Block 2349, lot 018
1030 Taraval St
- City’s use
- Commercial Retail
- Built
- 1926
- Stories
- 1
- Units
- 1
- Rooms
- 5 bathrooms
- Lot
- 7,500 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2022 | Completed final sign-off Apr 2024 | 1030 Taraval St | alter-site to approved & issued site pa #201404072579-s. in compliance of nov #201446991 to remove unpermitted rear structures/covering per plan; in compliance of notive of code enforcement #2020-007003 enf to remove unpermitted structures/covering per plan.Details
alter-site to approved & issued site pa #201404072579-s. in compliance of nov #201446991 to remove unpermitted rear structures/covering per plan; in compliance of notive of code enforcement #2020-007003 enf to remove unpermitted structures/covering per plan. | $2,000 | |
| May 22, 2019 | Completed final sign-off May 2019 | 1038 Taraval St | renew for final 201309116487. all work is completeDetails
renew for final 201309116487. all work is complete | ||
| Mar 7, 2017 | Completed final sign-off Jul 2019 | 1038 Taraval St | erect one electric single faced wall sign.Details
erect one electric single faced wall sign. | ||
| Mar 7, 2017 | Completed final sign-off Nov 2019 | 1038 Taraval St | erect one electric double faced projecting sign.Details
erect one electric double faced projecting sign. | ||
| Jan 5, 2016 | Completed final sign-off May 2019 | 1038 Taraval St | change of use from a traffic school to tobacco paraphenalia. enforcement case #13139_enfDetails
change of use from a traffic school to tobacco paraphenalia. enforcement case #13139_enf | ||
| Apr 7, 2014 | Never finaled issued Oct 2021, no final | 1030 Taraval St | in compliance of complaint #201446991 -remove all unpermitted work at rear, and legalize storage shed in rear yard.Details
in compliance of complaint #201446991 -remove all unpermitted work at rear, and legalize storage shed in rear yard. | $25,000 | |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 1038 Taraval St | to comply with the scope of work bid nov#201319201 dated 9/3/2013. repairing of the rear and side wall panels. also new roofing material has been installed. all work is not visible from street.Details
to comply with the scope of work bid nov#201319201 dated 9/3/2013. repairing of the rear and side wall panels. also new roofing material has been installed. all work is not visible from street. | $5,500 | |
| Aug 22, 2013 | Completed final sign-off Aug 2013 | 1030 Taraval St | Star Plumbing & Fire Const Co. | install new fire suppression system for kitchen hood and duct per ul 300 system. ref app#201302019311Details
install new fire suppression system for kitchen hood and duct per ul 300 system. ref app#201302019311 | $6,000 |
| Jun 19, 2013 | Completed final sign-off Aug 2013 | 1030 Taraval St | install new kitchen hood & exhaust system. bldg ref pa# 201302019311Details
install new kitchen hood & exhaust system. bldg ref pa# 201302019311 | $20,000 | |
| Feb 1, 2013 | Completed final sign-off Sep 2013 | 1030 Taraval St | change (e) office (b-10) to limited restaurant (b-05). modify (e) storefront. install new kitchen equipment & provide 2 new ada restrooms.Details
change (e) office (b-10) to limited restaurant (b-05). modify (e) storefront. install new kitchen equipment & provide 2 new ada restrooms. | $100,000 | |
| Jan 3, 2013 | Completed final sign-off Sep 2013 | 1030 Taraval St | Tong Cheong Construction Co | replace (e) support beam & posts & remove (e) non-bearing walls at ground fl per plan.Details
replace (e) support beam & posts & remove (e) non-bearing walls at ground fl per plan. | $4,000 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 1042 Taraval St | Universal Fire Equipment Co | install fire suppression to protect hood, duct, plenum, and cooking equipments under hood.Details
install fire suppression to protect hood, duct, plenum, and cooking equipments under hood. | $3,500 |
| Dec 10, 2010 | Never finaled issued Dec 2010, no final | 1042 Taraval St | New Era Construction Co. ***Check Id**** | erect a sign holder at storefront (posts)Details
erect a sign holder at storefront (posts) | $3,000 |
| Dec 10, 2010 | Never finaled issued Dec 2010, no final | 1042 Taraval St | New Era Construction Co. ***Check Id**** | to erect electrical non structural signDetails
to erect electrical non structural sign | $3,000 |
| Mar 23, 2010 | Never finaled issued Mar 2010, no final | 1028 Taraval St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Jul 17, 2009 | Never finaled issued Jul 2009, no final | 1026 Taraval St | verify/add address to block 2349 lot 018 (#1026, #1028,#1030 and #1038 and #1042 taraval - together 5 commercialsDetails
verify/add address to block 2349 lot 018 (#1026, #1028,#1030 and #1038 and #1042 taraval - together 5 commercials | ||
| Jul 16, 2009 | Expired or cancelled expired Apr 2013 | 1026 Taraval St | divide existing vacant financial office into one office and one vacant commercial space by closing openings in existing bearing wall and convert one storefront window as new front door; remodel existing toilet int h.c. accessible toilets.Details
divide existing vacant financial office into one office and one vacant commercial space by closing openings in existing bearing wall and convert one storefront window as new front door; remodel existing toilet int h.c. accessible toilets. | $30,000 | |
| Jun 2, 2009 | Completed final sign-off Jul 2009 | 1038 Taraval St | convert (e) vided store into a traffic school, remodel (e) toilet to h.c. access toilet & replace furnace.Details
convert (e) vided store into a traffic school, remodel (e) toilet to h.c. access toilet & replace furnace. | $15,000 | |
| Jan 22, 2009 | Completed final sign-off Feb 2011 | 1042 Taraval St | New Era Construction Co. ***Check Id**** | proposed restaurant to existing ground floor. note: this was originally a change of use from "m" occup to "a2" occup. now it is a change of use from a "m" occup changed to "b" occup. (38 total occupant load). fire dept review will still be charged but no fire dept insp is required.Details
proposed restaurant to existing ground floor. note: this was originally a change of use from "m" occup to "a2" occup. now it is a change of use from a "m" occup changed to "b" occup. (38 total occupant load). fire dept review will still be charged but no fire dept insp is required. | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- New Era Construction Co. ***Check Id**** (3), Star Plumbing & Fire Const Co., Tong Cheong Construction Co, Universal Fire Equipment Co
- Architects
- A. Gordon Atkinson (2), Charles Li
- Engineers
- Joyce Cheng, Tony K Fong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.