Green Sequoia Construction Group Inc
- Based in
- Alameda
- On San Francisco permits
- Nov 2017 to Oct 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2019 | Completed final sign-off Jan 2020 | 237 08th Av | replace (e) stair in-kind (like for like)Details
replace (e) stair in-kind (like for like) | $25,000 |
| Aug 27, 2019 | Completed final sign-off Dec 2019 | 130 Funston Av | remodeling 3 bathrms - hallway master and powder rm. hallway bathrm & powder rm will have like for like replacement of fixtures (inc lights) & finishes. hallway doorway will be enlarged. masterbedrm will inc replacement of (e) features & modify standing shower into new footprint. also will replaceDetails
remodeling 3 bathrms - hallway master and powder rm. hallway bathrm & powder rm will have like for like replacement of fixtures (inc lights) & finishes. hallway doorway will be enlarged. masterbedrm will inc replacement of (e) features & modify standing shower into new footprint. also will replace | $30,000 |
| May 1, 2019 | Expired or cancelled expired Apr 2024 | 855 Lincoln Wy | interior remodel of 2 bathrooms. master bath -tub shower converted to walk-in shower. hallway bath, walk-in shower converted to tub shower. no structural work. no framing modification.Details
interior remodel of 2 bathrooms. master bath -tub shower converted to walk-in shower. hallway bath, walk-in shower converted to tub shower. no structural work. no framing modification. | $15,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 855 Lincoln Wy | unit 4. remodel kitchen & 2 baths, replace flooring in entire home, add recessed lighting. no plans. like for like replacement of fixtures and finishes.Details
unit 4. remodel kitchen & 2 baths, replace flooring in entire home, add recessed lighting. no plans. like for like replacement of fixtures and finishes. | $100,000 |
| Mar 21, 2019 | Completed final sign-off Jan 2021 | 516 Dwight St | sagging support beam replacement in kitchen. ref to #201902132855 for interior work.Details
sagging support beam replacement in kitchen. ref to #201902132855 for interior work. | $10,000 |
| Feb 13, 2019 | Completed final sign-off Jan 2021 | 516 Dwight St | 2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter.Details
2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter. | $100,000 |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 909 Guerrero St | remove non load bearing column; cap gas line, add one outlet, paint & drywallDetails
remove non load bearing column; cap gas line, add one outlet, paint & drywall | $10,000 |
| Nov 8, 2018 | Completed final sign-off Nov 2019 | 175 Bluxome St | #123: convert 1/2 to full bath. replace (e) stair with spiral stair.Details
#123: convert 1/2 to full bath. replace (e) stair with spiral stair. | $10,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 1465 Hayes St | converting closet to (n) full bath. & install new window replacing existing window. not visible from the street.Details
converting closet to (n) full bath. & install new window replacing existing window. not visible from the street. | $10,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2018 | 10 Inca Ln | #1 -bathroom remodelDetails
#1 -bathroom remodel | $12,000 |
| Jan 11, 2018 | Completed final sign-off Feb 2018 | 2770 Taylor St | removing rusted metal sutds in service corridor. all concrete bldg wall is non- support 29' long 8' tall. replacing top and bottom plate, new studs and 2 layers 5/8" rock on one side. n/a for maherDetails
removing rusted metal sutds in service corridor. all concrete bldg wall is non- support 29' long 8' tall. replacing top and bottom plate, new studs and 2 layers 5/8" rock on one side. n/a for maher | $6,000 |
| Jan 9, 2018 | Completed final sign-off Mar 2018 | 591 46th Av | rear: replace four wood windows at rear with wood windows. max u-factor 0.32 or better.Details
rear: replace four wood windows at rear with wood windows. max u-factor 0.32 or better. | $9,500 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 10 Inca Ln | make a sub panel (up to 75 amps) inside apt # 1Details
make a sub panel (up to 75 amps) inside apt # 1 | $500 |
| Nov 15, 2017 | Never finaled issued Nov 2017, no final | 10 Inca Ln | unit 1: tear out (e) kichen cabinets and prepare for installation by others. add and move electrical to match new cabinets.Details
unit 1: tear out (e) kichen cabinets and prepare for installation by others. add and move electrical to match new cabinets. | $9,000 |