Back to bathroom remodel contractors
New Era Construction Co. ***Check Id****
- Based in
- Sacramento
- On San Francisco permits
- Nov 2001 to Aug 2016
- Last 24 months
- 0 permits filed
149 permits since 2000: 108 completed, 27 never finaled, 14 expired or cancelled.
Of the 27 never-finaled permits, 27 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
48 bathroom remodel permits: 40 completed, 4 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2016 | Never finaled issued Aug 2016, no final | 150 Gold Mine Dr | replace plmbing fixtures in 2 bathrooms. install new wall & floor tiles. replace exh fans in bathroom & light fixtures. no change on walls.Details
replace plmbing fixtures in 2 bathrooms. install new wall & floor tiles. replace exh fans in bathroom & light fixtures. no change on walls. | $10,000 |
| Jun 9, 2016 | Expired or cancelled expired Sep 2024 | 240 Flournoy St | 1)basement remodeling of a single family. 2) add 2 bedroom, one full bath and one family bedroom at basement. 3) electrical plumbing and mechanical under seperate permit.Details
1)basement remodeling of a single family. 2) add 2 bedroom, one full bath and one family bedroom at basement. 3) electrical plumbing and mechanical under seperate permit. | $30,000 |
| Jul 8, 2014 | Completed final sign-off Jun 2015 | 4114 Pacheco St | upgrade (e) bedroom, construct family room, one full bathroom & laundry at ground floor.Details
upgrade (e) bedroom, construct family room, one full bathroom & laundry at ground floor. | $34,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 710 Edinburgh St | remodel (2) bathroom on 1st and 2nd floorDetails
remodel (2) bathroom on 1st and 2nd floor | $7,000 |
| Apr 3, 2014 | Completed final sign-off Jul 2016 | 2537 22nd Av | kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work.Details
kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work. | $6,000 |
| Mar 18, 2014 | Completed final sign-off Aug 2014 | 3980 18th St | remodel kitchen and bath, add 1/2 bath with new window opening, replace windows, move deck door at enclosed porchDetails
remodel kitchen and bath, add 1/2 bath with new window opening, replace windows, move deck door at enclosed porch | $18,500 |
| Jan 21, 2014 | Completed final sign-off Aug 2014 | 183 Paris St | divide extg family room into 2 bedroom. construct one new bath room. storage room and legalize one extg bath room and laundry room. all work at ground floor.Details
divide extg family room into 2 bedroom. construct one new bath room. storage room and legalize one extg bath room and laundry room. all work at ground floor. | $38,000 |
| Jan 2, 2014 | Completed final sign-off Jul 2014 | 26 Saint Charles Av | convert (e) study room. family room into 2 (n) bedrooms one (n) full bath & one (n) storage at rear portion of (e) garage. add one full and one 1/2 bath at second floor.Details
convert (e) study room. family room into 2 (n) bedrooms one (n) full bath & one (n) storage at rear portion of (e) garage. add one full and one 1/2 bath at second floor. | $20,000 |
| Aug 27, 2013 | Completed final sign-off Feb 2015 | 833 Balboa St | to add two bedrooms, one half bathroom on existing gorund floor per plan.Details
to add two bedrooms, one half bathroom on existing gorund floor per plan. | $38,000 |
| May 28, 2013 | Expired or cancelled expired Dec 2014 | 1391 08th Av | remodel kitchen and bath.Details
remodel kitchen and bath. | $6,000 |
| Mar 8, 2013 | Completed final sign-off Aug 2014 | 2127 Ocean Av | add new bedroom, family room, bathroom, laundry area at ground floor. replace e footing and slab, posts, and beam at gr floor perm planDetails
add new bedroom, family room, bathroom, laundry area at ground floor. replace e footing and slab, posts, and beam at gr floor perm plan | $60,000 |
| Nov 6, 2012 | Completed final sign-off Jan 2013 | 56 Crane St | add one (n) bath, two (n) bedrooms, one (n) family, & one (n) laundry on ground floor. replace (e) furnace & water heater.Details
add one (n) bath, two (n) bedrooms, one (n) family, & one (n) laundry on ground floor. replace (e) furnace & water heater. | $38,000 |
| Sep 19, 2012 | Completed final sign-off Dec 2012 | 755 Cayuga Av | remodel one full bathroom on ground floor. all new plumbing fixts & finishes. bathroom permitted previously#9321161. no change on walls.Details
remodel one full bathroom on ground floor. all new plumbing fixts & finishes. bathroom permitted previously#9321161. no change on walls. | $8,000 |
