commercial hood to ul-300. | $1,700 |
| Mar 21, 2011 | Expired or cancelled expired Apr 2013 | 2921 Wawona St | to obtain for final inspection for work approved under app#2005-08-17-0502 all work is completeDetails
to obtain for final inspection for work approved under app#2005-08-17-0502 all work is complete | |
| Mar 21, 2011 | Expired or cancelled expired Apr 2013 | 2921 Wawona St | to obtain for final inspection for work approved under app#2005-08-02056781s. all work is completeDetails
to obtain for final inspection for work approved under app#2005-08-02056781s. all work is complete | |
| Mar 17, 2011 | Completed final sign-off Aug 2011 | 131 Bacon St | convert (e) laundry to study room, add (n) family room, bedroom & storage room, & add (n) toilet at ground floor.Details
convert (e) laundry to study room, add (n) family room, bedroom & storage room, & add (n) toilet at ground floor. | $30,000 |
| Jan 26, 2011 | Completed final sign-off Jun 2011 | 1199 Stockton St | convert (e) clothes retail store into a fish market. change in use.Details
convert (e) clothes retail store into a fish market. change in use. | $30,000 |
| Dec 23, 2010 | Completed final sign-off May 2012 | 434 Larkin St | improvements for handicap accessibility: new toilet rooms, entrance and sales counter, add mop and hand sink to kitchen, replace ligth fixtures.Details
improvements for handicap accessibility: new toilet rooms, entrance and sales counter, add mop and hand sink to kitchen, replace ligth fixtures. | $43,500 |
| Dec 13, 2010 | Completed final sign-off Dec 2010 | 2034 Mission St | fire supression: revision to 201007146585.upgrade to ul 300. add griddle to fire suppression planDetails
fire supression: revision to 201007146585.upgrade to ul 300. add griddle to fire suppression plan | $3,500 |
| Dec 10, 2010 | Never finaled issued Dec 2010, no final | 1042 Taraval St | erect a sign holder at storefront (posts)Details
erect a sign holder at storefront (posts) | $3,000 |
| Dec 10, 2010 | Never finaled issued Dec 2010, no final | 1042 Taraval St | to erect electrical non structural signDetails
to erect electrical non structural sign | $3,000 |
| Oct 22, 2010 | Completed final sign-off Jan 2011 | 43 Stoneyford Av | increase estimated cost of construction by $1500 per field inspector's comment for permit applic. no. 201010122794.Details
increase estimated cost of construction by $1500 per field inspector's comment for permit applic. no. 201010122794. | $1,500 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 1409 Masonic Av | unit #3: replace plumbing fixtures in apartment #3, full bathroom, no wall removed or added, provide h.e. lights or o.s per cec 150(k)Details
unit #3: replace plumbing fixtures in apartment #3, full bathroom, no wall removed or added, provide h.e. lights or o.s per cec 150(k) | $4,000 |
| Oct 12, 2010 | Completed final sign-off Jan 2011 | 43 Stoneyford Av | replace the front door stucco, approx 300 sq.ft. area.Details
replace the front door stucco, approx 300 sq.ft. area. | $2,000 |
| Aug 30, 2010 | Completed final sign-off Sep 2010 | 539 06th Av | repair front of house(150 sq ft). repair in kindDetails
repair front of house(150 sq ft). repair in kind | $2,500 |
| Jul 22, 2010 | Completed final sign-off Jan 2011 | 1367 39th Av | remodel ground flr. to a non-ambulatory residential care home for 6 or less clients w/ 4-bedrms, 1-game rm. 1-full bathrm, laundry/mech. rm. 2nd. flr.: remodel (e) kitchen & bathrm with (n) fixtures, cabinets & finish. add 1-full bathrm. & guest rm. 6 non-ambDetails
remodel ground flr. to a non-ambulatory residential care home for 6 or less clients w/ 4-bedrms, 1-game rm. 1-full bathrm, laundry/mech. rm. 2nd. flr.: remodel (e) kitchen & bathrm with (n) fixtures, cabinets & finish. add 1-full bathrm. & guest rm. 6 non-amb | $100,000 |
