Block 0117, lot 005
525 Columbus Ave
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 32
- Rooms
- 30 bathrooms
- Building
- 24,678 sq ft
- Lot
- 10,940 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
76 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2023 | Completed final sign-off Jun 2024 | 515 Columbus Av | All Bay Cities Construction | renewal pa# 2017-0510-6224 to complete work.Details
renewal pa# 2017-0510-6224 to complete work. | |
| Aug 18, 2023 | Completed final sign-off Apr 2024 | 515 Columbus Av | All Bay Cities Construction | to obtain final inspection for work approved under pa# 2017-0906-7044. all work is complete.Details
to obtain final inspection for work approved under pa# 2017-0906-7044. all work is complete. | |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 519 Columbus Av | All Bay Cities Construction | recommencment and completion of work approved under pa# 201712186734Details
recommencment and completion of work approved under pa# 201712186734 | $40,000 |
| Oct 11, 2022 | Never finaled issued Oct 2022, no final | 620 Green St | Parksway Construction Inc | re-roofing | $52,000 |
| Jun 23, 2022 | Completed final sign-off May 2023 | 537 Columbus Av | All Bay Cities Construction | barrier removal (interior): voluntary relocate restroom to comply with ada requirement. vacant unit.Details
barrier removal (interior): voluntary relocate restroom to comply with ada requirement. vacant unit. | $4,000 |
| Dec 23, 2021 | Completed final sign-off Mar 2022 | 521 Columbus Av | install non electric wall sign 1'0" x 12'2" (rasoio barbershop)Details
install non electric wall sign 1'0" x 12'2" (rasoio barbershop) | $800 | |
| Dec 23, 2021 | Completed final sign-off Mar 2022 | 521 Columbus Av | install non electric projecting double faced sign 1'8" x 1'8" x 8' 0" (rasoio)Details
install non electric projecting double faced sign 1'8" x 1'8" x 8' 0" (rasoio) | $1,200 | |
| Dec 10, 2021 | Completed final sign-off Mar 2022 | 521 Columbus Av | administrative permit only.change of use to a barber shop, per dcp. no actual work under this permit.Details
administrative permit only.change of use to a barber shop, per dcp. no actual work under this permit. | ||
| Sep 2, 2021 | Completed final sign-off Nov 2021 | 527 Columbus Av | All Bay Cities Construction | recommencement & completion of work approved under bpa#201712186736Details
recommencement & completion of work approved under bpa#201712186736 | |
| Aug 6, 2021 | Completed final sign-off Aug 2021 | 521 Columbus Av | All Bay Cities Construction | commencement of work not started under previously approved permit application #201704275073.Details
commencement of work not started under previously approved permit application #201704275073. | |
| Dec 22, 2020 | Expired or cancelled cancelled Nov 2024 | 507 Columbus Av | change of use from limited use restaurant to restaurant, no workDetails
change of use from limited use restaurant to restaurant, no work | ||
| Sep 5, 2019 | Completed final sign-off Aug 2021 | 515 Columbus Av | All Bay Cities Construction | comply with planning case 2019005438enf. restoration of historic storefront at 515-527 columbus including installation of a storefront system, wood framed doors and transoms, tiled bulkheads, tiled entryway, floorinh and installtion of ada push buttons.Details
comply with planning case 2019005438enf. restoration of historic storefront at 515-527 columbus including installation of a storefront system, wood framed doors and transoms, tiled bulkheads, tiled entryway, floorinh and installtion of ada push buttons. | $30,000 |
| May 1, 2019 | Never finaled issued May 2019, no final | 515 Columbus Av | street space | ||
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 515 Columbus Av | street space w/mta | ||
| May 9, 2018 | Never finaled issued May 2018, no final | 515 Columbus Av | street space permit - renewal of permit # 201709067044; mta permitDetails
street space permit - renewal of permit # 201709067044; mta permit | ||
| Mar 8, 2018 | Never finaled issued May 2018, no final | 501 Columbus Av | All Bay Cities Construction | ada restroom per seismic retrofit for soft story retrofit per 2016 cebc appendix a-4 related to app#201802222022 (commercial) sof story program; n/a maherDetails