| Jun 22, 2012 | Completed final sign-off Jan 2013 | 360 Yerba Buena Av | new bathroom storage & entertainment room to be constructed at ground floor per plan. replace (e) windows per plan. new rear deck at 2nd. floor.Details
new bathroom storage & entertainment room to be constructed at ground floor per plan. replace (e) windows per plan. new rear deck at 2nd. floor. | $38,000 |
| Dec 20, 2011 | Completed final sign-off Apr 2012 | 555 Huron Av | remodel ground floor to have 1 bedroom, 1 family room, 1 full bathroom & storageDetails
remodel ground floor to have 1 bedroom, 1 family room, 1 full bathroom & storage | $21,500 |
| Aug 23, 2011 | Completed final sign-off Apr 2012 | 3876 California St | interior remodel of unit #4 only:1)convert (e) living room to new bedroom and convert (e) bedroom to new master bedroom with full bath.2) eliminate hallway to enlarge dining room and bathroom 3)remodel kitchen with new cabinets and fixtures. 4)replace and upgrade electric and plmg system.Details
interior remodel of unit #4 only:1)convert (e) living room to new bedroom and convert (e) bedroom to new master bedroom with full bath.2) eliminate hallway to enlarge dining room and bathroom 3)remodel kitchen with new cabinets and fixtures. 4)replace and upgrade electric and plmg system. | $50,000 |
| Oct 14, 2010 | Completed final sign-off Nov 2010 | 1409 Masonic Av | unit #3: replace plumbing fixtures in apartment #3, full bathroom, no wall removed or added, provide h.e. lights or o.s per cec 150(k)Details
unit #3: replace plumbing fixtures in apartment #3, full bathroom, no wall removed or added, provide h.e. lights or o.s per cec 150(k) | $4,000 |
| May 28, 2010 | Completed final sign-off Jul 2010 | 350 Corbett Av | remodel existing bathroom, to upgrade upstairs #352, provide high efficacy lights on t-24 o.s. & exhaust fansDetails
remodel existing bathroom, to upgrade upstairs #352, provide high efficacy lights on t-24 o.s. & exhaust fans | $8,000 |
| Sep 23, 2009 | Completed final sign-off Jun 2010 | 201 Upper Tr | interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage.Details
interior remodel of (1) kitchen and (1) bathroom in each unit. addition of (1) new bathroom in each unit. no proposed exterior work. no proposed addition to square footage. | $50,000 |
| Sep 18, 2009 | Completed final sign-off Mar 2010 | 522 Judah St | work on apt#1. remodeling two bathrooms, two bedrooms, kitchen, living rooms dinning room. change new vinyl window total (24) @ rear. not structural work.Details
work on apt#1. remodeling two bathrooms, two bedrooms, kitchen, living rooms dinning room. change new vinyl window total (24) @ rear. not structural work. | $30,000 |
| Mar 27, 2009 | Completed final sign-off Jun 2009 | 974 Rhode Island St | comply w/physcial inspection report 3r-4999 to legalize (e) bathroom & laundry room at ground floor, modify (e) plumbing & electrical systems to compliance w/current 2007 code on 2nd floor, repair collapsed patio step less than 20% at rear yard.Details
comply w/physcial inspection report 3r-4999 to legalize (e) bathroom & laundry room at ground floor, modify (e) plumbing & electrical systems to compliance w/current 2007 code on 2nd floor, repair collapsed patio step less than 20% at rear yard. | $5,000 |
| Sep 29, 2008 | Completed final sign-off Feb 2009 | 1751 19th Av | 1 new bedroom, study room, 2 full bath, laundry area to be constructed at ground floorDetails
1 new bedroom, study room, 2 full bath, laundry area to be constructed at ground floor | $30,000 |
| Sep 26, 2008 | Completed final sign-off Jan 2009 | 542 Bowdoin St | comply w/n.o.v. 200873807 & 200853566 - remove existing partition wall, stove & sink on 1st floor; add new bath, bedroom, storage, entertainment & laundry room on 1st floor.Details
comply w/n.o.v. 200873807 & 200853566 - remove existing partition wall, stove & sink on 1st floor; add new bath, bedroom, storage, entertainment & laundry room on 1st floor. | $30,000 |
| Aug 14, 2008 | Completed final sign-off Apr 2009 | 2046 44th Av | construct one bedroom, one full bathroom & convert (e) bedroom to family room. all work at ground floorDetails
construct one bedroom, one full bathroom & convert (e) bedroom to family room. all work at ground floor | $32,000 |
| Jul 16, 2008 | Completed final sign-off Nov 2008 | 115 Guerrero St | existing bathroom and kitchen remodeling in each unit. repair of existing interior wall of kitchen and bathroom. in each unit. no structural work.Details
existing bathroom and kitchen remodeling in each unit. repair of existing interior wall of kitchen and bathroom. in each unit. no structural work. | $29,000 |