| Jul 14, 2010 | Completed final sign-off Dec 2010 | 2034 Mission St | upgrade to ul 300 ( ansul system) to existing " western donut chinese food restaurant "Details
upgrade to ul 300 ( ansul system) to existing " western donut chinese food restaurant " | $3,500 |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 1328 46th Av | the front wall of the house has been nail on new cement board (siding) -keep existing old redwood siding; -put roll vy-tex 4'x8' black paperDetails
the front wall of the house has been nail on new cement board (siding) -keep existing old redwood siding; -put roll vy-tex 4'x8' black paper | $1,200 |
| Jun 23, 2010 | Completed final sign-off Oct 2010 | 2611 17th Av | dry rot repair. remove (e) damaged wood and replace stucco in kind approx. 30 sqft in the front wall of the buildingDetails
dry rot repair. remove (e) damaged wood and replace stucco in kind approx. 30 sqft in the front wall of the building | $600 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 1360 09th Av | upgrade to ul-300 ansul system.Details
upgrade to ul-300 ansul system. | $4,500 |
| May 28, 2010 | Completed final sign-off Jul 2010 | 350 Corbett Av | remodel existing bathroom, to upgrade upstairs #352, provide high efficacy lights on t-24 o.s. & exhaust fansDetails
remodel existing bathroom, to upgrade upstairs #352, provide high efficacy lights on t-24 o.s. & exhaust fans | $8,000 |
| May 13, 2010 | Completed final sign-off May 2010 | 414 Columbus Av | remove the extng door leading to the stairs make a landing of 3'x3' in place the door before access to the stairs. construct two walls at the sides of the landing. reinstall the door beyond the landing.Details
remove the extng door leading to the stairs make a landing of 3'x3' in place the door before access to the stairs. construct two walls at the sides of the landing. reinstall the door beyond the landing. | $600 |
| Mar 31, 2010 | Completed final sign-off Apr 2010 | 414 Columbus Av | in compliance of violation; take-down plastic tent. complaint @200233660(resolved by p.a.#200306066516, nov#200734737.Details
in compliance of violation; take-down plastic tent. complaint @200233660(resolved by p.a.#200306066516, nov#200734737. | $2,000 |
| Mar 1, 2010 | Completed final sign-off Dec 2010 | 1920 Pine St | install fire sprinkler system for 1st fl new residential areas in units 5/6 per building app 2009032304576. total 16 headsDetails
install fire sprinkler system for 1st fl new residential areas in units 5/6 per building app 2009032304576. total 16 heads | $5,000 |
| Jan 4, 2010 | Expired or cancelled cancelled Apr 2010 | 15 Foerster St | 200912223708: floor layout change. relocate laundry room to approved storage room next to garage. delete storage and hall.Details
200912223708: floor layout change. relocate laundry room to approved storage room next to garage. delete storage and hall. | |
| Dec 30, 2009 | Never finaled issued Jan 2010, no final | 2139 Polk St | unit a: new ansul system to meet ul 300Details
unit a: new ansul system to meet ul 300 | $4,700 |
| Nov 19, 2009 | Never finaled issued Dec 2009, no final | 1222 Noriega St | upgrade hood & duct system to meet ul-300.Details
upgrade hood & duct system to meet ul-300. | $3,500 |
| Nov 18, 2009 | Completed final sign-off Sep 2011 | 2345 Mission St | modify existing fire sprinkler system for t.i. add 28 sprinkler heads.Details
modify existing fire sprinkler system for t.i. add 28 sprinkler heads. | $4,800 |
| Nov 3, 2009 | Completed final sign-off Jun 2010 | 629 Taylor St | nov #200920828. add 3 bathtubs in room #1, #2, & #3. upgrade existing toilet to ada compliant by adding grab bars & replace (e) lavatory with new. remove hallway wall for elevator access. (golden pearl spa)Details
