Block 1763, lot 019B
1391 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 4
- Units
- 18
- Rooms
- 18 bathrooms
- Building
- 13,615 sq ft
- Lot
- 4,700 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2019 | Completed final sign-off Jul 2020 | 1391 08th Av | A M West Mechanical Inc. | install new fire sprinkler heads in the hallwayDetails
install new fire sprinkler heads in the hallway | $5,000 |
| Sep 13, 2019 | Completed final sign-off Aug 2020 | 1391 08th Av | S L M Development Inc. | comply w/ complaint 2019612191 provide (n) bedrooms and 1 media room ext units b,c,& e; revision to pa#201605238169Details
comply w/ complaint 2019612191 provide (n) bedrooms and 1 media room ext units b,c,& e; revision to pa#201605238169 | $5,000 |
| Jun 7, 2019 | Completed final sign-off Jun 2019 | 1391 08th Av | to document as 4 story 23 dwelling unit building. pa201509177276 issued to add 1 unit to 17 unit totaling 18 units. pa201605238169 was issued to add 5 dwelling units however the permit stated 17 existing units falsely, should have been 18 + 5 totaling 23 units.Details
to document as 4 story 23 dwelling unit building. pa201509177276 issued to add 1 unit to 17 unit totaling 18 units. pa201605238169 was issued to add 5 dwelling units however the permit stated 17 existing units falsely, should have been 18 + 5 totaling 23 units. | ||
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 1391 08th Av | street spaceDetails
street space | ||
| May 17, 2018 | Completed final sign-off Jul 2018 | 1391 08th Av | A M West Mechanical Inc. | service line for fire sprinkler system from curb to the building ref 201707101371Details
service line for fire sprinkler system from curb to the building ref 201707101371 | $5,000 |
| May 10, 2018 | Completed final sign-off Aug 2018 | 1391 08th Av | Bay Alarm Company | install fire alarm for new adus. add low frequency sounders to existing units-to comply with sffc 1103.7.6.1Details
install fire alarm for new adus. add low frequency sounders to existing units-to comply with sffc 1103.7.6.1 | $46,460 |
| Apr 30, 2018 | Never finaled issued Apr 2018, no final | 1391 08th Av | street space permitDetails
street space permit | ||
| Mar 13, 2018 | Completed final sign-off May 2019 | 1391 08th Av | S L M Development Inc. | detail change to aprroved app# 201710121144, rev to (e) colum locationDetails
detail change to aprroved app# 201710121144, rev to (e) colum location | |
| Feb 1, 2018 | Completed final sign-off May 2019 | 1391 08th Av | U S Prime Contractor Inc | detail change to pa 2016-0329-3276 (soft story)Details
detail change to pa 2016-0329-3276 (soft story) | $2,000 |
| Oct 18, 2017 | Completed final sign-off Nov 2017 | 1391 08th Av | Super Roofing Company | reroofing.Details
reroofing. | $25,500 |
| Oct 12, 2017 | Completed final sign-off May 2019 | 1391 08th Av | U S Prime Contractor Inc | soft story retrofit: detail change to approved app#201603293276Details
soft story retrofit: detail change to approved app#201603293276 | |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 1391 08th Av | street space permitDetails
street space permit | ||
| Aug 4, 2017 | Completed final sign-off Dec 2017 | 1391 08th Av | Architectural Fenestration & Restoration | to comply with complaint #201777401-3, 201778232-2, repair and replace (e) siding on south wall in-kind 8"lap where damaged due to water intrusion.Details
to comply with complaint #201777401-3, 201778232-2, repair and replace (e) siding on south wall in-kind 8"lap where damaged due to water intrusion. | $12,000 |
| Jul 10, 2017 | Completed final sign-off May 2019 | 1391 08th Av | Bay Cities Fire Protection | installation of new wet pipe spinkler system per nfpa 13. with 2" undergroundDetails
installation of new wet pipe spinkler system per nfpa 13. with 2" underground | $8,500 |
| May 24, 2016 | Completed final sign-off Oct 2016 | 1391 08th Av | Bay Cities Fire Protection | install 7 residential sprinklers in legalized unit clouded ref 201509177276Details
install 7 residential sprinklers in legalized unit clouded ref 201509177276 | $5,500 |
| May 23, 2016 | Completed final sign-off May 2019 | 1391 08th Av | add (5) dwelling units (adu's) per ord 30-15 with soft story appl #201603293276 including bathroom & kitchen.Details
add (5) dwelling units (adu's) per ord 30-15 with soft story appl #201603293276 including bathroom & kitchen. | $150,000 | |
| Mar 29, 2016 | Completed final sign-off Jul 2018 | 1391 08th Av | U S Prime Contractor Inc | soft story retrofit per sfbc 2013, ordinance 66-13; sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc 2013, ordinance 66-13; sfbc chapter 34b, 2012 iebc appendix a-4 | $80,000 |