| Jun 20, 2008 | Completed final sign-off May 2009 | 578 19th Av | 2 bedrooms, 1 full bath, and 1 storage room at gr floor, relocate interior stair, new sliding dr. 2nd fl: relocate/remodel kitchen and toilet rm,add new bath,new rear deck, 2 sliding doors. 3rd fl:infill opening to enlarge existing bath, add new bathDetails
2 bedrooms, 1 full bath, and 1 storage room at gr floor, relocate interior stair, new sliding dr. 2nd fl: relocate/remodel kitchen and toilet rm,add new bath,new rear deck, 2 sliding doors. 3rd fl:infill opening to enlarge existing bath, add new bath | $100,000 |
| May 2, 2008 | Completed final sign-off Jan 2009 | 1330 Fell St | remodel extg bathrooms & kitchen. relocate water heaters and furnaces. add a staircase to attic for maintenance use. replace all wndws same kind same size. replace gypsum board 5/8"x and install insulation around living area per plan provide self closing devices at entry door.Details
remodel extg bathrooms & kitchen. relocate water heaters and furnaces. add a staircase to attic for maintenance use. replace all wndws same kind same size. replace gypsum board 5/8"x and install insulation around living area per plan provide self closing devices at entry door. | $50,000 |
| Sep 27, 2007 | Completed final sign-off Jan 2008 | 125 Cortland Av | improvement of first floor with 1 bedroom, 1 bathroom and upgrade storage. resurface existing deck surface @ 2nd floor. rebuild stair with same existing foot print / plan.Details
improvement of first floor with 1 bedroom, 1 bathroom and upgrade storage. resurface existing deck surface @ 2nd floor. rebuild stair with same existing foot print / plan. | $45,000 |
| Aug 6, 2007 | Completed final sign-off Oct 2007 | 1758 18th Av | remodel ground floor bathroom, new bedroom and new storage room. bathroom to replace plumbing fixtures, new tile work, new lightingDetails
remodel ground floor bathroom, new bedroom and new storage room. bathroom to replace plumbing fixtures, new tile work, new lighting | $15,000 |
| May 15, 2007 | Completed final sign-off Dec 2007 | 234 Havelock St | replace extg front stair in kind with enclose the under space. add new stairs to connected upper floor and the ground floor. add new play room and bath room and storage room at the ground floorDetails
replace extg front stair in kind with enclose the under space. add new stairs to connected upper floor and the ground floor. add new play room and bath room and storage room at the ground floor | $25,000 |
| May 15, 2007 | Completed final sign-off Oct 2007 | 43 Arroyo Wy | bathroom remodel. replace tub, vanity, toilet, lighting. provide flourescent lights or occupancy sensor.Details
bathroom remodel. replace tub, vanity, toilet, lighting. provide flourescent lights or occupancy sensor. | $6,300 |
| May 7, 2007 | Completed final sign-off Aug 2007 | 2131 41st Av | legalize ground floor bedroom and full bathroom.Details
legalize ground floor bedroom and full bathroom. | $12,000 |
| Apr 20, 2007 | Never finaled issued Apr 2007, no final | 48 Manzanita Av | revision to appl#200612190185 to change the proposed 1 and 1/2 bath at the 2/f & 3/f into one bath each only. maintain part of the closet as pre-construction condition. all other details & notes of appl#200612190185 remainDetails
revision to appl#200612190185 to change the proposed 1 and 1/2 bath at the 2/f & 3/f into one bath each only. maintain part of the closet as pre-construction condition. all other details & notes of appl#200612190185 remain | |
| Apr 9, 2007 | Completed final sign-off Jul 2007 | 179 Maynard St | in basement: add one new bath & one storage, add one new window in family room, repair existing ceiling.Details
in basement: add one new bath & one storage, add one new window in family room, repair existing ceiling. | $12,000 |
| Mar 20, 2007 | Expired or cancelled expired Jun 2011 | 431 Spruce St | revision to 200610124888 in pat 437 (moving kitchen,2 bedrom,bath) revision to 200612079430,200701192134 in apt 433. level rear portion of bldg and add footing, see sec a, level bay window above at right side of bldg and replace footing and posts from 8"x8"x12" depth footing to 18" x 19"x 2 footingDetails
revision to 200610124888 in pat 437 (moving kitchen,2 bedrom,bath) revision to 200612079430,200701192134 in apt 433. level rear portion of bldg and add footing, see sec a, level bay window above at right side of bldg and replace footing and posts from 8"x8"x12" depth footing to 18" x 19"x 2 footing | $3,000 |
| Feb 5, 2007 | Completed final sign-off Mar 2007 | 491 Frederick St | work in unit# 4 (2nd floor) only. remodel the kitchen & bath room. no structural changes. flourescent lighting.Details