ada restroom per seismic retrofit for soft story retrofit per 2016 cebc appendix a-4 related to app#201802222022 (commercial) sof story program; n/a maher | $118,000 |
| Feb 22, 2018 | Never finaled issued May 2018, no final | 501 Columbus Av | All Bay Cities Construction | seismic retrofit per mandatory soft story per sfebc chapter 4d 2016 cebc app a-4. (residential) maher n/aDetails
seismic retrofit per mandatory soft story per sfebc chapter 4d 2016 cebc app a-4. (residential) maher n/a | $200,000 |
| Dec 18, 2017 | Expired or cancelled expired Jul 2023 | 519 Columbus Av | All Bay Cities Construction | commercial t.i. for ada accessible entrance. n/a for maherDetails
commercial t.i. for ada accessible entrance. n/a for maher | $90,000 |
| Dec 18, 2017 | Completed final sign-off Nov 2021 | 527 Columbus Av | All Bay Cities Construction | 1) commercial t.i. to comply with complaint #201630151 ada accessible entrance. ada restroom. n/a for maherDetails
1) commercial t.i. to comply with complaint #201630151 ada accessible entrance. ada restroom. n/a for maher | $90,000 |
| Sep 6, 2017 | Expired or cancelled expired Apr 2024 | 515 Columbus Av | All Bay Cities Construction | install slab and replace foundation per plan and repair dry rot where occurs. to comply with complaint #201790541Details
install slab and replace foundation per plan and repair dry rot where occurs. to comply with complaint #201790541 | $20,000 |
| May 10, 2017 | Never finaled issued May 2017, no final | 515 Columbus Av | All Bay Cities Construction | barrier removal, upgrade e toilet, entry doors only, auto door opener bar is installed against the exterior wallDetails
barrier removal, upgrade e toilet, entry doors only, auto door opener bar is installed against the exterior wall | $15,000 |
| Apr 27, 2017 | Completed final sign-off Aug 2021 | 521 Columbus Av | All Bay Cities Construction | tenant improvement: construct new ada restroom at ground floor. reconfigure extg storefront at ground floor. n/a for maherDetails
tenant improvement: construct new ada restroom at ground floor. reconfigure extg storefront at ground floor. n/a for maher | $20,000 |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 527 Columbus Av | E F Mcginness And Sons | to comply with n.o.v. 201630151 to legalize complaint, section off front area of store for sales. elect 2x4 new drywall in sales area section off section onlyDetails
to comply with n.o.v. 201630151 to legalize complaint, section off front area of store for sales. elect 2x4 new drywall in sales area section off section only | $5,000 |
| May 12, 2016 | Never finaled issued May 2016, no final | 622 Green St | Firemaster | install r-102 ansul suppression system. revision to app#201602048848, ti ref app#201510068968. n/a for maherDetails
install r-102 ansul suppression system. revision to app#201602048848, ti ref app#201510068968. n/a for maher | $5,000 |
| Apr 12, 2016 | Never finaled issued Apr 2016, no final | 501 Columbus Av | Arch Construction, Inc. | remove (e) wooden guard to dumps patching lightwell frame with bitumen membrane. install metal guard & install metal gravel stop. repair onlyDetails
remove (e) wooden guard to dumps patching lightwell frame with bitumen membrane. install metal guard & install metal gravel stop. repair only | $5,000 |
| Mar 29, 2016 | Completed final sign-off Mar 2016 | 622 Green St | Lt Construction Inc | comply with nov #2015-57381. infill existing opening hole on the wall between (2) units 622 green street and 515 columbus ave.Details
comply with nov #2015-57381. infill existing opening hole on the wall between (2) units 622 green street and 515 columbus ave. | $2,200 |
| Mar 8, 2016 | Never finaled issued Apr 2016, no final | 622 Green St | Bayside Mechanical Inc | provide & install make up air unit (inline), new duct work, provide & install new louver, grease duct & connect to existing. ref #201510068968. n/a maher ordinanceDetails
provide & install make up air unit (inline), new duct work, provide & install new louver, grease duct & connect to existing. ref #201510068968. n/a maher ordinance | $19,000 |