| Feb 5, 2016 | Completed final sign-off Apr 2016 | 1391 08th Av | Y&W Construction Co. | unit 16,remodel kitchen replace cabinets, counter tops, stove,hood, sink faucet, refrigirator, remodel bathroom replace tile in tub, faucet, sink & toilet, no structural workDetails
unit 16,remodel kitchen replace cabinets, counter tops, stove,hood, sink faucet, refrigirator, remodel bathroom replace tile in tub, faucet, sink & toilet, no structural work | $20,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 1391 08th Av | Y&W Construction Co. | unit #8: remodel kitchen and bathroom. replace cabinets, install dishwasher, stove hood, sink faucet, replace tub, faucet, vanity and toilet.Details
unit #8: remodel kitchen and bathroom. replace cabinets, install dishwasher, stove hood, sink faucet, replace tub, faucet, vanity and toilet. | $25,000 |
| Sep 17, 2015 | Completed final sign-off Dec 2016 | 1391 08th Av | to legalize an existing 1 bedroom at ground floor dwelling unit at subject property. (per ordinanc# 43-14)Details
to legalize an existing 1 bedroom at ground floor dwelling unit at subject property. (per ordinanc# 43-14) | $13,000 | |
| Jan 20, 2015 | Never finaled issued Jan 2015, no final | 1391 08th Av | street spaceDetails
street space | ||
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 1391 08th Av | New Era Construction Co. ***Check Id**** | #15- replacement cabinet & counter top at kitchen only.Details
#15- replacement cabinet & counter top at kitchen only. | $3,000 |
| May 28, 2013 | Expired or cancelled expired Dec 2014 | 1391 08th Av | New Era Construction Co. ***Check Id**** | remodel kitchen and bath.Details
remodel kitchen and bath. | $6,000 |
| Mar 28, 2013 | Expired or cancelled cancelled Jun 2019 | 1391 08th Av | correct record showing legal occupancy of 18 units on 4 floors of occupancy. no new work. record correction only.Details
correct record showing legal occupancy of 18 units on 4 floors of occupancy. no new work. record correction only. | ||
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 1391 08th Av | New Era Construction Co. ***Check Id**** | replace cabinet and sink.Details
replace cabinet and sink. | $3,500 |
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 1391 08th Av | Surtec Construction Co Inc | to comply with complaint # 201149008 dated 7/6/2011. kitchen cabinet and countertop replacement due to wear and tear.Details
to comply with complaint # 201149008 dated 7/6/2011. kitchen cabinet and countertop replacement due to wear and tear. | $2,500 |
| Sep 7, 2010 | Never finaled issued Sep 2010, no final | 1391 08th Av | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 29, 2010 | Expired or cancelled withdrawn May 2019 | 1391 08th Av | install 16 gauge steel vent in existing opening 24x24 located in boiler room adjacent to hallway at ground floorDetails
install 16 gauge steel vent in existing opening 24x24 located in boiler room adjacent to hallway at ground floor | $450 | |
| Aug 5, 2009 | Completed final sign-off Oct 2009 | 1391 08th Av | replace dry rot siding with like kind. 1 x 10 wood lap siding replace in kind. to replace wood window trim in kindDetails
replace dry rot siding with like kind. 1 x 10 wood lap siding replace in kind. to replace wood window trim in kind | $12,000 | |
| Aug 4, 2006 | Completed final sign-off Oct 2006 | 1391 08th Av | Qse Construction | existing salt damaged concrete foundation to be repaired as shown on drawings. remove damaged concrete and replace with new reinforced concrete.Details
existing salt damaged concrete foundation to be repaired as shown on drawings. remove damaged concrete and replace with new reinforced concrete. | $18,950 |
| Mar 12, 2003 | Expired or cancelled expired Sep 2011 | 1391 08th Av | Home Tech Construction | windows will be replaced to single hungs and picture in middle of the windowDetails
windows will be replaced to single hungs and picture in middle of the window | $27,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- New Era Construction Co. ***Check Id**** (3), U S Prime Contractor Inc (3), A M West Mechanical Inc. (2), Bay Cities Fire Protection (2), S L M Development Inc. (2), Y&W Construction Co. (2), Architectural Fenestration & Restoration, Bay Alarm Company, Home Tech Construction, Qse Construction, Super Roofing Company, Surtec Construction Co Inc
- Architects
- Daniel Paris (2)
- Engineers
- Behruz Vahdani-Sanavi, Ph.D.,P.E (2), Thomas Lutge
- Authorized agent-otherss
- Dan Paris