Back to bathroom remodel contractors
Nakai Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Jul 2012
- Last 24 months
- 0 permits filed
19 permits since 2000: 19 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2007 | Completed final sign-off Jun 2008 | 2911 25th Av | kitchen remodel. master bath @ 4th floor & kid's bathroom @ 3rd floor remodel. replace 20 windows. dry rot in front & remodel 1/2 bath @ 2nd floor.Details
kitchen remodel. master bath @ 4th floor & kid's bathroom @ 3rd floor remodel. replace 20 windows. dry rot in front & remodel 1/2 bath @ 2nd floor. | $65,000 |
| Oct 4, 2006 | Completed final sign-off Jan 2007 | 54 Inverness Dr | remodel kitchen: replace cabinets, counter top, etc. replace 2 windows (new vinyl sliding window) 2 lightwell. bathroom remodeling: replace bath tub, toilet bowl, vanity, shower pan, tile etc. replace window (new vinyl sliding window. min u-factor 0.67. new lighting to comply with title 24.Details
remodel kitchen: replace cabinets, counter top, etc. replace 2 windows (new vinyl sliding window) 2 lightwell. bathroom remodeling: replace bath tub, toilet bowl, vanity, shower pan, tile etc. replace window (new vinyl sliding window. min u-factor 0.67. new lighting to comply with title 24. | $28,000 |
| Apr 18, 2006 | Completed final sign-off Apr 2006 | 619 43rd Av | replace nine windows: (1) in family room,(2) kitchen,(2) bedroom, (1) closet, (2) sunroom, (1) bathroom. no change opening size. aluminum window, bronze (e) are aluminum no windows at front .67 u factor min.Details
replace nine windows: (1) in family room,(2) kitchen,(2) bedroom, (1) closet, (2) sunroom, (1) bathroom. no change opening size. aluminum window, bronze (e) are aluminum no windows at front .67 u factor min. | $4,300 |
| Feb 14, 2006 | Completed final sign-off Jun 2006 | 64 Sunview Dr | revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling &Details
revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling & | |
| Feb 6, 2006 | Completed final sign-off Jun 2006 | 64 Sunview Dr | kitchen remodeling: replace cabinet, countertop, bathroom remodel: replace bathtub, toilet bowl, vanity, shower pan, tileDetails
kitchen remodeling: replace cabinet, countertop, bathroom remodel: replace bathtub, toilet bowl, vanity, shower pan, tile | $95,000 |