| Feb 4, 2016 | Never finaled issued Feb 2016, no final | 622 Green St | Firemaster | ansul install. ref. #2015-1006-8968. to comply with nov #201545811. maher naDetails
ansul install. ref. #2015-1006-8968. to comply with nov #201545811. maher na | $5,000 |
| Dec 24, 2015 | Expired or cancelled cancelled Jan 2026 | 622 Green St | replace exterior doors and windows. | $15,000 | |
| Dec 1, 2015 | Never finaled issued Feb 2016, no final | 501 Columbus Av | street space | ||
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 507 Columbus Av | sidewalk repair only. | ||
| Oct 6, 2015 | Never finaled issued Oct 2015, no final | 622 Green St | Seabee Construction | comply with nov #201545811. remodel extg bar and replace kitchen hood. mep under seperate permit. n/a for maherDetails
comply with nov #201545811. remodel extg bar and replace kitchen hood. mep under seperate permit. n/a for maher | $25,000 |
| Oct 6, 2015 | Expired or cancelled cancelled Jan 2026 | 515 Columbus Av | revision to 201503060207. remove old wood floor, joist. new concrete floor and new countertop per plan.Details
revision to 201503060207. remove old wood floor, joist. new concrete floor and new countertop per plan. | $20,000 | |
| Sep 21, 2015 | Expired or cancelled cancelled Jan 2026 | 622 Green St | replacement of (e) awning sign. maher na | $500 | |
| Sep 21, 2015 | Expired or cancelled cancelled Jan 2026 | 622 Green St | awning replacement. maher na | $3,500 | |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 507 Columbus Av | street space | ||
| Apr 14, 2015 | Never finaled issued Apr 2015, no final | 515 Columbus Av | street space & sidewalk repair w/metersDetails
street space & sidewalk repair w/meters | ||
| Apr 14, 2015 | Never finaled filed Apr 2015, never issued | 515 Columbus Av | street space & sidewalk repair w/meters | ||
| Mar 6, 2015 | Never finaled issued Mar 2015, no final | 515 Columbus Av | Seabee Construction | remodel two bathroom to accommodate a ada bathroom.Details
remodel two bathroom to accommodate a ada bathroom. | $10,000 |
| Feb 27, 2015 | Completed final sign-off Jan 2016 | 622 Green St | Seabee Construction | remodeling two bathrooms - one ada maher - not req'dDetails
remodeling two bathrooms - one ada maher - not req'd | $10,000 |
| Nov 10, 2014 | Completed final sign-off Sep 2016 | 501 Columbus Av | to obtain fina;l inspection for work approved under pa #200705100945. all work is complete.Details
to obtain fina;l inspection for work approved under pa #200705100945. all work is complete. | ||
| Jan 14, 2014 | Expired or cancelled cancelled Jan 2026 | 543 Columbus Av | interior remodel to include: replace some cabinets, install some new equipment. all work takes place on ground floor extg bakery.Details
interior remodel to include: replace some cabinets, install some new equipment. all work takes place on ground floor extg bakery. | $30,000 | |
| Sep 4, 2013 | Completed final sign-off Dec 2013 | 620 Green St | T J Constr Inc***Ck Id,Tie Liu Only***** | renew application #2012.0417.8519Details
renew application #2012.0417.8519 | |
| Dec 21, 2012 | Never finaled issued Dec 2012, no final | 501 Columbus Av | street space & sidewalk repair | ||
| Apr 17, 2012 | Expired or cancelled expired Dec 2013 | 620 Green St | Sik Hoi Wong Construction, T J Constr Inc***Ck Id,Tie Liu Only***** | replace brick foundation with concrete foundation per plan (structural work only), work in common area only.Details
replace brick foundation with concrete foundation per plan (structural work only), work in common area only. | $15,000 |
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 501 Columbus Av | to obtain final inspection for work approved under pa 200705100945. all work is complete.Details
to obtain final inspection for work approved under pa 200705100945. all work is complete. | ||
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 501 Columbus Av | to obtain final inspection for work approved under pa 200905158549. all work is complete.Details
to obtain final inspection for work approved under pa 200905158549. all work is complete. | ||
| Jul 9, 2010 | Completed final sign-off Jul 2010 | 620 Green St | Level 8 Construction Inc | dry rot repair on 2nd floor and 3rd floor @ side light well areas, less than 50%, about 100 sq. ft., not visible from street. no structural work.Details
