Block 2697, lot 013
290 Collingwood St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,046 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2017 | Never finaled issued Apr 2017, no final | 290 Collingwood St | Fma Builders | landscape renovation for rear extentsion new wood deck, new wood fence, new guardrail. irrigation and low voltage landscape lighting update.Details
landscape renovation for rear extentsion new wood deck, new wood fence, new guardrail. irrigation and low voltage landscape lighting update. | $20,000 |
| Dec 22, 2016 | Completed final sign-off Mar 2018 | 290 Collingwood St | Fma Builders | kitchen renovation of cabinets, fixtures, finishes, no change to configuration. no structural or exterior work.Details
kitchen renovation of cabinets, fixtures, finishes, no change to configuration. no structural or exterior work. | $50,000 |
| Sep 26, 2013 | Completed final sign-off Feb 2014 | 290 Collingwood St | Pro Plumbing | install new fire sprinkler system through out residence per nfpa 13d and new combination fire service. t.i. app#201208107144Details
install new fire sprinkler system through out residence per nfpa 13d and new combination fire service. t.i. app#201208107144 | $20,000 |
| Jul 1, 2013 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | revision to app#201306250428. structural work only. revise construction detail. as built per plan.Details
revision to app#201306250428. structural work only. revise construction detail. as built per plan. | |
| Jul 1, 2013 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | revision to app#201306250425. structural work only. revise lagging detail. as built per plan.Details
revision to app#201306250425. structural work only. revise lagging detail. as built per plan. | |
| Jun 25, 2013 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | revision to bpa#201303202646, structural only. add more soldier beam under existing structure for temporary shoring.Details
revision to bpa#201303202646, structural only. add more soldier beam under existing structure for temporary shoring. | |
| Jun 25, 2013 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | revision to pa#2012-0810-7144. structural work only.redesign col. support for reinforcement.Details
revision to pa#2012-0810-7144. structural work only.redesign col. support for reinforcement. | |
| May 31, 2013 | Never finaled issued May 2013, no final | 290 Collingwood St | street spaceDetails
street space | ||
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 290 Collingwood St | Aero Construction Inc | temporary shoring for new basement.Details
temporary shoring for new basement. | $30,000 |
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 290 Collingwood St | Shun Construction Inc. | remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural workDetails
remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural work | $2,000 |
| Aug 10, 2012 | Completed final sign-off Mar 2014 | 290 Collingwood St | Aero Construction Inc | vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement.Details
vertical addition of existing building. 3 bedrooms, 2 bathrooms on 2nd floor. remodel on 1st floor & garage level / basement. | $180,000 |
| Aug 3, 2007 | Completed final sign-off Aug 2007 | 290 Collingwood St | Jongejan/Schaadt Construction | replace stairs in kind. no chnage w/existing material.Details
replace stairs in kind. no chnage w/existing material. | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aero Construction Inc (6), Fma Builders (2), Jongejan/Schaadt Construction, Pro Plumbing, Shun Construction Inc.
- Architects
- Alex Lau
- Authorized agent-otherss
- Southwest Sign Co.