Nakai Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Jul 2012
- Last 24 months
- 0 permits filed
19 permits since 2000: 19 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2012 | Completed final sign-off Aug 2012 | 2223 18th Av | replace (5) windows at front of house. aluminum clad wood max u-factor .40Details
replace (5) windows at front of house. aluminum clad wood max u-factor .40 | $1,700 |
| Mar 20, 2012 | Completed final sign-off May 2012 | 154 Beaumont Av | repalce cabinet and counter top, replace dish washer and stove, remove existing dry wall and install new sheetrock throughout. no change location kitchen sink, appliances (dishwasher, stove) also cabinets.Details
repalce cabinet and counter top, replace dish washer and stove, remove existing dry wall and install new sheetrock throughout. no change location kitchen sink, appliances (dishwasher, stove) also cabinets. | $16,000 |
| Sep 12, 2011 | Completed final sign-off Oct 2011 | 638 24th Av | repair of balcony floor as rain water leakage at 3rd flr, remove all existing tile (120 sq.ft. area) fix waterproof coating, install new flashing, install new tile, fix bedrm ceiling damaged area only, repair sheetrock (2nd flr)Details
repair of balcony floor as rain water leakage at 3rd flr, remove all existing tile (120 sq.ft. area) fix waterproof coating, install new flashing, install new tile, fix bedrm ceiling damaged area only, repair sheetrock (2nd flr) | $6,000 |
| Jan 21, 2011 | Completed final sign-off Mar 2011 | 769 Joost Av | submital of revised drawing for change in deck size only to original approved drawings. current app#200809030664.Details
submital of revised drawing for change in deck size only to original approved drawings. current app#200809030664. | |
| Mar 8, 2010 | Completed final sign-off Mar 2010 | 154 Paloma Av | dry rot repair at front of house in-kind, approximate 50 sq.ft. areaDetails
dry rot repair at front of house in-kind, approximate 50 sq.ft. area | $1,800 |
| Sep 3, 2009 | Completed final sign-off Jan 2010 | 39 Manor Dr | repair damaged front stairs and add 1 step to front to comply with code requirements. no change to lay outDetails
repair damaged front stairs and add 1 step to front to comply with code requirements. no change to lay out | $6,000 |
| May 20, 2009 | Completed final sign-off Sep 2009 | 2482 42nd Av | replace existing windows, provide new landing and stairs at rear of bldg, provide 1 hr wall.Details
replace existing windows, provide new landing and stairs at rear of bldg, provide 1 hr wall. | $8,200 |
| Dec 24, 2007 | Completed final sign-off Jun 2008 | 2911 25th Av | revision to pa# 2007/12/07/9951. increase valuation oo permit to $25,000.Details
revision to pa# 2007/12/07/9951. increase valuation oo permit to $25,000. | $25,000 |
| Dec 7, 2007 | Completed final sign-off Jun 2008 | 2911 25th Av | kitchen remodel. master bath @ 4th floor & kid's bathroom @ 3rd floor remodel. replace 20 windows. dry rot in front & remodel 1/2 bath @ 2nd floor.Details
kitchen remodel. master bath @ 4th floor & kid's bathroom @ 3rd floor remodel. replace 20 windows. dry rot in front & remodel 1/2 bath @ 2nd floor. | $65,000 |
| Oct 4, 2006 | Completed final sign-off Jan 2007 | 54 Inverness Dr | remodel kitchen: replace cabinets, counter top, etc. replace 2 windows (new vinyl sliding window) 2 lightwell. bathroom remodeling: replace bath tub, toilet bowl, vanity, shower pan, tile etc. replace window (new vinyl sliding window. min u-factor 0.67. new lighting to comply with title 24.Details
remodel kitchen: replace cabinets, counter top, etc. replace 2 windows (new vinyl sliding window) 2 lightwell. bathroom remodeling: replace bath tub, toilet bowl, vanity, shower pan, tile etc. replace window (new vinyl sliding window. min u-factor 0.67. new lighting to comply with title 24. | $28,000 |
| Apr 18, 2006 | Completed final sign-off Apr 2006 | 619 43rd Av | replace nine windows: (1) in family room,(2) kitchen,(2) bedroom, (1) closet, (2) sunroom, (1) bathroom. no change opening size. aluminum window, bronze (e) are aluminum no windows at front .67 u factor min.Details
replace nine windows: (1) in family room,(2) kitchen,(2) bedroom, (1) closet, (2) sunroom, (1) bathroom. no change opening size. aluminum window, bronze (e) are aluminum no windows at front .67 u factor min. | $4,300 |
| Feb 14, 2006 | Completed final sign-off Jun 2006 | 64 Sunview Dr | revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling &Details
revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling & | |
| Feb 6, 2006 | Completed final sign-off Jun 2006 | 64 Sunview Dr | kitchen remodeling: replace cabinet, countertop, bathroom remodel: replace bathtub, toilet bowl, vanity, shower pan, tileDetails
kitchen remodeling: replace cabinet, countertop, bathroom remodel: replace bathtub, toilet bowl, vanity, shower pan, tile | $95,000 |
| Nov 28, 2005 | Completed final sign-off Mar 2006 | 148 Park St | revision to 200506296401:remove rear sunroom and omit masterbed room closetDetails
revision to 200506296401:remove rear sunroom and omit masterbed room closet | |
| Jul 25, 2005 | Completed final sign-off Aug 2005 | 1330 30th Av | reroofingDetails
reroofing | $4,000 |
| Mar 25, 2004 | Completed final sign-off May 2004 | 543 Columbus Av | remodel existing coffee shop- no change in useDetails
remodel existing coffee shop- no change in use | $60,000 |
| Dec 18, 2003 | Completed final sign-off Dec 2003 | 4208 Anza St | replace sstucco on front of bldg.Details
replace sstucco on front of bldg. | $3,200 |
| Jul 2, 2003 | Completed final sign-off Dec 2003 | 4208 Anza St | replace 12 windows at fornt of house, no change opening sizeDetails
replace 12 windows at fornt of house, no change opening size | $6,800 |
| Apr 12, 2002 | Completed final sign-off Jul 2002 | 1210 Kirkham St | repair dry rot at front and side of structureDetails
repair dry rot at front and side of structure | $28,000 |