dry rot repair on 2nd floor and 3rd floor @ side light well areas, less than 50%, about 100 sq. ft., not visible from street. no structural work. | $9,000 |
| Jun 14, 2010 | Completed final sign-off Jul 2010 | 527 Columbus Av | T J Constr Inc***Ck Id,Tie Liu Only***** | installation of electrical lighting for (e) retail space. electrical work only exempt ada requirement per section 1134b of cbc.Details
installation of electrical lighting for (e) retail space. electrical work only exempt ada requirement per section 1134b of cbc. | $2,000 |
| Dec 2, 2009 | Expired or cancelled expired May 2011 | 501 Columbus Av | T J Constr Inc***Ck Id,Tie Liu Only***** | dry-rot repair of rear stair @ prop. line. repair in-kind/less than 50%. replace (4) stringers (2x12), replace risers & threads @ on section of stairs & replace guardrail & pickets as needed.Details
dry-rot repair of rear stair @ prop. line. repair in-kind/less than 50%. replace (4) stringers (2x12), replace risers & threads @ on section of stairs & replace guardrail & pickets as needed. | $7,500 |
| Oct 9, 2009 | Never finaled issued Oct 2009, no final | 501 Columbus Av | street space & sidewalk & mta. | ||
| May 15, 2009 | Expired or cancelled expired May 2011 | 501 Columbus Av | Level 8 Construction Inc | revision to pa #200705100945, keep original entrance door, delete & no work done on the new front entrance door.Details
revision to pa #200705100945, keep original entrance door, delete & no work done on the new front entrance door. | |
| Feb 20, 2009 | Completed final sign-off Jun 2009 | 515 Columbus Av | J K M Fire Protection | remove existing non ul300 wetchemical fire system. add (n) ul 300 wet chemical fire system.Details
remove existing non ul300 wetchemical fire system. add (n) ul 300 wet chemical fire system. | $3,000 |
| Feb 20, 2009 | Expired or cancelled expired May 2011 | 501 Columbus Av | to obtain final inspection for work approved under pa #200705100945.Details
to obtain final inspection for work approved under pa #200705100945. | $10,000 | |
| Sep 23, 2008 | Never finaled issued Sep 2008, no final | 501 Columbus Av | street space permit only. | ||
| Jul 28, 2008 | Completed final sign-off Sep 2008 | 535 Columbus Av | change of use from partial restaurant to retail sales - work including new handicap restroom, install new counters and display case.Details
change of use from partial restaurant to retail sales - work including new handicap restroom, install new counters and display case. | $12,000 | |
| Apr 15, 2008 | Completed final sign-off Sep 2008 | 507 Columbus Av | tenant improvements - remodel of existign retail gift shop to new grocery shop - da/ handicap ramp, new coutner, new shelf units, new refrigerators.Details
tenant improvements - remodel of existign retail gift shop to new grocery shop - da/ handicap ramp, new coutner, new shelf units, new refrigerators. | $10,000 | |
| Nov 5, 2007 | Expired or cancelled expired Mar 2010 | 527 Columbus Av | change of ownership of (e) full service restaurant & interior remodel & (n) power entry door button for handicap access. (e) handicap toilet under permit appl.# 2006/0621/4683Details
change of ownership of (e) full service restaurant & interior remodel & (n) power entry door button for handicap access. (e) handicap toilet under permit appl.# 2006/0621/4683 | $67,775 | |
| May 10, 2007 | Expired or cancelled expired Mar 2010 | 501 Columbus Av | replacing equipment in commercial portion of building, facade alteration, relocation of entrance for better handicap access, adding an awning.Details
replacing equipment in commercial portion of building, facade alteration, relocation of entrance for better handicap access, adding an awning. | $50,000 | |
| May 1, 2007 | Completed final sign-off May 2007 | 527 Columbus Av | C & K Housing Const Co *Ck Id* | replace (e) brick footing with new concrete 3' high wall & 5"-0" fence.Details
replace (e) brick footing with new concrete 3' high wall & 5"-0" fence. | $5,000 |
| Sep 22, 2006 | Expired or cancelled expired Mar 2010 | 527 Columbus Av | comply complaint 200563436 bid-insp, & 200451250 ced. revise 200606214683. remove (e) wood post & replace w/ steel post & beam. replace (e) foundation grade beam.Details
