Block 5656, lot 030
198 Bradford St
- City’s use
- Single Family Residential
- Built
- 1971
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,940 sq ft
- Lot
- 1,912 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2021 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | one bathroom remodel like to like. non-structural. no change of layout.Details
one bathroom remodel like to like. non-structural. no change of layout. | $7,000 |
| Feb 17, 2021 | Expired or cancelled cancelled Dec 2021 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | unit legalization per ordinace 43-Details
unit legalization per ordinace 43- | |
| Nov 6, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | install plywood sheathing on first floor and garage portal frame, install water heater seismic strap and gas meter seismic shutoff valve.Details
install plywood sheathing on first floor and garage portal frame, install water heater seismic strap and gas meter seismic shutoff valve. | $41,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | replacement of 9 windows and sliding door. existing and proposed aluminum windows.Details
replacement of 9 windows and sliding door. existing and proposed aluminum windows. | $10,100 |
| Sep 1, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | Bassad Inc./Dba: Everlast Construction | complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement.Details
complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement. | $101,720 |
| Mar 10, 2016 | Completed final sign-off May 2016 | 198 Bradford St | replace sheetrock (5) that had water damage, tile kitchen floor (8x10)Details
replace sheetrock (5) that had water damage, tile kitchen floor (8x10) | $500 | |
| Nov 14, 2002 | Never finaled issued Nov 2002, no final | 198 Bradford St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bassad Inc./Dba: Everlast Construction (5)
- Engineers
- Antonio Prado (2)
- Authorized agent-otherss
- Danielle Bohnik
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.