nov #200920828. add 3 bathtubs in room #1, #2, & #3. upgrade existing toilet to ada compliant by adding grab bars & replace (e) lavatory with new. remove hallway wall for elevator access. (golden pearl spa) | $7,200 |
| Oct 27, 2009 | Completed final sign-off Jan 2010 | 855 La Playa | replace kitchen cabients, countertop & sink. provide min 50% of ktichen lighting wattage in high efficancy lights.Details
replace kitchen cabients, countertop & sink. provide min 50% of ktichen lighting wattage in high efficancy lights. | $3,000 |
| Sep 23, 2009 | Completed final sign-off Jun 2010 | 201 Upper Tr | interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage.Details
interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage. | $50,000 |
| Sep 21, 2009 | Completed final sign-off Nov 2009 | 350 Corbett Av | remodel existing kitchen to upgrade counter tops, cabinets and tile floor. lighting. min 50% of kitchen light wattage shall be of. h.e. lights.Details
remodel existing kitchen to upgrade counter tops, cabinets and tile floor. lighting. min 50% of kitchen light wattage shall be of. h.e. lights. | $9,000 |
| Sep 18, 2009 | Completed final sign-off Mar 2010 | 522 Judah St | work on apt#1. remodeling two bathrooms, two bedrooms, kitchen, living rooms dinning room. change new vinyl window total (24) @ rear. not structural work.Details
work on apt#1. remodeling two bathrooms, two bedrooms, kitchen, living rooms dinning room. change new vinyl window total (24) @ rear. not structural work. | $30,000 |
| Sep 10, 2009 | Never finaled issued Sep 2009, no final | 1400 California St | upgrade hood and duct system to meet ul 300Details
upgrade hood and duct system to meet ul 300 | $3,400 |
| Sep 8, 2009 | Completed final sign-off Oct 2009 | 4222 18th St | comply with nov 200920774. repair rear deck porch. tenants put the old rail back @ exterior stairway.repair rotten landing wood on back deck. repair heat vents. repair back door/frame and porch door. less than 50% in kind.Details
comply with nov 200920774. repair rear deck porch. tenants put the old rail back @ exterior stairway.repair rotten landing wood on back deck. repair heat vents. repair back door/frame and porch door. less than 50% in kind. | $500 |
| Aug 28, 2009 | Never finaled issued Dec 2009, no final | 2433 Franklin St | install 17 fire sprinkler heads in garage. construct 1 hr wall per sffdDetails
install 17 fire sprinkler heads in garage. construct 1 hr wall per sffd | $3,800 |
| Aug 20, 2009 | Completed final sign-off Nov 2010 | 3303 Mission St | upgrade head and ansul system to meet ul-300.Details
upgrade head and ansul system to meet ul-300. | $2,100 |
| Jul 28, 2009 | Completed final sign-off Mar 2010 | 990 Polk St | first tenant improvement to new vacant commercial. new commercial retail coffee shop ( 990 space "b" )Details
first tenant improvement to new vacant commercial. new commercial retail coffee shop ( 990 space "b" ) | $40,000 |
| Jun 23, 2009 | Never finaled issued Aug 2009, no final | 1016 Bryant St | ansul system to meet ul 300 in existing hoodDetails
ansul system to meet ul 300 in existing hood | $3,600 |
| Mar 27, 2009 | Completed final sign-off Jun 2009 | 974 Rhode Island St | comply w/physcial inspection report 3r-4999 to legalize (e) bathroom & laundry room at ground floor, modify (e) plumbing & electrical systems to compliance w/current 2007 code on 2nd floor, repair collapsed patio step less than 20% at rear yard.Details
comply w/physcial inspection report 3r-4999 to legalize (e) bathroom & laundry room at ground floor, modify (e) plumbing & electrical systems to compliance w/current 2007 code on 2nd floor, repair collapsed patio step less than 20% at rear yard. | $5,000 |