comply complaint 200563436 bid-insp, & 200451250 ced. revise 200606214683. remove (e) wood post & replace w/ steel post & beam. replace (e) foundation grade beam. | $20,000 | |
| Jun 21, 2006 | Never finaled issued Jun 2006, no final | 527 Columbus Av | street space permit | ||
| Jun 21, 2006 | Expired or cancelled expired Mar 2010 | 501 Columbus Av | C & K Housing Const Co *Ck Id* | (work to be done at unit 527 columbus ave only) add a handicap toilet at extg commercial space as per plan to comply with his nov# 200454166, 199707630 and 200340622Details
(work to be done at unit 527 columbus ave only) add a handicap toilet at extg commercial space as per plan to comply with his nov# 200454166, 199707630 and 200340622 | $20,000 |
| Mar 3, 2006 | Never finaled issued Mar 2006, no final | 535 Columbus Av | street space | ||
| Feb 27, 2006 | Completed final sign-off Jun 2006 | 543 Columbus Av | painted or other non-structural sign: wall, new signDetails
painted or other non-structural sign: wall, new sign | ||
| Feb 27, 2006 | Completed final sign-off Jun 2006 | 543 Columbus Av | install lnew awing and sign, retractable awing new finisyes on facade, atached wood cladding onto existing tile facade. ref 200511299129Details
install lnew awing and sign, retractable awing new finisyes on facade, atached wood cladding onto existing tile facade. ref 200511299129 | $6,000 | |
| Feb 9, 2006 | Never finaled issued Feb 2006, no final | 543 Columbus Av | street space | ||
| Dec 19, 2005 | Completed final sign-off Jan 2006 | 535 Columbus Av | Lowe Sheet Metal Inc | replace outside garbage chute 24 guage galvanize sheeet metal. sprinkler revision on separate permit.Details
replace outside garbage chute 24 guage galvanize sheeet metal. sprinkler revision on separate permit. | $11,000 |
| Nov 29, 2005 | Completed final sign-off Jun 2006 | 543 Columbus Av | remove sign from awning. current sign non conforming. new floor finishes wall finishes casework & door hardware.Details
remove sign from awning. current sign non conforming. new floor finishes wall finishes casework & door hardware. | $15,000 | |
| Nov 4, 2004 | Expired or cancelled expired Feb 2007 | 535 Columbus Av | to comply w/nov dated 10-13-04- 200454166- install handrail on back stairs (2), one fire proof doorDetails
to comply w/nov dated 10-13-04- 200454166- install handrail on back stairs (2), one fire proof door | $2,900 | |
| Aug 19, 2004 | Never finaled issued Aug 2004, no final | 501 Columbus Av | street space | ||
| Mar 25, 2004 | Completed final sign-off May 2004 | 543 Columbus Av | Nakai Construction | remodel existing coffee shop- no change in useDetails
remodel existing coffee shop- no change in use | $60,000 |
| Jun 12, 2003 | Completed final sign-off Jul 2003 | 511 Columbus Av | #change (e) deck tile 20x15Details
#change (e) deck tile 20x15 | $2,000 | |
| Jun 12, 2003 | Completed final sign-off Aug 2003 | 511 Columbus Av | #3- replace kitchen cabinets, bathroom tile & paint to comply with nov#200340695Details
#3- replace kitchen cabinets, bathroom tile & paint to comply with nov#200340695 | $4,000 | |
| Nov 26, 2002 | Completed final sign-off Jul 2003 | 511 Columbus Av | repair existing stair & deck @ 3rd flr. remove plastic cover on existing lightwell. comply w/2002320Details
repair existing stair & deck @ 3rd flr. remove plastic cover on existing lightwell. comply w/2002320 | $20,000 | |
| Sep 22, 2000 | Expired or cancelled expired Oct 2001 | 521 Columbus Av | to erect non electric single faced signDetails
to erect non electric single faced sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- All Bay Cities Construction (14), T J Constr Inc***Ck Id,Tie Liu Only***** (4), Seabee Construction (3), C & K Housing Const Co *Ck Id* (2), Firemaster (2), Level 8 Construction Inc (2), Arch Construction, Inc., Bayside Mechanical Inc, E F Mcginness And Sons, J K M Fire Protection, Lowe Sheet Metal Inc, Lt Construction Inc, Nakai Construction, Parksway Construction Inc, Sik Hoi Wong Construction
- Architects
- David Cumby (2), David Huynh
- Engineers
- Jeff Chow (3), Alex Lau, Mazen Tawasha
- Authorized agents
- Jeremy Zhang
Find contractors for work like this