work in unit# 4 (2nd floor) only. remodel the kitchen & bath room. no structural changes. flourescent lighting. | $6,000 |
| Jan 26, 2007 | Completed final sign-off May 2007 | 11 Gilroy St | bathroom, game room addition on g/f. remodel kitchen and bathroom, dry rot repair on 2/fDetails
bathroom, game room addition on g/f. remodel kitchen and bathroom, dry rot repair on 2/f | $15,000 |
| Dec 28, 2006 | Completed final sign-off Jun 2007 | 3173 Sacramento St | bath remodel, kitchen remodel ( relocation of existing (n) lighting. bathroom lighting to be flourescant or on occupant sensor. 50% of wattage of kitchen. lighting to be flourescant. removing non bearing walls.Details
bath remodel, kitchen remodel ( relocation of existing (n) lighting. bathroom lighting to be flourescant or on occupant sensor. 50% of wattage of kitchen. lighting to be flourescant. removing non bearing walls. | $15,000 |
| Dec 19, 2006 | Never finaled issued Dec 2006, no final | 48 Manzanita Av | internal remodel of converting a closet into a full bathroom and add a 1/2 bathroom @ each unit. no extyerior work or stuctuctural changes.Details
internal remodel of converting a closet into a full bathroom and add a 1/2 bathroom @ each unit. no extyerior work or stuctuctural changes. | $10,000 |
| Nov 29, 2006 | Completed final sign-off Apr 2007 | 1056 Page St | remodel existing kitchen and bath room on existing 3rd floor and strengthen existing rear decks per planDetails
remodel existing kitchen and bath room on existing 3rd floor and strengthen existing rear decks per plan | $48,000 |
| Oct 25, 2006 | Expired or cancelled expired Aug 2007 | 903 Pine St | interior remodel unit#47 at 903 pine st. to comply with nov#200679713 (bid) . remodel kitchen and full bath with replacement of cabinets and fixtures. no change to wall and window. no structural changes. comply with (3) his nov#200679547,#200677773, and 200676610.Details
interior remodel unit#47 at 903 pine st. to comply with nov#200679713 (bid) . remodel kitchen and full bath with replacement of cabinets and fixtures. no change to wall and window. no structural changes. comply with (3) his nov#200679547,#200677773, and 200676610. | $10,000 |
| Oct 11, 2006 | Completed final sign-off Feb 2007 | 862 Moultrie St | add bathroom down stairs to include a shower, sink & toilet.Details
add bathroom down stairs to include a shower, sink & toilet. | $8,000 |
| Sep 12, 2006 | Completed final sign-off Dec 2006 | 1256 06th Av | interior remodel of 1256-6th ave (2nd floor), remodel kitchen full bath with replacement of all cabinets and fixtures. install flourescent light fixtures only in kitchen and bathroom. no changes to walls on windows.Details
interior remodel of 1256-6th ave (2nd floor), remodel kitchen full bath with replacement of all cabinets and fixtures. install flourescent light fixtures only in kitchen and bathroom. no changes to walls on windows. | $18,000 |
| Jul 12, 2006 | Completed final sign-off Nov 2006 | 626 Pine St | remodel kitchen & bathroom @ unit #303. replace (e) windows w/aluminum dh windows.Details
remodel kitchen & bathroom @ unit #303. replace (e) windows w/aluminum dh windows. | $10,000 |
| Jun 26, 2006 | Completed final sign-off Sep 2006 | 600 Buchanan St | interior remodel of gr floor, 4emodel kitchen,1 full bath,1/2 bath with rplacement of all cabinets and fixtures. no drywall changes. no changes to paritions or windowsDetails
interior remodel of gr floor, 4emodel kitchen,1 full bath,1/2 bath with rplacement of all cabinets and fixtures. no drywall changes. no changes to paritions or windows | $16,000 |
| Apr 19, 2006 | Completed final sign-off Jul 2006 | 602 Buchanan St | interior remodel of 2nd floor (620 buchanan st.) remodel kitchen and full bathroom w/ replacement of all cabinets and fixtures. replace plaster walls around kitchen and bathroom with dry wall. fluorescent lightingDetails
interior remodel of 2nd floor (620 buchanan st.) remodel kitchen and full bathroom w/ replacement of all cabinets and fixtures. replace plaster walls around kitchen and bathroom with dry wall. fluorescent lighting | $12,000 |
| Mar 9, 2006 | Never finaled issued Mar 2006, no final | 2191 35th Av | remodel kchn and full bathroomDetails
remodel kchn and full bathroom | $17,000 |
| Oct 1, 2004 | Completed final sign-off Nov 2004 | 4222 18th St | convert a closet on 2nd floor into a half bath with a water closet and lavatory.Details
convert a closet on 2nd floor into a half bath with a water closet and lavatory. | $3,000 |