Permit GraphShortlistSan Francisco building permits since 2000

Syu-Mon Chang

License
C39459
Look the license up with the state
Listed as
engineer
On San Francisco permits
Nov 2011 to Dec 2019

11 permits since 2000 (engineer on 11 permits): 7 completed, 3 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 31, 2019Never finaled
issued Dec 2019, no final
266 Curtis StSuperb Builders Inc **See Notes**structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans.
Details
Permit
201912311081
Status
issued
Filed
Dec 31, 2019
Permit issued
Dec 31, 2019
Declared cost
$30,000
Address
266 Curtis St

structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans.

Open the permit page

$30,000
Nov 20, 2019Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall.
Details
Permit
201911207797
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 20, 2019
Final sign-off
Jul 2, 2020
Address
79 Central Av

rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall.

Open the permit page

Sep 27, 2019Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.
Details
Permit
201909272962
Status
complete
Filed
Sep 27, 2019
Permit issued
Sep 30, 2019
Final sign-off
Jul 2, 2020
Declared cost
$69,000
Address
79 Central Av

rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.

Open the permit page

$69,000
Nov 8, 2018Completed
final sign-off Nov 2019
175 Bluxome StGreen Sequoia Construction Group Inc#123: convert 1/2 to full bath. replace (e) stair with spiral stair.
Details
Permit
201811085405
Status
complete
Filed
Nov 8, 2018
Permit issued
Nov 9, 2018
Final sign-off
Nov 26, 2019
Declared cost
$10,000
Address
175 Bluxome St

#123: convert 1/2 to full bath. replace (e) stair with spiral stair.

Open the permit page

$10,000
Jan 29, 2018Expired or cancelled
cancelled Jan 2026
73 Mizpah StGold Constructorsrevision to pa #201705025469. additional footing required per city inspector.
Details
Permit
201801299804
Status
cancelled
Filed
Jan 29, 2018
Address
73 Mizpah St

revision to pa #201705025469. additional footing required per city inspector.

Open the permit page

Jan 31, 2017Completed
final sign-off May 2017
2159 47th AvBassad Inc./Dba: Everlast Constructionrev to pa#2017-0103-6428: revise foundation, revise (n) sliding door, remove storage room behind the building.
Details
Permit
201701318317
Status
complete
Filed
Jan 31, 2017
Permit issued
Feb 6, 2017
Final sign-off
May 25, 2017
Declared cost
$20,000
Address
2159 47th Av

rev to pa#2017-0103-6428: revise foundation, revise (n) sliding door, remove storage room behind the building.

Open the permit page

$20,000
Jan 24, 2017Completed
final sign-off Aug 2017
1411 Newcomb AvBassad Inc./Dba: Everlast Construction2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layout
Details
Permit
201701247783
Status
complete
Filed
Jan 24, 2017
Permit issued
Jan 24, 2017
Final sign-off
Aug 15, 2017
Declared cost
$30,000
Address
1411 Newcomb Av

2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layout

Open the permit page

$30,000
Dec 19, 2016Completed
final sign-off Jul 2017
655 Congo StNguyen Construction Co.1)convert extg storage & utility room on 1st floor to 2 bedrooms and one bath. conversion 622 sq ft. 2)volutary seismic retrofit for whole bldg to resist 30% more of seismic lateral force. 3)bring electric to code rewiring all house and replace all electrical fixtures. 4)replace all windows,
Details
Permit
201612195337
Status
complete
Filed
Dec 19, 2016
Permit issued
Dec 22, 2016
Final sign-off
Jul 7, 2017
Declared cost
$30,000
Address
655 Congo St

1)convert extg storage & utility room on 1st floor to 2 bedrooms and one bath. conversion 622 sq ft. 2)volutary seismic retrofit for whole bldg to resist 30% more of seismic lateral force. 3)bring electric to code rewiring all house and replace all electrical fixtures. 4)replace all windows,

Open the permit page

$30,000
Nov 3, 2016Never finaled
issued Nov 2016, no final
1119 Cayuga AvBassad Inc./Dba: Everlast Constructionremove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement.
Details
Permit
201611031889
Status
issued
Filed
Nov 3, 2016
Permit issued
Nov 4, 2016
Declared cost
$30,000
Address
1119 Cayuga Av

remove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement.

Open the permit page

$30,000
Jul 5, 2016Never finaled
issued Jul 2016, no final
29 Maynard StSuperb Builders Inc **See Notes**kitchen remodel, remove load bearing wall on 2nd fl
Details
Permit
201607051612
Status
issued
Filed
Jul 5, 2016
Permit issued
Jul 12, 2016
Declared cost
$20,000
Address
29 Maynard St

kitchen remodel, remove load bearing wall on 2nd fl

Open the permit page

$20,000
Nov 23, 2011Completed
final sign-off Dec 2014
72 Alvarado StR & R Constructionbasement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroom
Details
Permit
201111239544
Status
complete
Filed
Nov 23, 2011
Permit issued
Sep 12, 2013
Final sign-off
Dec 8, 2014
Declared cost
$100,000
Address
72 Alvarado St

basement-develop as per plans-add bedroom & bathroom, pour concrete floor & upgrade (e), upstairs-upgrade electrical, remodel bathroom & kitchen. add stairs to basement level bedroom

Open the permit page

$100,000